Post Job Free
Sign in

Engineer Civil

Location:
Mabalacat, Pampanga, Philippines
Posted:
November 17, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

Name: REY BENARAO TAGAMA (**-**-82)

Professional Lic. No. 0097392 (CE, Philippines)

Email: ********@*****.***

Tel: +639********* (Philippines)

Profession: Civil Engineer – Bridges & Rails Nationality: Filipino

Years of experience: 17

Current position: Rail & Bridge Engineer

Summary: Over 17 years of experience in management, supervision and construction of railway & mega bridges ranging from extradosed cable stay bridges, segmental precast box girder bridges, steel bridges, cast-in-Situ box girder, cast-in-situ post tension box girder and pre-cast AASHTO girder bridges. Worked in preplanning, scheduling, project monitoring and management, review & approval of bridge construction and relevant test methodologies, shop drawings and temporary works. Manage and direct site inspections and acceptance of technical reports ensuring project meets relevant project requirements and Construction Specifications.

Undertake coordination and implementation of railway track installation on bridge decks, track slabs, tracks with Embedded Rail Systems (ERS) and bridge construction operations from substructure works with soil stabilization, steel pipe sheet piles (SPSP) with stud welding, cast-in-situ bored piles, precast RC piles, pile load test and relevant non-destructive or destructive integrity pile test. Superstructure which includes the installation of Bridge bearings, shear keys, expansion joints, saddles and cable staying works as well as erections along with post tensioning works of segmental precast, cast-in-situ box girders using self-launching gantries, balanced cantilever using lifting frames, form traveller, incremental launching of steel girders, lifting by crawler cranes, bridge deck waterproofing and bridge load test carried out in static load and moving loads type.

Knowledgeable in technical writing. Ability to identify, analyse technical information, devise technical methods to simplify workable solution and systematize work and make decisions to resolve issues or site condition problems.

Education/Training:

BSc in Civil Engineering, Manuel S. Enverga Univ. Foundation, Philippines, 2003

Registered Civil Engineer – Philippine Regulation Commission lic. no. 0097392

Philippine Institute of Civil Engineers (PICE) - Member No.: 58247

Certificate, Computer - Aided Structural Analysis & Design (Staad.Pro), Manila, 2004

Certificate, Scaffold Training Institute (#STI30960), Kuwait, 2013

Experience Record:

2017 – PRESENT

DAEWOO E&C, Botswana/Zambia Africa

Rail & Bridge Engineer, Extradosed Cable Stay Bridge

2016 - 2017

COWI & PARTNERS LLC, Muscat Oman

Senior Bridge Engineer

2013 – 2016

RIZZANI DE ECCHER-OHL-BOODAI-TREVI JV, Kuwait

Bridge Diaphragm Engineer

2011 – 2013

HOCK SENG LEE BERHAD, East Malaysia

Project Engineer, Bridge/Flyover

2011 – 2011

WOODFIELDS CONSULTANTS, INC., Philippines

Resident Engineer, Bridge/Steel Flyover

2009 – 2011

NORTH LUZON RAILWAYS CORPORATION (NORTHRAIL), Philippines

Senior Civil Engineer, PMO

2005 – 2009

GLOBAL UPLINE SDN. BHD., Kuching, East Malaysia

Project&Airfield Engineer, Bridges/Flyover & Airport

2003 – 2005

WELMANVILLE DEVELOPMENT CORP., Philippines

Supervising Engineer

Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:

Botswana/Zambia Africa, Kazungula (2017 – Present) DAEWOO E&C

Project: KAZUNGULA BRIDGE PROJECT (Curved Extradosed Cable Stay Bridge)

Project Cost: USD 260 Million

Rail & Bridge Engineer – Construction of pre-stressed concrete 923m extradosed curved cable stay bridge with 12 pylons and a single railway line using ERS [Embedded Rail System by Edilon)(Sedra] at center strip and roll-over track slabs at approaches/abutments crossing the Zambezi river. The bridge comprises of 6 stay cables each pylon and a total of 9 spans with 129m main spans. The substructure foundations consist of spread footing supported by bored piles built with sheet piles cofferdam and spread footing connected monolithically with steel pipe sheet piles (SPSP) foundations with stud welding. Superstructure is built by form traveler 3~4m cast-in-situ segments in typical balanced cantilever method with extradosed stay cables and props supported/anchored for side spans. Direct and supervision of works accordance to relevant approved drawing and construction methods within contract specification. Write correspondences, manage/coordinate inspections and technical issues with consultants.

Muscat, Oman (2016 – 2017) COWI AND PARTNERS LLC

Project: BIDBID – SUR ROAD DUALIZATION PROJECT – SECTION II (IBRA – SUR) 56KM

Project Cost: 92 Million Omani Riyal

Senior Bridge Engineer – Project supervision for construction of 4 no’s cast-in-situ Post Tension Arch-Type Interchange Bridges and 4 no’s of WADI Post Tension pre cast 30 meter 378 no's of AASHTO girder Twin Bridges. Ensure that Project is constructed in accordance to approved drawings, Oman standard, special project specification including AASHTO LRFD Bridge Construction Specification. Assist Resident Engineer in overall project management, review, evaluate, recommend and approval of contractor’s method statements, shop drawings, temporary works and submittals pursuant to the relevant contract specification.

Kuwait (2013 – 2016) RIZZANI DE ECCHER-OHL-BOODAI-TREVI JOINT VENTURE PROJECT: JAMAL ABDUL NASSER PROJECT (RA 167), KUWAIT

Project Cost: USD 859.7 Million

Bridge Diaphragm Engineer - Manage diaphragm works, construction of 6 to 8 lane 14km elevated highway/viaduct with 4 level interchange on Ghazali road, depressed road with two roundabout bridges and 3 interchanges made of prefabricated/precast segments. Segment erections are carried-out using Deal self-launching gantries for full span and Deal lifting frames including crawler cranes for balanced cantilever erections. Direct the operation of over 200 no’s. of cast in situ Superstructure Diaphragms.

Malaysia, Kuching (2011 – 2013) HOCK SENG LEE BERHAD.

PROJECT: JALAN SONG-JALAN TUN JUGAH-UPLAND INTERCHANGE

Project Cost: RM50 Million

Project Engineer - Oversee the two 318 meter dual-carriageway cast-in-situ concrete voided deck flyover at Jalan Song-Tun Jugah Junction and upgrading Jalan Tun Jugah, Jalan Song, and Jalan Laksamana Cheng Ho. Ensure that a project meets all contract and regulatory requirements to the predetermined schedule including coordination and management of subcontractors.

Philippines, (2011 – 2011) WOODFIELDS CONSULTANTS, INC.

PROJECT: DEPARTMENT OF PUBLIC WORKS & HIGHWAYS - MEGA BRIDGES FOR URBAN & RURAL DEVELOPMENT OF THE PRESIDENT’S BRIDGE PROGRAM

COMPLETED PROJECT: PUERTO SAYRE FLYOVER – CAGAYAN DE ORO CITY

Project Cost: PHP363 Million

Resident Bridge Engineer - The project involves in construction of 400 bridges and 12 flyovers in urban and rural areas of the country (Philippines). The permanent flyover is prefabricated modular steel technology from France developed by Eiffel & Matiere, erected by incremental launching 195 lineal meter long consist of five spans, four piers supported on 1.5-meter diameter bored piles and 120 lineal meters approach. Ensure all construction is done in accordance with the design and specification and that all works are executed to the agreed standard. Design and analysis of substructures (Abutments, wingwalls, corbels and approach slabs).

Philippines (2009 - 2011) NORTH LUZON RAILWAYS CORPORATION (NORTHRAIL)

PROJECT: NORTHRAIL: PHASE 1 – CALOOCAN TO CLARK FREE ZONE (CONSTRUCTION OF THE 82KM NORTHRAIL PROJECT, RAIL LINE WHICH LINK CALOOCAN CITY TO CLARK SPECIAL ECONOMIC ZONE IN PAMPANGA PROVINCE)

Project Cost: USD 1, 301.59 Million

Senior Civil Engineer, PMO - Oversee the Construction of concrete Bridges/Viaducts, including Frame Bridges/Culverts, soil stabilization, Stations and all finishing works required. Assist Technical Manager & Quantity Surveyors on Technical matters concerning Design, Invoicing & Variation orders. Arrange and lead site meetings held at regular intervals with Contractors management team. Provide technical support as may be required in relation to the proposed design modification of the project. Monitor day-to-day operations of the projects/activities, objectives and budget, coordinate activities with contractors and other government entities regarding progress and quality control.

Malaysia, Sarawak (2005-2009), GLOBAL UPLINE SDN. BHD.

PROJECT (1): UPGRADING OF KENYALANG INTERCHANGE (FLYOVER/BRIDGES) AND NEW KIA/STUTONG LINK ROAD, KUCHING, SARAWAK MALAYSIA

Total Project Cost: RM90 Million

Project Engineer - Ensure Project schedules are meet. Supervised the construction of cast-in-situ superstructure consists of five (5) flyover bridges ranging from 247m to 461m long giving a total of 1835m. Each bridge carries two 3.5m traffic lanes with marginal strips on both sides of the carriageway. Liaise to Project Manager and Designer or Consultants regarding on site problems and discrepancies among drawings.

PROJECT (2): UPGRADING PUJUT AND PUCHONG INTERCHANGES (FLYOVER/BRIDGES), MIRI, SARAWAK MALAYSIA

Project Cost: RM82.4 Million

Project Engineer - Supervised the construction of two flyover (Pujut & Puchong – twin 2 Lane Bridges 498m & 508m), widening and rehabilitation of existing roads. Manage subcontractors, prepare, and review technical reports.

PROJECT (3): A. REDEVELOPMENT OF KUCHING INTERNATIONAL AIPORT (REKIA PROJECT)

B. RELOCATION OF EXISTING TUDM (AIR FORCE) FACILITIES AND

REALIGNMENT OF PUBLIC ROADS AT WESTERN RUNWAY END OF KIA (KUCHING INTERNATIONAL AIRPORT)

Total Project Cost: RM850 Million

Airfield Engineer - Supervised Civil and Earthworks at airside (Excavation, Backfilling/Embankment, Grading and Proof Rolling) including coordination with AGL works (aeronautical ground lighting) prior to extension of Runway/Taxiways (From 2454m to 3780m and shoulders from 46m to 60m) Parking Aprons, Roads and Aircraft Hangars. Ensures laboratory results and suitability of pavement materials. Responsible for Earthworks settlement gauges for monitoring settlements taking place under the embankments during and after construction period (Embankment height from 12m to 18m). Manage, prepare works schedule and responsible for NOTAM (Notice to Airmen).

Lucena City, Philippines (2003 - April 2005) WELMANVILLE DEVELOPMENT CORP.

Supervising Engineer - Structural design, cost and estimates up to three storeys of the project residential houses. Monitoring works schedule and work details programmed for the construction and evaluation of work progress prior to claims and payments. Coordinate between clients, authorities, contractors and suppliers.

Language:

Speaking

Reading

Writing

English

Excellent

Excellent

Excellent

Malaysia

Filipino/Tagalog

Excellent

Excellent

Excellent

Excellent

Medium

Excellent

REFERENCE

(1) Mr. Tae-il Kim (Zambia +260-**-*******) – *****.***@*********.***

Project Manager – Kazungula Bridge Project

(2) Mr Mohamed Ayaz Beg (India +841*********) – *******@*****.***

Team Leader – Egis India Consulting Engineers Pvt. Ltd.

(3) Mr Rajendra Shrestha (Oman +968-****-****) – ****@****.***

Head of department – Transportation, COWI and Partners LLC

(4) Engr. Henry C. Medina (Philippine +63 2 4367360) – *******@***.***.**

VP/Project Director, PMO Engineering – Woodfields Consultants, INC.



Contact this candidate