Karthick Selvaraj * P a g e

+974-****-****

UPDA Certified Electrical Engineer with over 9+ years of hands-on experience in Installation, Integration, Project Execution and Testing and Commissioning of Electrical and ELV Systems. CORE COMPETENCIES

Project Execution.

Site Supervision.

Electrical Design.

Installation of LV & ELV systems.

BOQ and MST Preparation.

Testing and Commissioning.

Shop Drawing and As-built Preparation.

QA/QC Inspection.

Maintenance of Electrical Equipment.

EDUCATIONAL QUALIFICATIONS

Master of Engineering in Power Electronics and Drives

Bachelor of Engineering in Electrical and Electronics CAREER HIGHLIGHTS

Engineer in charge for Testing and commissioning of ELV systems in Lusail LRT project

Engineer in charge for deployment of Fire Alarm system within the QP District Project

Engineer in charge for deployment of multiple ELV systems within the QP District Project

Engineer in charge for the coordination and preparation for QCDD inspections

Engineer in charge for deployment of multiple ELV Systems in the QF-HQ Project PROFESSIONAL EXPERIENCE

Testing & Commissioning Engineer (ELV Systems) June 2018 until Present QDVC (P.Q.S.C) Lusail Light Rail Transit (LRT)

The Lusail Light Rail Transit (LRT) is a future tramway network in Qatar that will serve the 19 districts of the new city of Lusail and will connect Lusail to new Doha international airport via the Doha Metro.

The Lusail LRT project consists of:

- 4 tramway lines, 37 stations, 1 operator control center, 1 Backup operator control center & 28 Tramways.

Systems Deployed:

Fire Alarm Detection System (FDS).

CCTV Systems.

Access Control System ACS)

Passenger Information and Passenger Addressing System (PIS/PAS)

IT Structured Cabling System

Telephone, Tetra and WIFI

Tunnel Ventilation System (TVS)

KARTHICK SELVARAJ

+974-****-****

adhqnq@r.postjobfree.com

Doha, Qatar

Karthick Selvaraj 2 P a g e

+974-****-****

Key Responsibilities:

Planning, controlling and monitoring actual execution of Electrical works including Installation, testing and commissioning of ELV Systems in whole LRT site.

Manage the ELV subcontractors for design, procurement, installation and testing and commissioning of the respective system according to the contract.

Monitoring the installation progress and Quality of work of the ELV subcontractor and reporting it to management.

Daily monitoring of site activities and assigning work schedule for respective subcontractors

Responsible for submitting documents for request for inspections and testing

Report directly to the T&C Manager for updating of progress for site works.

Responsible for the preparation of two weeks look ahead schedule for the upcoming weeks and coordinating with consultant and subcontractors for the testing and commissioning of ELV systems in time.

Responsible for coordinating with the design team for preparation of As-Built drawings and Cause and Effect Matrix.

Monitors and reports on the progress of all project activity including significant milestone and any conditions which would affect project cost or schedule.

Integration of the construction and the commissioning phase.

Co-ordinate and attend the Government body Inspections like Qatar Civil Defense (fire and Safety Inspection) and implement the recommendations

Inspect and check to make sure the fire protection system working and maintained properly as per NFPA and QCD Standards.

Handled multiple subcontractor’s teams at the same time to provide material submittal, method statements, drawings and designs in accordance with requirements of design practice manual and as per the project requirement. ELECTRICAL ENGINEER November 2015 until June 2018

BOYGUES-MIDMAC-ALJABER JV Qatar (QP District Project) QP District Project includes construction of office space across nine high-rise towers ranging from 18 to 48 levels, and a Five star Hotel, with dedicated underground parking for 5,500 cars, spanning a built up area of 700000 sq m, and an associated cost of over Six Billion Qatari Riyals Systems Deployed:

Fire Alarm

IT Structured Cabling

Access Control System

CCTV

Building Management System

Background Music

Parking Guidance systems

Key Responsibilities:

Planning, controlling and monitoring actual execution of Electrical works including Installation, testing and commissioning of ELV (Extra Low voltage) Systems

Submitting Material Submittals and Method statements to the consultant for its approval and ensuring work as per QCS, Kahramaa regulations

Preparing/Reviewing shop drawings and ensuring their adequacy with respect to the design drawings and IFC and its completeness to meet the local codes and regulations

Daily monitoring of site activities and assigning work schedule for respective subcontractors after completing the required containment and electrical installation works

Lead the Electrical team and effectively utilized the manpower provided

Coordinate with other fields for proper implementation & completion of work on time Karthick Selvaraj 3 P a g e

+974-****-****

Responsible for submitting documents for request for inspections and testing

Report directly to the testing and commissioning manager for updating of progress for electrical works

Responsible for the preparation of two weeks look ahead schedule for the upcoming weeks and coordinating with consultant and subcontractors for the testing and commissioning of Electrical systems in time

Responsible for coordinating with the design team for preparation of As-Built drawings after completion of all installation works

Supporting and promoting all QHSE policies and procedures implemented by the company

Co-ordinate and attend the Government body Inspections like Qatar Civil Defense (fire and Safety Inspection) and implement the recommendations

Inspect and check to make sure the fire protection system working and maintained properly as per NFPA and QCD Standards

ELECTRICAL ENGINEER October 2014 to November 2015

Midmac Contracting Qatar (QF HQ Project)

Qatar Foundation Head Quarters project includes three major volumes, Chairperson’s Wing, Executive Tower (12 Levels) and Staff Tower with 500 underground staff car parking Systems Deployed:

Fire Alarm

Public Address/Voice Evacuation Systems

IT Structured Cabling

Access Control System

CCTV

Building Automation Systems (BAS)

Key Responsibilities:

Responsible for Electrical work Installation, Commissioning and testing for ELV (Extra Low voltage) Systems

Preparing all relevant ELV systems technical submittals and get approval from the consultant

Follow up all submittals and shape drawing accordingly

Monitor day to day activities very closely and plan for the activities to be performed

To follow up MEP subcontractors on site and do proper coordination/ documentation with them

Lead Testing and Commissioning Activities for ELV Systems

Providing technical solutions and Instructions for the foreman & Electricians

Ensuring that all site work are executed in accordance with the approved construction drawings, contracts, documents, project specifications and all applicable standards

Responsible for preparation of Shop drawings as per client’s new additional requirements and As-Built drawings after completion of all installation works

Responsible for Fire alarm integration with other system and for the Qatar Civil Defense Department (QCDD) inspections for the building occupancy scenario

Responsible for the snagging and de-snagging activities and Coordinating to consultant for the closure of snags

Supports the T&C Manager in accomplishing all the goals and targets for the electrical groups at site

Finish the targets as per committed project schedule.

Ensuring that the As Built Drawings, O&M Manuals and related documentation is prepared, reviewed, submitted and approved in a timely manner, in line with the contract. Karthick Selvaraj 4 P a g e

+974-****-****

DESIGN ENGINEER April 2014 to September 2014

Power Links Qatar (Qatar Power Transmission system expansion Projects) EHV Transmission System under Qatar Power Transmission system expansion Projects (Phase X) Work Details:

GTC/372 B/2010 (Phase X): 66Kv, 2000 sq.mm, 120MVA cable route design

GTC/372 B-ADDITIONAL WORKS /2010 (Phase X): 66Kv, 2000 sq.mm, 120MVA cable route design

GTC/372 F /2010 (Phase X): 132Kv, 2000 sq.mm, 250MVA cable route design Key Responsibilities:

EHV Cable route designing works using AutoCAD

Proposal of underground cable route drawing with municipality co-ordinates along with Road Reservation as per Qatar General Electricity and Water Corporation

Preparation of Key plan, Trail Pit Location drawings, Detailed Route drawings inside and outside substation, Joint bay location and Road Crossing drawings and Profile drawings for the proposed cable route

Preparation of Bonding Scheme, Phase Sequence drawings and Cable pulling calculation for the proposed cable route

Preparation of ASBUILT drawings and Route marker location drawings after completion of work with given survey co-ordinates by the client

ELECTRICAL SITE ENGINEER May 2011 to March 2014

Ocean Interiors, India (Ramaniyam Marvel project)

Ramaniyam Marvel project includes construction of a four storey residential apartment building with 142 Flats in Chennai, India

Key Responsibilities:

Supervising and monitoring of all the containment installations, wirings, DB dressings, earthing, cable laying & terminations

Responsible for implementations and monitoring of all electrical related works at site like

(LV, Power distribution, lighting, Grounding, Security, Voice and Data systems)

Monitoring the work such as laying of LV Cables & Wires, conduit work, cable tray and switch boxes are done as per the drawings

Conduct material take off for construction and for bidding, prepared Bill of Quantities (BOQ)

Plan and coordinate execution of all operational works for sites assigned from starting stage to project handover including mobilization, procurement, installation, commissioning, monitoring and demobilization

Directly responsible for the safety of all electrical groups’ personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards

Performs other related duties as may be required by the Project Manager

Achieved timely completion of Electrical works and handed over the project on time