Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Vijayawada, Andhra Pradesh, India
Salary:
Rs 50,000/-per month
Posted:
November 09, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONNEL PARTICULARS:

NAME:

SONTI SIVA NAGESWARA RAO

NATIONALITY:

INDIAN

DATE OF BIRTH:

**/**/****

EMAIL ID:

adhomf@r.postjobfree.com

MOBILE:

944*******

APPLICATION FOR THE POST OF: Civil ENGINEER

OBJECTIVE:

To achieve high career growth through a continuous process of learning for achieving goal and keep myself dynamic in the changing scenario to become a successful professional and leading to best opportunity.

EMPLOYMENT SCAN:

PERIOD

DESIGNATION

PLACE OF WORK

DEC 2017 TO FEB 2020

SITEIN-CHARGE

NAVULURU AND NIDAMARRU, AMARAVATI

OCT 2006 TO JUNE 2017

CIVIL SUPERVISOR

TO

MANAGER (CIVIL)

THE JEYPORE SUGARS COMPANY LIMITED, CHAGALLU;

VRK SUGARS, POTHAVARAM;

SRI RAMA DISTILLERY, JANGAREDDIGUDEM

&

JEYPORE SUGARS COMPANY LIMTED DISTILLERY, CHAGALLU

MAY 2003 TO OCT 2006

SITE ENGINEER

THE GODAVARI ENGINEERING CONSTRUCTION CORP., ELURU

JUNE 1989 TO APRIL 2003

ASSISTANT ENGINEER (CIVIL)

THE WEST GODAVARI CO-OP. SUGARS LTD, BHIMADOLE

APRIL 1987 TO JUNE 1989

WORK INSPECTOR

ROADS & BUILDINGS DEPARTMENT, ELURU

DECEMBER 2017 TO FEB 2020:

I worked as SITE IN-CHARGE in KMV PROJECTS of A.P TIDICO HOUSING PROJECTS, AMARAVATHI, ANDHRA PRADESH.

I have been involved in the construction of G+3 Buildings of 21 Blocks and 17 Blocks by using latest Shear Wall Technology and Mivan Centering in A.P State Capital, Amaravati.

Site Supervision, Executing and Checking the Quality of Work such as Walls, Frameworks, Scaf Folding and etc. as per specifications.

Execute the steel as per approved structural design and drawings. Various Finishing Works like Plastering, False Ceiling and Painting etc. as per specifications.

Electrical and Plumbing works, Under Drainage works, Sewage Lines, Water Pipe Lines etc. as per specifications.

Design and Preparation of detailed Project Work, Quantity Surveying and Estimation. Preparation of Work Bills to the Contractor and Submitting for Payment.

Ensuring Quality and Safety at Site Materials Forecasting for Indent Preparation. Attending Progress Meetings regarding the Status of Work.

MAY 2014 TO JUNE 2017:

Lagoons, Bio Compost Flat Forms, Enlarger Column Foundations, R.O Plant foundation, DM Plant Foundations & Were House etc., at S.R.D Jangareddigudem.

B.T Roads, Compound Walls, Power House, etc. at Distillery Division Chagallu.

.

Construction of S.V.R.K Public School Building 2nd floor at Chagallu and office modifications, 60tonnes Weigh Bridge, Toilet blocks, Mechanical foundations etc.

Discharged duties independently, Constructing of Residential Quarters, maintenance of buildings, preparation of bills and attended Project works.

Co-Ordination withHigher Officials and Government Departments.

DECEMBER 2008 TO MAY 2017:

E.T.P Plant, Spray Pond, Sugar Go down, B.T Roads, Main Factory de vacuum R.C.C floorings, Mechanical Foundations, R.C.C Drains, R.C.C Chimney of 60m height, 13.50 MW Power Plant Construction etc. of the Project 5000 TCD of the V.R.K Sugars Pothavaram. Dimensions of the main factory building are 30 28m height& executed Eructation of Lift.

Handled 310 Crores Project Independently and Successfully within the Stipulated Time.

OCTOBER 2006 TO NOVEMBER 2008:

Molasses Tank (7500 MT) at Chagallu, 600 Cubic Mts ROPlant at Chagallu Distillery and 300 Cubic Mts ROPlant at SRD Jangareddigudem and Land Scaping, Green Belt Development, Laying of CC 6 A.C. Concrete Flat Form.

Attended the V.R.K. Pothavaram Project Work of 5000 TCD capacity and Heavy Industrial Structures and Heavy Mechanical Foundation Static and Dynamic Foundations like Turbine, Boilers, Can Carriage, Fibrazer, R.O Plants, Weigh Bridges Bhudder, Can Unloaders, Internal Roads and Residential Buildings and Fabrication of Structures, R.C.C Chimneys, etc.

I have performed the Whole Supervision and Duties Discharged Individually.

I have performed the Preparation of Bills and Bar Bending Schedules, Maintenance of Man Power and Material’s up to date.

MAY 2003 TO OCTOBER 2006:

Construction of Police Quarters at Kurupam, Vizianagaram District.

Construction of Police Quarters at Momdemkallu, Vizianagaram District.

Social Welfare Hostel Building at Kuchimpudi, West Godavari Dt. 1 in 16 crossings and point’s railway work at Nidubrolu, Guntur District, Preparation of Bills, Testing of Building materials, Analysis of Rates and completed the work within the stipulated time.

JUNE 1989 TO APRIL 2003:

Construction of Molasses tank (3500 MT), 20 Tons Weigh Bridges (2No’s), Clarifiers, MillHouse, Boiling House, Cane Carriage, Fibrazer, Kicker, Leveller, Drive, Cutter, Bages Carriage and Turbine Foundations and Cane Unloaded Foundation, Heavy Industrial Structures, Residential Quarters etc.

Handling of Men and Material and Planning of the Works Day to Day and Weekly Basis.

The Whole Supervision and Duties Discharged Individually.

Preparing of Estimates, Billing and Preparing of Bid Documents and Bar Bending Schedules etc.

Attended the Expansion Program of Company from 1250 TCD to 2000 TCD of Higher Capacity.

APRIL 1987 TO JUNE 1989:

Construction of Major Buildings at Telugu Bala Mahila Pranganam at Tadikallapudi, W.G.Dt.

Construction of PHC Buildings and Internal roads at Jangareddigudem, Chintalapudi.

PERSONAL INFORMATION:

ADDRESS

D.NO: 3C-9-9,

18TH DIVISION,

WESTERN STREET,

WEST GODAVARI DISTRICT,

ELURU,

ANDHRA PRADESH – 534001.

LANGUAGES KNOWN

TELUGU, HINDI & ENGLISH



Contact this candidate