Rana Samir Balvantsinh
A/* VARIS PARK SOC.,
OPP.PUSHPAM HEIGHTS,
NEAR MADHUNAGAR,
GORWA,
VADODARA – 390016
Mobile: 91-990*******/ 704-***-****
E- mail: adhtnd@r.postjobfree.com / adhtnd@r.postjobfree.com
Electrical Design Engineer (Current position in the company)
To seek acquire a leading and challenging position in the electrical design & engineering profession with a prominent organization that helps in improving my skills.
ORGANISATION: BOUSTEAD SALCON PROCESS PVT. LIMITED
OFFICE: 402, ATLANTIS HEIGHTS, BESIDE CENTRE SQUARE MALL, VADODARA,
DESIGNATION: E & I Engineer
Duration: 1st Jan 2018 to Till Date
Department: Engineering
Company Profile: The Company was established in 1980, Boustead Salcon (SINGAPORE) has delivered advanced proven water and wastewater treatment technology to help our clients to meet their changing water needs across more than 800 projects in 60 countries globally. Boustead Salcon Water Solutions Pte Ltd., a water and environmental engineering company, provides design, construction, project management, and operation and maintenance services for water and environmental utilities/infrastructure developments to public and private sector clients in Singapore and internationally.
Electrical DESIGN ENGINEER (B.E. ELECTRICAL)
PROFILE:
●Professionally matured Electrical engineer with career success of in basic and project management, detailed design for water and waste water in oil and gas plant engineering.
●Designing, engineering, pre-tendering for hydro power, pumping power and irrigation projects in the field included electromechanical
●Prepare Electrical and instrument Hook-up, loop-up diagrams for the projects.
●Prepared Electrical Loads list, Equipment Sizing, Instrument Plot plan Drawings, Cable tray drawings, General arrangement drawings, Electrical equipment Layout.
●Check control and power Logic diagrams as per client requirement.
●Responsible for the electrical design contents together with its approval with client.
●Prepared electrical lighting, power distribution design (HV, MV & LV), earthing and lightning protection, fire and voice alarm systems, telecommunication services, low current and extra low voltage services, automatic controls, BMS and as well as other related electrical require utility systems in project.
●Conduct the project progress meeting with internal department and also with client for smooth work.
●Preparations of bids and proposals on the commercial and technical sides.
●Responsible work with office support to the Construction, Supervision team for approval and submittal of material and shop drawings.
●Current rating calculations for Requirement in Single line diagram for Hydro electrical power projects and pumping power and irrigation projects.
●Prepared 11 kV, 33 kV, 66 kV, 110 kV& 220 kV switchyard layouts for substation.
●Fault level calculations of system.
●Prepared LT panel drawing auxiliaries like cooling water, oil pumping unit, ventilation system, vibrating monitoring systems.
●Knowledge for project management & co-ordinate with sales team.
●Designing of Earthing system, sizing of earthing conductors, calculations for earth pits etc.,
●Preparation of conduit layout, control diagrams, schematic diagrams, DB schedule etc.
●Design of LT & HT cable layout, power distribution system, electrical rooms & DG rooms, Transformer& DG installation, Lighting arrestor & earthing Network etc.
●Preparation of quotations and BOQ required as per system.
●Preparation of electrical approval as per standards.
●Routine Site inspections,
●Lighting Design using Photo lux and CG lux,
●Cable sizing calculations.
●Lighting calculations.
Electrical system design engineer
To seek acquire a leading and challenging position in the electrical design & engineering profession with a prominent organization that helps in improving my skills.
ORGANISATION: JYOTI LIMITED
PLANT: NANUBHAI AMIN MARG, NEAR PANDYA BRIDGE, VADODARA,
DESIGNATION: Executive Engineer
Duration: 18th July 2012 to 25th Dec 2017
Department: Electrical System Engineering
Company Profile: The Company is manufacturer of LT & HT motor, pumps, switchgear, relay and RMU, Company under takes work related to EPC contract for pumping station & Hydro Projects.
SYSTEM DESIGN ENGINEER (B.E. ELECTRICAL)
PROFILE:
●Professionally matured Electrical engineer with career success of in basic and project management, detailed design engineering.
●Proven technical competencies in designing, commissioning of electrical and control system for Transformer and switch gear facility in wide range of industries.
●Capable of designing in entire range of Project related activities including-
-Designing of HV and LV distribution for various Hydro & pumping stations.
-Designing of substations, Transformer Yards, Transformer sizing, DG set sizing, Generator sizing, UPS sizing, cable sizing complete with necessary protection.
-Designing of lighting and power distribution system complete with necessary protection for classified areas.
-Current rating calculations for Requirement in Single line diagram for Hydro electrical power projects and pumping power and irrigation projects.
-Prepared 11 kV, 33 kV, 66 kV, 110 kV& 220 kV switchyard layouts for substation.
-Fault level calculations of system.
-Prepared LT panel drawing auxiliaries like cooling water, oil pumping unit, ventilation system, vibrating monitoring systems.
-Knowledge for project management & co-ordinate with sales team.
-Designing of Earthing system, sizing of earthing conductors, calculations for earth pits etc.,
-Preparation of conduit layout, control diagrams, schematic diagrams, DB schedule etc.
-Design of LT & HT cable layout, power distribution system, electrical rooms & DG rooms, Transformer& DG installation, Lighting arrestor & earthing Network etc.
-Preparation of quotations and BOQ required as per system.
-Preparation of electrical approval as per standards.
-Routine Site inspections,
-Lighting Design using Photo lux and CG lux,
-Cable sizing calculations.
-Lighting calculations.
-Prepared SLD, Earthing layout, outdoor and plan layout for Substations, Lighting & lightning layout.
-Checking of LT as well as HT Panels drawings, schemes and BOMs.
-Coordinating with site installations execution, testing, commissioning and overall electrical project management activities and projects.
Also doing Many Pre-tendering engineering activities like,
-
-Prepare single line diagram
-Prepare cable trench layout for power house and control room & switchyard. All related Calculation required for the system as current rating Cal, sizing for the cables, transformer sizing, generator current rating calculations and also earthing calculations if required. For hydro power projects 0.410 MW to 8 MW.
-We have also prepared equipment layout, foundation details of equipment.
-We have prepared basic required BOM for required switchgear panels.
I have prepared following pumping projects activities like calculations and layouts,
-
-CDR(Conceptual Design Report)
-Switchyard SLD
-Switchgear gear & LT SLD
-Electrical load list.
-Switchyard general layout
-Switchyard foundation layout
-Switchyard cable trench layout
-Control room layout with equipment and cable trench layout
-Lighting layout with calculation
-Cable sizing Cal. of HT and LT
-Cable schedule
ORGANISATION: PARTH ELECTRICALS ENGINEERING PVT. LIMITED
OFFICE: SUBHANPURA, VADODARA
DESIGNATION: Testing Engineer
Duration: 1st March 2011 to 15th July 2012
Department: Testing & Designing Department
Company Profile: Parth Electricals and Engineering Pvt. Ltd.is the authorized franchisee of SIEMENS – PTD division. Company gives services for SIEMENS right from the supply of spares, erection, testing & commissioning, revalidation, customer training for the HT & LT panels, switchgears & protective relays and Transformers. The major clients are RIL, BIRLA COPPER, IFFCO, ONGC, IOCL, GSFC, JINDAL GROUP, CGPL etc.
TESTING ENGINEER (B.E. ELECTRICAL)
PROFILE:
-Testing Engineer-Electrical Switchgears (HT & LT Panels)
-Testing of all type of 6.6 kV, 0.415 kV Breakers testing.
-HT & LT cable testing.
-Major Sites Attended:
-DMRC park street 25 kv substation, Delhi
-AIMS substation 33 kv, Delhi
-Shutdown at GSFC P & A s/s 6.6 kv, Vadodara
-Shutdown at ESSAR OIL, Jamnagar, s/s of 6.6KV and 33kv panel and CT PT TESTING.
-RELIANCE, Jamnagar 6.6 kV and 33kv breaker
-IOCL, Vadodara 6.6 kV panel and vcb Breaker testing.
ORGANISATION: DIAMOND POWER INFRASTRUCTURE LIMITED
PLANT: Village, Vadadala, Ta.Savli
DESIGNATION: Assistant Engineer
Duration: 30th August 2008 to 31st December 2010
Department: Production
Company Profile: The Company is manufacturer of LT & HT Cables, Conductors, and HT Towers
ASSISTANT ENGINEER
PROFILE:
Working on manpower management, material management and spare management.
Hand one experience all types production related activities
All types of LT Cable manufacturing knowledge
Knowledge about cable testing like a Type Test & Routine Test
Also knowledge about dispatch side
Knowledge of all type of maintenance of on mechanical and electrical on motor, crane and also other machineries.
Knowledge also about ISO documentation.
Working on machines for day to day preventive maintenance and maintenance to reduce the down time of any machine.
Also knowledge material co ordination
Knowledge of cable faults, cable tests.
Knowledge of Quality control also.
Industrial Training:
Company: INDIAN OIL CORPORATION LIMITED Gujarat refinery, Vadodara division (Duration 21 days) in the vocational training duration I visited
Thermal power plant and gas turbine power plant both have capacity 30 MW
11 KV switch yard
Switchgear protection to each plant using different type of breakers and relays
Battery charging and UPS system
Protection of electrical equipment.
I visited also HS & E department and fire and safety department.
Extra Software Training:
Panel designing: I have been completed 15 days training module on panel designing at techno systems.
Workshop: Undergone workshop 1 week training of PLC & SCADA IN PLC basically, Siemens Certified PLC programmer from PROLOFIC SYSTEMS & TECHNOLOGIES PVT LTD.
EDUCATION
B.E Electrical - Gujarat University (With Final year AGG of 69.8% and 64.66% overall)
Computer Knowledge: MS Office, Excel, Word, VISIO, Power point with advanced software.
Skill:
Knowledge of AutoCAD 2010 with advance 2D & 3D commands. (Working sinc2011).
Knowledge of Basic Computer operations.
Knowledge of programming languages of C & C++.
Knowledge of MI-POWER, MATLAB.
Key Strength Areas
Project engineering and designing
Electricals and control scheme with scada
Extraction, Identifying and managing the scope of work
Highlights of Major Responsibilities
Electrical system design engineer,
Handling the responsibly for the project from designing to implementing with new eras.
Documentation such as Pre-Tender related engineering calculations, Preparation of drawings as per system requirement.
Working as a Technical team member for pre bid meetings also the company representation at oil and gas industry.
Accomplishments as;
System design engineer/Testing Engineer/ assistant engineer
System Design Engineer-
1) Project: - Burugadda (2 X 600 KW)
• Following electrical drawings and calculations prepared & we have received approval from there.
Calculations:-
• Design Calculations for sizing of cable for Switchyard & Power House
• Fault Level Calculations
• CT, PT, CB calculations
• Earthing Design calculations for Switchyard & Power House
Drawings:-
• Single Line Diagram Drawing
• Plan, Section Layout of Switchyard
• Earthing Layout for switchyard
2) NTPC (2 X 4 MW) Project:-
• Checked electrical SLD.
• Cross checked electrical Design calculations. I.e. NGT & NGR Calculations, CT, PT calculations, fault level Calculations.
• Lighting calculation for indoor and outdoor area.
3) Mallayappaih (Andhra Pradesh 2 x 500 kW) project:-
• Prepared & Checked Electrical SLD which is approved by is customer.
• Cross- checked of Drawing & calculations i.e. NGT & NGR Calculations, cable sizing calculations,
Current rating calculations.
-4) Kalvapally (AP, 2 x 410 kW) project:-
• Prepared & Checked Electrical SLD which is approved by is customer.
• Cross- checked of Drawing & calculations i.e. NGT & NGR Calculations, cable sizing calculations,
-5) Karai-7 project:-Indonesia
• Cross- checked of Design calculations i.e. Lighting, cable sizing calculations.
-6) Situmuya (Indonesia, 2 x 1574 kW)
• Prepared & Checked Electrical SLD which is approved by is customer.
• Cross- checked of Drawing & calculations cable sizing calculations,
Current rating calculations.
-7) Tsutsung (2 x 500 kW)
• Prepared SLD and LT panel drawings.
• Checking of LT Auxiliary panel.
-8) Waghur (1 x 1750 kW):-
• Prepare cable schedule
-9) Mukane (1 x 1450 kW):-
• Prepare cable trench layout
• Prepare switchyard, lighting calculation and lightning layout
-10) Aniyur (3 x 8000 kW):-
• Prepare current rating Cal, power transformer, cables and aux trafo sizing cal.
• Prepare single line diagram for project.
Also doing many Pre-tendering engineering activities like
-prepare single line diagram
-prepare cable trench layout for power house and control room
-All related calculation required for the system as current rating Cal, sizing for the cables, transformer sizing, generator current rating calculations and also earthing calculations if required. for hydro power projects 0.410 MW to 8 MW
Following PUMPING ELECTRICAL projects done during my JOB.
-1) INDIABULLS: Prepare control room layout & cable schedule.
-2) PATAN-KALYANA: Prepare cable trench layout, lightning layout, earthing layout, cable schedule.
-3) Chambal Bhilwara: Calculate sizing of three pumping stations transformers size like bhaisorgarh (9 x 625 KW), bhunjar kulla (9 x 925 KW) & tilsva (9 x 425 KW).
-Also prepared Control room layout.
-4) Koppal: Whole system engineering related activities done.
-Also completed so many tenders & project for Hydro and Pumping station in during my job tenure.
-Contributed technical leadership in Reviewing engineering jobs, Project Scope extraction, Structuring plot plan, Installation and commissioning of HT/LT- PCC and MCC panel, Control room lay out drawing, Logic diagram preparation, Preparation of equipment specification, Data sheet, Technical bid evaluation and finalizing supply /work order.
-Familiar with various standards / codes used for Panel designing, Earthling, Cabling.
Effective Team leader, trainer and motivator with ability to integrate team efforts to maximize operational efficiency.
Testing engineer-
●Actively contributed in Testing,
Testing for HT & LT switchgear, Transformers and cables,
Testing at IOCL,Reliance,GSFC,Ultratech,Essar Oil and many more companies,
Relay testing with omicron testing kit.
Project for installation and commissioning of LT and HT panel drives of Siemens, abb and areva.
Assistant engineer-
Managed the Production related activities for company as a assistant engineer cum production engineer
Production for LT XLPE, PVC, Aerial Bunched and Power & Control Cables.
Actively Part in ISO documentation, testing for cables and dispatch activities.
Also Knowledge regarding Maintenance based on production related machinaries, motors and switchgears and crane.
Career Achievements
Started working as GET (Jr Level), promoted as Asistant engineer in the DPIL.
Chosen to work as a Testing engineer at Parth electrical for Electrical testing work of Electrical switchgears and transformers.
Currently working as a design engineer at Jyoti Limited in electrical system designing for Hydro power, Pumping Power and irrigation projects.
Area of Interest
•ELECTRICAL POWER SYSTEM ENGINEERING
•ELECTRICAL SWITCHGEARS & PROTECTION
•DESIGN OF ELECTRICAL ENGINEERING
•DESIGN OF ELECTRICAL DESIGN WITH SOFTWARES.
Personal Profile
Name : Samir B Rana
Father’s name : Mr. Balvantsinh Rana
Date of Birth : 30th Jan 1985
Marital Status : Married
Nationality : Indian
Hobbies : Listening song, net surfing
Passport No : T7515309
Place of issue : VADODARA
Date of issue : 12/07/2019
Date of expiry : 11/07/2029
Declaration
I hereby declare that all the details given above are correct to the best of my knowledge. In case of any error or omission found at a later date, I shall be liable for consequences arising out of it.
SAMIR RANA
Date: -
Place: - Vadodara