Post Job Free
Sign in

Power Plant Engineer

Location:
Kushal Nagar, Gujarat, India
Salary:
50000
Posted:
November 16, 2020

Contact this candidate

Resume:

DevasisPanigrahi

Near GM Link Road

Goregaon (E), Mumbai-400063

Contact No: 846-***-****

E-mail:*************@*****.***

CARRIER OBJECTIVE:

I have 9 year experience in Electrical & instrumention and control of construction, erection, commissioning and QA/QC Engineer in industrial water purification and distribution system .i have commissioned two number of DM plant having capacity 60M3/hr. With proven skills in troubleshooting of complex Instrumention and control system with a knowledge in international standards. Capable of reading and interpreting different type of instrument drawings.

PROFESSSIONAL EXPERIENCE(In reverse Chonological order):

Currentlyworking -Purita Water Solutions PVTLTD, Mumbai

Position-FieldcommissioningEngineer(Electrical and Instrumention and Control)

Site-NuclearpowercorporationindialtdKakraparSuratGujarat

Package-CLO2 Plant

Capacity-58 m3/h

Duration-Augest 2020 ToTill now

Responsibility

Prepare the regular site progress reports forE&I related parts/system&equipment.

Prepare the hook up drawing and approved from client.

ErectioncommissioningFlowTx,Airoperatedpneumaticvalve,controlvalve,Acctutor,conductivitymeter,Phmeter, Chlorinedioxideanalyzer,WithrespecttoAllenbradely(Rockwell)PLC.

Erectionof Junctionbox,termination of all the instruments toJB and fromJbToPLC done at site.

TerminationofallthecontrolcablefromMCCpaneltoPLCpanelDoneatsite.

Support thePLC vender for AutoCommissioningCLO2 Plant.

Prepared erection and Commissioning Protocol atSite.

Calibration Of all The instruments as per site Requirements.

CableMeggeringandEarthingandTerminationofalltheMotorWithRespecttoMCCpanel

Commissioning Of MCC panel done at Site.

PLC program Modification,Mapping of all control valve and interlocks modification done at site. Create a new tag with respect to allenbradely PLC done at Site.

Tags creation on a SCADA done at site.Making protocol and follow up the bill proceed from site.

Daily Work report submitted toclient and service manager.

Erection and commissioning of Storage Area,DW CLO2 Working Skid,DW Standby Skid,NDCT/IDCT/PTP Skid and N-pitarea followedbyP&ID,GAdrawing.

Instrument airline erection and commissioning done at site.

All type of air solenoid valve erection and commissioning done at site.

Impulse piping and cable tray erection done at site as tray schedule& Hook up drawing.

Designing modification of electrical and plc drawing done at site.

Understanding the PLC logic and modified the program as per process requirement done at site.

Review and approve for various I&C system like PLC logics,Commissioning Procedure, System Description, ControlPhilosophy, datasheet, location and installation drawings.

Prepare/proposed documents for review and approve the various type of E&I testing equipment, material and plant done at site by the witness of client.

Review and perform various type E&I material receiving inspection done at site.

Perform and witness of plant test in auto mode.

Assist the Electrical /instrumention maintenance department for equipment repairs.

Records the site modify documents and make field change proposal approve from clients.

Electrical lighting and Motor power and control cable done at site.

Commissioning of all Motor /Electrical equipment’s done at site..

Employer:Techno Aqua tech PVT LTD,Vishakapatanm

Position-Field commissioning Engineer(Electrical and Instrumention and Control )

Site-Nuclear power corporation indialtd Kakrapar Surat Gujarat

Package-DM PlantCompleted

Capacity-3x100 m3/h

Duration-FEB2019 ToJuly 2020

Responsibility

Prepare the regular site progress reports for E& I related parts/system & equipment.

Prepare the hook up drawing and approved from client.

Erection and commissioning FlowTx,pressureTx, Air operated pneumatic valve,control valve, Acctutor,conductivity meter, Ph meter, TOC Analyzer, Chlorine dioxide analyzer,silica analyzer,sodium analyzer With respect to Allenbradely(Rockwell) PLC.

Erection of Junction box,termination of all the instruments to JB and from Jb To PLC done at site.

Termination of all the control cable from MCC panel to PLC panel Done at site.

Support the PLC vender for Auto Commissioning DM Plant.

Prepared erection and Commissioning Protocol at Site.

Calibration Of all The instruments as per site Requirements.

Cable Meggering and Earthing and Termination of all the Motor With Respect to MCC panel

Commissioning Of MCCpanel done at Site.

PLC program Modification,Mapping of all control valve and interlocks modification done at site.

Create a new tag with respect to allenbradely PLC done at Site.

Tags creation on a SCADA done at site.

Making protocol and follow up the bill proceed from site.

Daily Work report submitted to client and service manager.

Erection and commissioning of DMF,ACF,SBA,WBA,SAC,WAC,MB, Bulk acid and alkali storage tank, degassed tank, DG blower, waste water disposal pump N- pit transfer pump followed by P&ID,GA drawing.

Instrument airline erection and commissioning done at site.

All type of air solenoid valve erection and commissioning done at site.

Impulse piping and cable tray erection done at site as tray schedule& Hook up drawing.

Designing modification of electrical and plc drawing done at site.

Understanding the PLC logic and modified the program as per process requirement done at site.

Review and approve for various I&C system like PLC logics,Commissioning Procedure, System Description, ControlPhilosophy, datasheet, location and installation drawings.

Prepare/proposed documents for review and approve the various type of E&I testing equipment, material and plant done at site by the witness of client.

Review and perform various type E&I material receiving inspection done at site.

Perform and witness of plant test in auto mode.

Assist the Electrical /instrumention maintenance department for equipment repairs.

Records the site modify documents and make field change proposal approve from clients.

Electrical lighting and Motor power and control cable done at site.

Commissioning of all Motor /Electrical equipment’s done at site.

Employer: AQUA DESIGN INDIA PVT LTD, Chennai

Currently working in as an E &I Engineer

Role: Field Commissioning& Erection Engineer(AS a Site Incharge)

Duration-June 2018 to jan2019

SITE COMPLICATION-Kothagudam thermal Power plant

CAPACITY- DM Plant 2x60M3/hr

Experienced Site Engineer with a demonstrated history of working in the environmental services DM plant, WTP, ETP, industry. Skilled in PLC and process control instruments,MCC panel Energy, Renewable Energy,

Erection and commissioning of DM plant60 m3/hr

Erection and commissioning of DMF,ACF,SBA,WBA,SAC,WAC,MB, Bulk acid and alkali storage tank, degassed tank, DG blower, waste water disposal pump,n- pit transfer pump followed by P&ID,GA drawing.

Instrument air line erection and commissioning done at site.

All type of air solenoid valve erection and commissioning done at site.

Impulse piping and cable tray erection done at site as tray schedule.

All type of process flow instrument like pressure transmitter, pressure gauge, pressure switch, temperature transmitter, temperature gauge, flow transmitter, rot meter, conductivity meter, pH meter, all are erection and commissioning with respect to PLC done at Site.

Instrument schedule and hook up drawing used for erection of all instruments.

Internal vessel piping WAC, SAC,WBA,,SBA,MB done site .

Silica, sodium and chlorine analyzer installation done at site with the support of vendor.

PLC panel commissioning done by the support of vendor.

Coordinate with customer, contractor, vendor & corporate office.

Making a protocol for billing purposes.

Electrical Motor and heater installation done at site.

Auto valve installation at site.

Vendor Line Up.

Daily progress report.

Employer:Capital Control India PvtLtd,Mumbai

Chlorination and CLO2 Plant& WTP& ETP

Duration-FEB 2013 To MAY 2017

SITE COMPLICATION-National Thermal Power Plant, Unchaar(U.P)/India

NORTH EAST ELECTRICITY POWER CORPORATION (TRIPURA)

GAJURAT ELECTRICITY BOARD (GACL)

GAIL (U.P)

DAMBALLA WATER BOARD,(SRI LANKA)

NORTH EAST ELECTRICITY POWER CORPORATION (TRIPURA)

VISAKAPATANM STEEL PLANT (A.P)

ADANI POWER LTD (RAJASTAN)

VATECH DAMBULLA(SRI LANKA)

BANGALADESH POWER LTD(BANGALADESH)

Erection and commissioning of ETP plant 30 MLD

Erection and commissioning of COARSE SCREENS CHAMBER, EQUALIZATION TANK,CHEMICAL DOSING,COGULANT DOSING,CLARIFIER,SLUDGE DRYING BED,MBBR,DUAL MEDIA FILTER, ACTIVATED CARBON FILTER, followed by P&ID,GA drawing.

All type of process flow instrument like pressure transmitter, pressure gauge, pressure switch, temperature transmitter, temperature gauge, flow transmitter, rota meter, conductivity meter, pHmeter, all are erection and commissioning with respect to PLC done at Site.

All type of pump like raw sewagepump, flashmixer, flocculationpump, sludge recirculation pump all motor are commission with respect to MCC.

all type of auto valve and actutator erection and commissioning

Handling the client and worker. Raw knowledge about rapid gravity filter,lamella clarifier and raw water pump house and chemical dosing pump like alum poly and chemical NAOH and ACID.

Daily Discuss with Client regards trouble shooting issues.

Commissioning and problem solvingaccordto work order and site requirement.

Follow the client accordingly for spare requirement.

Daily Work report submits to manager.

Line up the Contractor and handling the worker.

Follow up the vendor if any technical issues arise in Site equipment.

Resolving the issue independently and demonstrate the client.

To start the Plant in auto mode, install the auto valve, to control the dosing.

Leak detector with sensor install for safety system.

Check the Pipe line requirement pressure and vacuum, Flow rate, according to control the chlorine

by chlorine analyzer.

Weight scale installation on site.Handling PLC vendor for plant commissioning.

Installation & commission of all type Field Instruments as Level Transmitter, DP Transmitter, PID,

Controller, level switch and flow meter conductivity meter, pressure transmitter.

Commission of DOL and VFD control panel independently MCC and PLC.

VFD programming done at site by the support of VFD vendor.

Prepared Protocal as Per Site Requirement site.

Having experience in Switchgear trouble shooting.

Also having Experience in Chlorine and sodium and silica analyzer commissioning.

Erection and commissioning of PLC panel.MCC panel water treatment plant power sector.

Editing of PLC panel using Ladder logic Diagram.

All type of testing like redundancy testing, instrumentation earth done at site.

Installation & commission of Field Instruments as Level Transmitter, DP Transmitter, PID, Controller, Timer, Indicator, level switch, pressure transmitter, vaccum switch, water level switch, pressure switch, related to Temperature, Pressure, vacuum, Flow, Levels and also Sensor RTD,Electrical motor, Solenoid Valves, Analyzer, Motorized valve.

Responsible for Control & Instrumentation related work as smooth operation from PLC, Level switches, Type Level transmitter, pressure transmitter, pressure switch etc.

Preparing of Preventive maintenance schedule, Daily report, Attendance& Leave record, performance Test during project at site and handling the contractor and its worker in a site.

Knowledge of Level Switch, DP Switch, Flow Transmitter, Pressure Switch, Temperature Switch etc.

Familiar to P&I diagrams, Electrical Drawings equipment layout drawing.

Complete Chlorination in CLD Erection and MCC installation done at site.

All type of load Test is doing inside a site.

Erection and Commissioning done for all type of motor related to Electrical and 3 phase induction heater at site.

Client Representation and documentation (Protocol) Prepare and represent in a site.

Provide technical instruction and assistance to customer representatives regarding installation, operation, calibration, repair and maintenance at customer's sites

PLC logic onsite modification. Devlop a new logic as per client requirement.

Employer: MYKO Electronics Pvt. Ltd.

Duration: Aug 2011 to Jan-2013

Designation: Service Engineer

Job Responsibility:

Responsible for Installation, Servicing of electronic components and equipments like as AC Drive, PID, Controller, Timer, Indicator, Counter related to Temperature, Pressure, Humidity, Flow, Levels and also Sensor (PT 100).

Servicing, Testing

Help & support to all field engineers for their issue.

Maintenance & Service of complete product by manually.

Demonstration & Installation of Product.

Update all final record & database.

To study and prepare Quality checklist.

EDUCATIONAL QUALIFICATION:

B.Tech in Electronics & Communication from Institute of Advanced Computer & Research, B.P.U.T, Odisha.(2006-2011)

12th from Pudamari Science College, C.H.S.E, Odisha.(2004-2006)

10th from Chaitanya VidyaPitha, B.S.E, Odisha.(2004-2006)

ACADEMIC PROJECT:

Project Title : A Sensor Network in Industrial Application

Team Size : 10

Role : Assembler

Duration : Final Year B.Tech

COMPUTER SKILLS:

Auto Cad, MS Office -(MS-Word, Ms-Excel, Ms-Power point, Internet), Windows XP

PERSONAL PROFILE:

Date of Birth : 20th Apr 1989

Father’s Name :Mr. SimanchalPanigrahi

Marital Status : Married

Languages Known : Hindi & English

Hobbies : Playing Cricket, Following recent news and topics.

Passport No- : N0667113

DECLARATION:

I hereby declare that the above-furnished information is true to the best of my knowledge.

Date: (DEVASIS PANIGRAHI)



Contact this candidate