Post Job Free

Resume

Sign in

Electrical Engineer Computer Operator

Location:
Delhi, India
Posted:
November 11, 2020

Contact this candidate

Resume:

ELECTRICAL MAINTENANCE

ENGINEER AT MEP/DATA

CENTER WITH 3+ YEAR

EXPERIENCE.

Jitendra Maury

adhqvu@r.postjobfree.com

897-***-****

SUMMARY

BE/B.TECH in Electrical and Electronic Engineering with 3+ year of experience in "MEP & Data Center Maintenance Engineer"

1. Installation and commissioning of electrical Machines and it's wiring, 2. Knowledge about MEP Project and Operations management, Daily operation Report creation 3. Knowledge about BMS Systems for monitoring equipment Reliability and status. VESDA, FAS Systems, PA System, Security Access & Control Systems, BMS Integration, Sprinklers, NOVAC 1230, FM 200, Fire Hydrant System and Audit management.

4. Knowledge about energy management system and performance related to maintenance work of entire Utility Systems,

5. Calculation of Total harmonic distortion in Electrical Substation(Panels/Feeder Piller) 6. Preparation of BOQ for MEP Project materials,

7. Creation of PR/PO Using SAP

8. Planned and effected predictive & preventive maintenance schedules for various equipment to increase machine up time.

9. Calculation of DCiM/PUE and iKw value for data center energy management system 10. CRV/PAC/UPS Status (METASYS SOFTWARE INTEGRATION BY JONSON AND CONTROL), Wireless & Wired Temp/RH TEMP/RH Sensors integrated with iBMS for continuous monitoring, DDC Panel Configuration for Monitoring of DC Utilities and ACS,NVR CCTV Also for DC Electronic security

CAREER OBJECTIVE

I am seeking an opportunity in a company where I can use my experience and education to help the company meet and surpass its goals.

SKILLS

Electrical Auto-CAD CAD-CENTER, MUMBAI (27th Jun 2014 to 31th July 2014) Learnt about electrical circuit design of building and home PLC-SCADA CETPA INFOTECH, ROORKEE (18th Jun 2015 to 15th July 2015) Training in PLC-SCADA

Learnt about Industrial Automation & Machine Control System Computer Skills Microsoft Word, PowerPoint, Excel, and Outlook, EXPERIENCE

From: Oct-2018 to Jan 2020

Technical Admin executive

Prime focus technologies, Andheri East (Mumbai)

Responsibility: Repairing plans related to Tire-III DC Infra & Projects. Lead initiatives aimed at improving cost, quality, schedule, and consistency. Provide 24/7 direct hands on support for operation team actively solving major breakdown in case if any. Maintaining 100% Up-time of entire IDC. Executing Planned, Unplanned, Emergency & Periodic (Quarterly, Half yearly and Annually) Shutdown Activities for each equipment's. Skills comprising of separate dedicated Express Incomer Feeders from Kalawa. Operation and Maintenance of Utility Systems (Like 11KV/440V 1.5*1 MVA Transformer, 2*0.75 MVA HT Cummins DG's having continuous service of the power rating of 3 phase 440KV, Etc. LT & HT Panels and 6 No’s Energy Meters. (ACB, Moto MCCB, MCB) Breakers. Data Centre have 200*4 KVA UPS (Delta) with one Battery bank (40 No’s 200AH Amar Raja) for each UPS, 4PDU Cross Integration dual source for DC Rack, 10*10TR CRV/PAC (Vertiv Energy) Unit and 6*3.5TR UCS for panels and battery room, 100A Static Switch for DC Critical Area VTR, Render and Tap Library, total cooling capacity is 122 TR (DC rooms + Panel rooms). The entire Data Centre sprawls over 1680 Sq. First of floor space. It houses total of 70 racks distributed in four rows with two rows of 17 racks and two rows of 18 racks. Total IT equipment load in DC totals to gross weight of 22 tons. PLC & SCADA Configuration . BMS Systems for monitoring equipment Reliability and status. VESDA, FAS Systems, PA System, Security Access & Control Systems, BMS Integration, Sprinklers, NOVAC 1230, FM 200, Fire Hydrant System. Knowledge about energy management system and performance related to maintenance work of entire Utility Systems. Planned and effected predictive & preventive maintenance schedules for various equipment to increase machine up time. CRV/PAC/UPS Status (METASYS SOFTWARE INTEGRATION BY JONSON AND CONTROL), Wireless & Wired Temp/RH TEMP/RH Sensors integrated with IBMS for continuous monitoring, DDC Panel Configuration for Monitoring of DC Utilities and ACS,NVR CCTV Also for DC Electronic security.

From Aug-2017 to Oct 2018

Site In-charge/Technical Supervisor

Oberoi International school, Goregaon East (Mumbai) Responsibility : Operation and Maintenance of Utility Systems (Like Electrical substations comprising 11/240KV 3 MVA Dry Type Transformers its associated switch-gear and Differential Protection Relays, Under and Over Voltage Relays, Short Circuit Relays for Individual floor Distributions especially used for back feeding Supply. DG sets of 2*1.5 MVA Powrica Cummins/ Caterpillar, having continuous service of the power rating of 3 phase 440V, 10*5 KVA UPS with AMARRAJA Batteries with every 2 Banks for each UPS's. 2*350TR TRAIN CHILLER SYSTEM For Cooling Purposes (Both Air Cooled & Water Cooled Systems), Primary Pump, Secondary Pump & Condenser Water Pump Configuration, VFD with DDC Panel Configuration for Monitoring Chiller Parameters, Respective Sensors and FLA Status

(Siemens Software), Wireless & Wired Temp/RH TEMP/RH Sensors Installed in SH integrated with IBMS for continuous monitoring, AHU (Raw Power), CSU (Raw Power), FCU (Raw Power), etc. all such COOLING UNIT installed at each dedicated floors. LT & HT Panels and Energy Meters. (VCB, ACB, SF6, MCCB, MCB, ELCB) Breakers, (ATS, USB, UDU & PDU) Panels configuration & distribution, FAS Systems, PA system, Security Access & Control Systems, BMS Integration, Sprinklers, Fire Hydrant System.

From: Jul-2016 to Jul-2017

Electrical engineer

Pravin Electricals Private limited, Ghansoli (Maharashtra) Responsibility: 1. Installations of different type of panel i.e. LTDB, Feeder pillar, supply pillar. 2. Involve in site erection work. Such as how & where to install the material such as Transformer, Cable and Steel structure etc.

3. Installation Electrical System (LT panel,APFC Panels, ATS ) and building Wiring DB installation according to load calculation

4. Making Of BOQ and erection/installation of Electrical System New Project for building Infrastructure.

5. Electrical wiring through the basis of Auto CAD drawing. 6. Knowledge about Salection of cable, Panels and breaker as per load. 7. Building infrastructure load calculation according to equipment voltage drop. Project

Project Name: UG PROJECT: - Smart Home Automation

Role: Team leader/Software programmer

Team Size: 4

Project Duration: 3 Month

Smart Home Automation Using Arduino- 328 and Arduino-16 interfaced infrared touch switches, smart window, smart curtain and smart door locking system, Robotic Arm Project Name: Major Industrial Training (BHEL HARIDWAR 11th Jun 2015 to 26th July 2015) Role: Trainee/internship

Team Size: 4

Project Duration: 45 Day

Training in CIM Shop, Learnt about Manufacturing Process of 500/600MW Winding bar of Turbo generator.

EDUCATION

Degree/Course Percentage/CGPA Year of Passing

B.Tech 69.88 % 2016

Hindustan college of Science and Technology,

Mathura (U.P.), Dr. A.P.J. Kalam University

Lucknow(UP)

12th 67.20 % 2011

S.R.U.P Inter collage, Gazipur (UP), Board of High School and Intermediate Education Uttar Pradesh

10th 67.17 % 2009

KRISHAK I.C Azamgarh

(U.P.), Board of High School and Intermediate

Education Uttar Pradesh

STRENGTHS

Teamwork, Quick learning ability, Challenge Acceptor AREAS OF INTERESTS

Electrical engineering World, Daily news Analysis

HOBBIES

Playing chess and Sudoku

PERSONAL DETAILS

Current Address Kaushik Hostel, Block M, Mamura,

Sector 66, Noida UP 201301

Permanent Address Village - Bhiti, PO - Bibipur, PS - Taravan Azamgarh, Uttar Pradesh, 276123

Passport detail SI338194

Date of Birth 11-02-1993

Gender Male

Nationality Indian

Marital Status Single

Languages Known English, Hindi

DECLARATION

Jitendra Maury I hereby declare that the above written particulars are true to the best of my knowledge and belief.

Jitendra Maury



Contact this candidate