OBJECTIVE: Position as a Sr. BPCS Engineer

EXPERIENCE DCS/SIS Engineer (proficient in the configuration of hardwired/serial 3rd Party Points) with good background in instrumentation and P&ID development. Valuable knowledge of Honeywell Experion, ABB (800xA), and Yokogawa (Centum VP) DCS platforms both on the software and hardware side. Conducted a number of DCS Factory Acceptance /Site Acceptance Tests and followed it up to Plant Startup/Commissioning. Well familiar with Honeywell Safety Manager, Allen Bradley PLCs, and HIMA HIMax PES. Worked in various industry sectors including Oil & Gas, Power/Energy, and Nuclear, Security and Environmental.

EDUCATION: University of Houston, Houston, Texas

Master of Science Degree, Electrical Engineering, 1991

Thesis: "Optimal Trajectory Planning of Flexible-Joint Robot Arms with Small Rotational Angles"

GPA: 3.66 (4.0 Scale)

University of Houston, Houston, Texas

Bachelor of Science (Cum laude),

Electrical Engineering, 1988

GPA: 3.36 (4.0 Scale)

WORK EXPERIENCE:

BECHTEL CORPORATION (JUNE 2020 – PRESENT)

Sr. Automation Engineer

. Sr. Automation Engineer. Resolve any Hardware/Software Automation issues arising during current operation of Pueblo Chemical Agent Destruction Pilot Plant (PCAPP). Project utilizes Allen Bradley and Honeywell DCS Controllers/Software.

BECHTEL CORPORATION (NOVEMBER 2018 – JUNE 2020)

Sr. Control Systems Engineer

. Lead ICSS Engineer (DCS/SIS/FGS). Responsibilities included development of DCS, SIS, and FGS IFQ Material Requisitions, development of DCS/SIS/FGS Specifications, Complex Loops, ICSS Equipment Layout Drawings for involved Substations/Buildings, and Network Architecture Drawings. Since this is a Job utilizing solely Universal hard I/O and Remote I/O (RIO) Enclosures, responsibilities also included determining the number of RIO enclosures needed for the new Train 2 Project.

BECHTEL CORPORATION (MAY 2018 – OCTOBER 2018)

Sr. Control Systems Engineer

. Lead DCS Engineer on Corpus Christy LNG Stage 2 Project. Responsibilities included I/O assignment, Yokogawa Centum VP configuration/ programming, Complex Loop development/modifications, DCS graphics development, and internal testing of DCS Code in preparation for the Software Factory Acceptance Test.

BECHTEL CORPORATION (DECEMBER 2017 – APRIL 2018)

Sr. Control Systems Engineer

. DCS/SIS Engineer on Pennsylvania Chemical Project. Responsibilities included verifying graphic displays on a Delta V system to make sure they adhere to the graphic standards set forth by Shell (the Client). The latter involved maintaining a log of any graphic discrepancies not adhering to standards and making sure they are resolved by the Vendor.

BECHTEL CORPORATION (MARCH 2016 – NOVEMBER 2017)

Sr. Control Systems Engineer

. Lead DCS Engineer on Sabine Pass LNG Stage 3 Project for Cheniere in Port Arthur, TX. Responsibilities included I/O assignment, Yokogawa Centum VP configuration/programming, Complex Loop development/modifications, DCS Hardware Vendor Print Review, and conducting DCS Software/Hardware Factory Acceptance Test.

BECHTEL CORPORATION (JULY 2014 – MARCH 2016)

Sr. Control Systems Engineer

. Site Resident DCS Engineer on Australia Pacific LNG Project for Conoco Phillips in Curtis Island, Queensland (Australia). Represented Bechtel APLNG ICSS Engineering. Responsibilities included Honeywell Experion DCS configuration/programming as part of the Plant Commissioning & Startup Effort, approval of any SIS/DCS Software Change Requests or Project Technical Requests issued by CSU/Client, Development and Issue of As-Built ICSS Project Deliverables, and troubleshooting/resolution of any DCS issues in the Control Room as part of Plant Startup and Commissioning.

BECHTEL CORPORATION (DECEMBER 2013 – JUNE 2014)

Sr. Control Systems Engineer

. DCS/SIS Commissioning & Startup Engineer on Angola LNG Project for Chevron in Soyo, Angola. Engineer responsible for Loop & Interlock Checks, Complex Loops configuration, and monitoring/troubleshooting of Plant Process via the Honeywell Experion DCS/ Triplex SIS systems.

BECHTEL CORPORATION (JUNE 2012 – DECEMBER 2013)

Sr. Control Systems Engineer

. Sr. DCS Engineer on Australia Pacific Project for Conoco Phillips in Curtis Island, Queensland (Australia). Engineer responsible for I/O assignment, Control Module Templates development and configuration/programming of the Honeywell Experion DCS system for LNG plant in Australia. Conducted DCS Software Factory Acceptance test at Honeywell facility in Houston.

APPLIED ENGINEERING SOLUTIONS, aeSolutions (MARCH 2011 – JUNE 2012)

Principal Specialist

. Develop Safe Operating Limits Tables (SOLTS) for a number of equipment on a Well Pad Site on the Alaska North Slope as part of a BP Exploration Project (BPXA).

. Work on the development of HMI Graphics and Software Configuration Standards for an Instrumented Protective System (IPS) using Honeywell Safety.Manager and Experion PKS/Aspen IP.21 HMI. The Standards effort is part of the BPXA AF &G Renewal Program Project on the AK North Slope.

. Work on the development of HMI Graphics and Software Configuration Standards for an Instrumented Protective System (IPS/SIS) using Honeywell Safety.Manager and Experion PKS/Aspen IP.21 HMI. The Standards effort is part of the BPXA AF&G Renewal Program Project at the AK North Slope.

MUSTANG ENGINEERING (FEBRUARY 2008 – MARCH 2011)

Automation Engineer - Mustang Automation and Control (MAC) Group, Conoco Phillips CSU2 Project

. DCS engineer responsible for the I/O assignment, point configuration, and complex loop configuration/programming of a number of complexes for the COP Alliance Refinery, in Belle Chase LA. Proficient in the use of the Honeywell Experion DCS including use of Control Builder and Quick Builder (SCADA points) point configuration tools, and Sequential Control Modules (SCM) configuration.

. Responsibilities included leading a few FAT’s and SAT’s, long term field support (Hot Cutovers)/DCS commissioning, as well as development and update of Graphics using Honeywell’s HMIWeb Display Builder.

BECHTEL CORPORATION (FEBRUARY 1992 – JULY 2005, OCTOBER 2005 – FEBRUARY 2008)

Control Systems Engineer (EIT - April 1994)

December 2006 – February 2008 (Control and Automation Team – CAT Group)

. DCS engineer responsible for the development of complex loop narratives, logic narratives, cause and effect matrices, and Honeywell Experion DCS architectural drawings for the Motiva Crude Expansion Project, Port Arthur TX. Other responsibilities include Fieldbus segment criticality assessment, DCS I/O type counts, and I/O database development.

September 2006 – November 2006 (Project: TPX Revamp Project, Sriracha, Thailand)

. On site Engineer responsible for the development of the complex loop narratives for a number of the refinery units. Generation of the MR/data sheets and instrument bid tabs evaluation were other responsibilities.

October 2005 – August 2006 (Project: Trinidad LNG Multi-Train De-Bottlenecking Project, Trinidad)

. PET Engineer responsible for generating MR/data sheets for various instrument commodities (such as Fire & Gas System), the development of Level Setting Diagrams, and Instrument Index development using INTOOLS. Other responsibilities included Instrument Vendor Bid Reviews, generation of Alarm Summary

Lists, and keeping track of MPAG’s progress on the instrument commodities the group is requisitioning. Assisted EGS in a number of technical/administrative issues.

. Assisted lead DCS engineer on the development of the material requisition for the Honeywell TPS DCS equipment, Hard I/O assignment, I/O points configuration, complex loops review, modifications and testing, graphics development, and hardware setup and testing. Played a major role in the successful completion of the DCS FAT and meeting the required deadline.

January 2003 – July 2005 (Project: River Protection Project - Waste Treatment Plant, Richland, WA)

. Engineer responsible for the design, implementation and testing (Verification and Validation) of software objects/typicals used in the various units of the River Protection Project Waste Treatment Plant. Implementation of the design performed using ABB 800xA Control Builder M DCS programming package.

April 2002 - December 2002 (Project: Spalding Energy Power, Spalding, England)

. Engineer responsible for the HRSG, Main Steam, and Boiler Feedwater Systems. Responsibilities include development of both Logic/SAMA Drawings and P&IDs. Also responsible for developing the Specification and Instrument Data Sheets for the Steam and Water Sample System.

November 2001 - March 2002 (Project: Athens Generating Project, Athens NY)

. DCS Engineer; participated in DCS FAT at the Siemens-Westinghouse Facility in Georgia. Familiar with Siemens system and with the development of DCS graphics.

July 2000 - October 2001 (Project: Turkey Boo Power Projects, Bechtel-Enka Joint Venture)

. Responsible for the development of the logic diagrams for each of the Condensate and “Heller” Cooling Tower/Circulating Water systems for two of the power plants in Turkey. Worked on the development of DCS block diagrams, Graphics, DCS I/O List, and I/O points Assignment. Participated in Software Factory Acceptance Test (FAT) for Gebze, Turkey Power Plant.

SOFTWARE EXPERIENCE: MS Windows, MS Office, INTOOLS, Fortran 77, Assembly 8086, VBScript, Visio, and MathLab.

EXTRACURRICULAR Languages: English, French, and Arabic

ACTIVITIES: Travels: Middle East, Europe and the United States

Hobbies: Running, Cycling, Swimming, Skiing, Theater and Music



Contact this candidate