Post Job Free
Sign in

Engineer Design

Location:
Chennai, Tamil Nadu, India
Posted:
November 15, 2020

Contact this candidate

Resume:

Page * of *

CURRICULUM VITAE

J.ARUN KUMAR

S/o R.Jayapal

***,*********,

Kangalacheri (Po),

Nannilam (Tk),

Tiruvarur (Dist),

India.610101.

Contact No: +91-900*******

E-Mail:

*******.***@*****.***

Personal details

Date of Birth : 08.01.1989

Nationality : Indian

Sex : Male

Marital Status : Married

Passport No : U6854302

Date of Expiry :20/01/2030

Languages Known:

• Tamil

• English

• Hindi

Objective

Certified engineer with Eight years experience in Testing and Commissioning of 415V-400kV substation power system products and execution of projects related to powersystem.Expertise in testing of Relay,Relay coordination,Switchgear Interlock,CT,PT, Power Transformer .I have knowledge in Eplan,Etap,Autocad. I look forward for an opportunity to display my skills in the Execution of projects related to power systems.

Professional Details

Bachelor of Engineering (B.E.,) – Electrical & Electronics Engineering

(2006-2010), (Anna University), Acadamic Percentage - 75 % Institute: Anjalai Ammal Mahalingam College of Engineering, Kovilvenni, Tamil Nadu.

HSC – (2004- 2006), Acadamic Percentage – 71.75 % School : V.S.boys.Hr.Sec.School, Tiruvarur, Tamil Nadu. Skill Set

Testing and commissioning of Numerical and Electromagnetic Relays of SIEMENS, ABB, ALSTOM,TAPCON. PowerTransformer Testing,Testing and Troubleshooting of Control Relay Panel,Local Control Cubicle

,Switchgear.

Work Experience

Organization :

M/s. WINSTAR ELECTROMECHANICAL WORKS W.L.L,

QATAR

Designation : Protection Engineer

Period : Sep 2015 to Jan 2019

Organization : M/s. INEL POWER SYSTEM (P) LTD, CHENNAI Designation : Assistant Engineer

Period : Mar 2013 to Aug 2015

Organization : M/s. AGECO INTERNATIONAL FZE, DUBAI Designation : Site Engineer

Period : Mar 2012 to Jan 2013

Organization :

M/s. SHREE ABIRAMI ENGGINEERING WORKS,

CHENNAI

Designation : Engineer Trainee

Period : Mar 2011 to Feb 2012

Page 2 of 5

Projects Worked in the Qatar

66/11kV MILAHA Substation

132/22kV NP-2 Substation

220/66/11kV RAH SUPER Substation

66/11kV RAH-2 Substation

66/11kV AL MERGAB STREET Substation

132/11kV BIRKAT AL AWAMER Substation

Job Responsibilities at Site

Testing of protection relays and Bay Control Unit.

Relay Final Setting.

protection panel scheme checks.

Local and BCU Synch,Local and Remote Interlock Checks.

Breaker Failure Scheme and Tripping Checks.

Trip circuit supervision & Trip Logic scheme checks.

Busbar Stability & Sensitivity checks.

Transformer Stability & Sensitivity checks.

End to End Testing.

Overall Stability.

Testing of Auxiliary relays.

CT,VT Secondary & Primary Injection.

SCADA Measurement & Protection signals test.

RTCC Functional Checks.

Projects worked in SIEMENS Kalwa Factory - Mumbai

KAHRAMAA- Qatar General Electricity & Water Corporation QATAR PHASE XI Projects

Packages L&T, ETA, ETTS,NCC

Doha Industrial-G (66/11kV)

Althumma Super(220/66/11kV)

RAH Super(220/66/11kV)

New port (220/66/22kV)

Education City-8 (66/11kV)

Police Training Institute (66/11kV)

Al Daayen (132/11kV)

Al Themaid (132/11kV)

DOMESTIC PROJECTS

Tata Steel, Kalinganagar (220kV)

PGCIL,Vadodara(765kV)

NTPC,Vindhyachal (400kV)

Page 3 of 5

Job Responsibilities at Factory

Panel Inspection and Troubleshooting at Vendor SIte.

Check Relay Configuration and Troubleshooting IED Files.

Panel General Arrangements Verify and Update.

Relay Firmware,Parameter Set Version Changes.

Testing of protection relays and Bay Control Unit.

Verify Control Relay Panel, Local Control Cubicle,RTCC Wiring as Per Schemes and Troubleshooting.

BCU Synch and Interlock Checks.

Correction in Schemes and Relay Configuration and Prepare For Final Asbuilt copy.

Check Bill of Material, Name Plate Details.

Factory Acceptance Test Report Preparation.

Customer Inspection.

Handle and Supervise Teams.

Transformer Testing

Insulation Resistance Test

Ratio Test

Magnetizing Current Checks

Magnetic Balance Checks

Vector Group Test

Open Circuit Test

Short Ciruit Test

Winding Resistance Test

Calibration of Winding and Oil Temperature Meter.

Tan Delta Test.

Projects Worked in Transformer Testing

Testing of AREVA make 288MVA power transformer in M/s ADITYA BIRLA, M.P.state, India.

Testing of AREVA make 100MVA power transformer in M/s KPTCL, Karnataka, India.

Testing of BHEL make 100MVA power transformer in M/s ADITYA BIRLA, Odisha, India.

Testing of power transformer in TNEB & RAILWAY Sub Station 132kV, India.

Testing of AREVA make 40MVA Reactor in M/s PGCIL Sub Station 400kV Ranchi, India.

Testing of AREVA make 500MVA power transformer in M/s PGCIL Sub Station 400kV Lucknow, India.

Testing of AREVA make 100MVA power transformer in M/s AP TRANSCO Rajahmundry, India

Inspection & Testing of cable box, ABB Make 84.1 MVA, 132/1.37KV Regulating and Rectifier Transformer at M/s Dubal Aluminum, Jebel Ali (Dubai). Page 4 of 5

Handled Relays

SIEMENS Relays

Non-Directional Over Current & Earth Fault Relay - (7SJ61,7SJ801,7SJ802)

Directional Over Current & Earth Fault Relay - (7SJ62)

Synch Relay (7SJ640,7SJ804)

Transformer Differential Protection Relay– (7UT613)

Line Differential Protection Relay - (7SD522)

Distance Protection Relay – (7SA522)

Bay Control Unit - (7SJ64,6MD66,6MD85)

Bus Bar Protection Relay- (7SS522,7SS523)

Load Shedding Relay(U/F,O/F)-(7SJ62)

RTCC –TAPCON 260

ALSTOM & ABB Relays

Line Differential Protection Relay – (P545)

Non-Directional Over Current & Earth Fault Relay (P141)

Synch Relay (P143)

Line Differential Protection Relay – (RED670)

Schemes Handled

SIEMENS

ABB

ALSTOM

L & T

Equipment Handled

Omicron test kit - CMC256,CMC353,CMC356.

Doble test kit.

ISA test kit

Contact resistance measurement (CRM) test kit.

Insulation resistance tester.

Tan delta test kit.

CPC 100.

ODEN test kit.

Page 5 of 5

Software Known

DIGSI 4.89, DIGSI4.90, DIGSI 5.

MICOM S1 STUDIO.

PCM 600.

MR SUITE.

AUTOCAD 2016.

ETAP 19.0.

EPLAN ELECTRIC P8 2.7.

MS OFFICE.

Approvals For Working in Kahramaa Substation at QATAR Approving Consultants Approved For

ENERGO PROJEKT,

MOTT MAC DONALD,

PARSONS BRINCKERHOFF

1. Scheme Checks.

2. Auxiliary relays.

3. Protection Relay Testing

4. Relay Final Setting

5. CT/VT Secondary,Primary

injection.

6. Breaker Failure Checks

7. Load Shedding Checks

8. TCS AND TRIP LOGIC Checks

9. End to End test

10. Overall Stabilty.

11. 11kV Busbar Stability and

Sensitivity

12. Local and Remote Interlocks.

Declaration

I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. Place: yours faithfully

Date: J.ARUNKUMAR



Contact this candidate