Electrical Engineer Power Plant, QAQC

Location:
Calasiao, Pangasinan, Philippines
Posted:
November 09, 2020

Contact this candidate

Resume:

RESUME OF Elyrey B. Dizon Licensed Electrical Engineer

Vying for the position of: Electrical Engineer (Quality Inspection or Field Supervision) ELYREY B. DIZON

Registered Electrical Engineer

PRC REE Certificate No. 19128

(Saudi Aramco Approved QA/QC Electrical Inspector) ARAMCO SAP #70005307

SCE # 426441

#19 Barangay Banaoang Calasiao Pangasinan 2418

Philippines

Mobile Phone: (Philippines) +639*********, +639********* Landline +637********

E-mail address: adhoi4@r.postjobfree.com / adhoi4@r.postjobfree.com Career Profile

More than Twenty (20) years cumulative work experience in the field of Engineering, Construction and project execution. Particularly in Petrochemical plant, Oil & Gas Refineries, Power plant and other similar Heavy Industrial environment. Acquired extensive experience in all phases of construction having occupied key position as Quality Engineer; Site Electrical Engineer, Instrument and / or Electrical; Supervisor. Conversant with industry’s standard codes and specification.

EDUCATIONAL QUALIFICATION

Luzon Colleges (now University of Luzon) Philippines Graduated Bachelor of Science in Electrical Engineering 1980 – 1985 LICENCURE EXAMINATION

Professional Regulation Commission (PRC)

Lic. exam for Registered Electrical Engineer

PROF. AFFILIATION

Active member Philippines Institute of Integrated Electrical Engineer (IIEE) TRAINING ATTENDED

H.U.E.T offshore survival course – SMTC Training Date February 2011 Basic Fire Fighting and survival course- SMTC Training date February 2011-05-25 ISO 9002- January 2001

Confined space entry

H2S Course-Safety Training Course

Project Management and Control Sponsored by Meralco Foundation Institute (MFI) 1990 Working on Confined Space Entry and procedures

Working on Heights and 100% tie off

Lock-out/Tag-out Procedures

COMPUTER LITERACY

Microsoft XP Professional operating system, ms office application (words, excel, power point.) Personal Information :

Date of Birth : November 12 1963

Place of Birth : Dagupan City Philippines

Weight : 70 Kgs.

Height : 5’6"

Membership : Institute of Integrated Electrical Engineers of the Philippines (IIEEP) Civil Status : Married

Work History:

(Company/Client/Project/Location/Position/Scope of Work/Job Description) Electrical Engineer-QAQC YAPI MERKEZI INSAAT

May 2018 to August 10, 2019 Jeddah Station-Haramain HHR Project-Jeddah KSA

The Project entails the Construction, Start-up Testing and Commissioning of New High-Speed Train Passenger Terminal Owned by Saudi Railways Organization (SRO) Located in Jeddah Saudi Arabia consisting of 8 lanes Passenger Platforms, Two ( Sprawling 5 level Carpark Area, 8 lanes Passenger Bridges and 5 level Main Station consisting of Station Offices, Ticketing Area, Concourse, Consumer Retails and Restaurant.

Contractor EPC Representative responsible for overseeing the Electrical Sub-Contractors Electrical Scope of Activities relevant to the implementation of Client Approve Quality Program, QCP and ITP and Method Statements involving Installations and Testing Commissioning of Completed System. (High Current & Low Current System).

Coordinate and assist the Client Representatives/Consultant (DAR AL Hadassah) for the Inspection of Completed System following the Submission of RFI and RFT Request for Inspection/Testing by the Sub-Contractor.

The System consist of High Current Installation (13.8 KV Medium Voltage Incomer cabling system and MV Switchgear, MV RTU, Transformers, & 5 Nos. Stand-by Generator Set, LV Distribution Boards, MCC’S & HVAC’S. MDB, and FDB & SMDB associated lightings and small power). Whilst the Low Current System installation consist of related infrastructure in Security System (SACS) Access Card, Intrusion Detection System

(IDA) Security Cameras (CCTV) Public address system (PAVA). Fire Alarms & Suppression System (FAS) Parking Management System (PMS) ICT and EIMS, Facilities for Disabled. Electrical Engineer-QAQC Arrab Construction Company (ACC) September 2015 to October 2017 Fadhili Project-North Jubail KSA

Construction of SEC (NGsa) 115/66KV Fadhili GIS Substation for Future Power Requirement of Abu-Hadriah Line Distribution System.

SEC/NGsa Client Approved Electrical QAQC Engineer to Represent the EPC Contractor (ACC) for Implementation of QAQC Program relevant for the Installation, Construction and Commissioning of Electrical System Ensuring that all Disciplined Activities are Covered and Project Quality Objectives are Achieved base on Client Engineering and Construction Standards, Approved Project Technical Specification, Quality Plans and Inspection and Test Plans.

Sr. Electrical Inspector WorleyParsons / Shell EP

May 2013 to August 2015 Basra Gas Company (BGC)

Basra Southern Iraq

Rehabilitations and refurbishments of Existing Gas Plant Processing facilities, Compressors & De-Gassing Stations, Storage & Transport Facilities, Shipping and loading facilities located in Kor Al Zubair Plant, North Rumaila Compressor Stations, Umm Qassar Storage and Marine Terminal.

Work as Shell Client Representative with the function of overseeing the contractor scope of Activities in performing pre-inspection and assessment of Plant Integrated Electrical System and associated equipments. This to include but not limited to Visual & Close Visual. Detailed and intrusive inspection to determine the operational integrity of equipments for possible re-commissioning.

Data and information gathering of pertinent records associated with Maintenance history, Precommisioning and commissioning records, period of breakdown during previous operation. Datasheet and technical specifications as- built drawing to be forwarded to the Database of Engineering and Asset management Group for further evaluation and processing.

Review the Contractor Inspection Result for conformity to ensure that all information was obtained prior for submission to Asset Group for further re-engineering, replacement and/ or final resolution. CLIENT PMC Electrical Superintendent BUREAU VERITAS BVQI / GASCO October 2011 to May 23, 2013 Habshan-5 (IGD) Process Plant Project Habshan, Abu Dhabi United Arab Emirates

Attend and represent client for the Pre-energization and MC Walkdown for the completed system packages upon invitation of EPC Contractor for the Following system

MV/LV System associated equipment (Switchgear, MCC’s, Transformers and Motors)

Variable Speed Drives (VSD) and Chiller System

UPS System ( battery charger/rectifier, batteries)

Lightning protection & Earthing system (Underground & Above Ground)

Cathodic Protection ( Galvanic and Impressed current system)

Lighting system

Punchlist Generation and Clearing

Attend and represent client along with TPI Inspector for the pre-commissioning inspection and witnessing of functionality / Site Acceptance Test of equipment and protection setting (re: Upstream and Downstream electrical interlock and mechanical key interlock test between MV/LV Incomer, distribution and MCC’s, Auto-transfer scheme and switchboard working philosophy, MCC motor management relay auto/manual and local/remote scheme, Motor solo run test, VSD Function run test @4-20mA command signal, Chiller system for MV VSD

Interface with EPC Contractor for any design deviation and site actual site condition following issued Field Change notice by contractor

Closure of NCR upon confirmation of corrective action Client PID-NAPIS Electrical Inspector FAHSS TUV NORD/ARAMCO December 2010 to July 2011 OPD-Offshore Berri field Upgrading and Hook-up Tanajib Eastern KSA

Construction and Upgrading of Aramco Brownfield Offshore Production Facilities and wellheads located in BERRI field and Qatif reservoir involving installation and modification of Scraper Launcher, bi-directional Flow line, PDHMS wellhead Hook-Up, Multi Phase Flow Meter (MPFM) Installation RTU Replacement & SCADA Integration.

Assigned as Aramco Inspection representative performing full coverage of various inspection work for the electrical and instrumentation activities with the main task of ensuring the contractor full compliance of aramco eng'g standard, procedure as specified in the contract document and schedule Q. E&I Inspector Stroytransgas/Dolphin Energy

March 2010 to October 2010 TFP-Project-Abu Dhabi UAE The project is the construction and laying of a 230km 48" natural gas pipeline from Taweelah (TRS) to Fujairah (FRS) incorporating Scrapper Launcher facilities, 9 Off Block valves stations (BVS), with all the necessary infrastructures for Instrumentation, pipeline Cathodic Protections Systems, telecoms and SCADA Interfaces and requirement for Dual fiber optic cables (FOC).

Held the position of E&I Inspector with the main task of ensuring that all activities as executed by the E&I construction group are will within the acceptable criteria as mandated by the Client (Dolphin) approved procedures, and method of statement, quality plans and inspection and test plan.

IFC drawings: performed internal inspection surveillance for in-process activities and Company Intervention Hold point, witness point alongside client representatives per Request for Inspection (RFI) Client PMT Electrical Inspector VELOSI Certification / Rasgas March 2009 to March 10, 2010 RGX2 Expansion Project Ras Laffan – Qatar

Expansion, Construction and commissioning of Rasgas liquefied natural gas plant phase II (RGX2) Incorporating 2 Unit new LNG process Trains (TRAIN 6 & 7) the largest of its kind with a combined production capacity of 15.6 Mta of LNG per year and a combined condensate production of 110 thousand barrel per days (kbd) and 1.6 Mta of liquefied Petroleum Gas(LPG)

Assigned as Client PMT Electrical Inspector during the final construction and commissioning phase of the project, performing various Quality Inspection work and verification of conformity by the EPC contractor CTJV and its sub-contractor’s per the approved ITP’s and QCP’s, and thru the guidelines of Rasgas eng’g standards for electrical construction testing and commissioning activities and Venture quality management system.

Carry out inspection and witnessing of Site Acceptance Test (SAT) precommisioning test as performed by contractors and vendors for engineered materials and processes for underground (earthing system, cathodic protection system) and above ground installation (Switchgear,Transformers and MCC upstream and Downstream Electrical and Mechanical Interlocked test, earth switches and circuit breaker mechanical functionality test, lux test for lighting, communication and fire and gas system etc.) based on approved acceptance criteria and test parameters.

Client TPI Electrical Inspector BUREAU VERITAS BVQI / GASCO September 2006 to January 04 2009 Onshore Gas Development Project PHASE-III

(OGDIII)

Project Code# 5208 Habshan - Abu Dhabi, UAE

The project entails the construction of new Upstream and Downstream Onshore Gas Development Project PHASEIII

(OGDIII) that would have a feed capacity of 1,306 MMscfd and increase gas production to approximately 2000 MMscfd from THAMANA “F”Reservoir.the new facilities includes process units for gas & condensate separation, condensate stabilization, gas dehydration, Sulphur recovery unit, gas treating, NGL Recovery, acid gas compression and residue gas injection. New pipelines for Gas gathering and transport from THAMANA “F” Field, New NGL Pipeline from GASCO to RUWAIS

Assigned as QA/QC Client TPI Electrical Inspector responsible for overseeing and Monitoring of Contractor Electrical Scope of activities that would include in process inspection Surveillance and witness point, hold point inspection and record review of Factory Acceptance Test (FAT), Review and Approval of contractors document submittal for Quality Control Plans (QCP) and Inspection and Test Plans (ITP) and Methods of Statement prior to project executions.

Carry out inspection and witnessing of Site Acceptance Test (SAT) precommisioning test as performed by contractors and vendors for engineered materials and processes for underground (earthing system, cathodic protection system) and above ground installation (Switchgear,Transformers and MCC upstream and Downstream Electrical and Mechanical Interlocked test, earth switches and circuit breaker mechanical functionality test, lux test for lighting, communication and fire and gas system etc.) based on approved acceptance criteria and test parameters.

Electrical Inspector SAUDI ARAMCO / ARABIAN BEMCO

May 2005 to September 2006 Madina Bulk Plant Project Contract No. 660******* B.I. NO. 10-03509

Madina – Saudi Arabia

The project is to build a new bulk plant to distribute 35,000 Barrels/Day turn over products from the Saudi Strategic Storage Program (SSSP) facilities at Site-7. The scope include eight truck loading island, fourteen loading skids, sixteen atmospheric tanks with related infrastructure for building, instrumentation and electrical, communication and Terminal Management System (TMS). Total storage capacity is approximately 520,000 barrels. .

ARAMCO Approved as QA/QC Inspector for Electrical works. Duties & responsibilities includes but not limited to preparation of work procedures and/or instructions, inspection / test plan, checklist and related full coverage disciplined inspection works in compliance with Schedule Q of the contract documents and applicable Saudi Aramco and International Construction industry Standard/Practices. Field Electrical Supervisor Saudi Toyo Eng’g Corp (SATEC) / ITS August 02, 2002 to October 19, 2003 Petrokemya Polyethylene Project - PKPE Jubail AI Sinaiyan, 31901

P.O box 11031 PKPE Project K.SA

Turnkey Construction and Commissioning of 800,00 MT New Polyethylene Plant owned by PETROKEMYA Saudi Basic Industry (SABIC)

Supervisor, control and monitoring of subcontractors electrical construction workforce directing various installation works in six different areas of the plant under my responsibilities.

Identify possible clash point with other disciplined bases or actual site condition and design drawing as well as implementing possible alternative without compromising specification and Eng’g standard.

Closely coordinating with client and main contractors field Eng’g and subcontractor for any design discrepancy and other changes, modification based on client comment..

Attending periodic progress and inter disciplined meeting to evaluate actual progress and project forecast.

Electrical installation done under my supervision involved underground and exposed conduit, cable trays, erection of DCS panel and control consoles, UPS system HVAC system, motor and MCC’S, grounding system. Heat tracing for process lines, Fire alarm and paging system telephone and MIS system. Light and small power. Medium and high voltage equipment and cabling

Electrical QA/QC Engineer JAL INTERNATIONAL Corp.

September 27, 2000 to April 21, 2002 Jubail Industrial City Jubail Al Sinaiyyah KSA

Two Projects involve the renovation and Cable revamping of Saudi Methanol Plant (AR RAZI) and Electrical revamping of AI Jubail fertilizer plant (SAMAD) That would includes the construction of additional Substations and Distribution facilities for plant expansions.

Directly implement total quality management for project being persuaded by company following application for ISO 9002 compliance certificate.

Initiate technical procedure and proper quality control documentation for installation, testing and commissioning of all equipment based on ISO 9002. In addition to this, approved technical specification, industry codes & standards are strictly implemented.

Perform site installation inspection in coordination with Client representatives following submission of inspection request.

Prepare inspection check items hold point and activity witness point for Company’s approval prior to site implementation.

Instrument QC Engineer CHIYODA PETROSTAR LTD.

August 1996 to October 1998 LUBEREF II Project

Yanbu Al Sinaiyyah KSA..

Construction of 1.2 Million Barrel base Feedstock New Lube oil refinery project PHASE II (LUBEREFII) Own by MOBIL

/ PETROMIN of Saudi Arabia. the project incorporate the latest YOKOGAWA DCS Technology.

Initiate inspection and test based on test procedure for Process, Instrumentation and System for Pressure lead piping,. Impulse line pressure test for transmitter and switches (i.e., Flow, Level, pressure) Test for signal converter air tubing (I/P converter, pneumatic control; valve and solenoid etc.) Power and control wiring insulation resistance test, continuity and loop check.

Establish and maintain closed coordination between CPL Eng. Group and Subcontractor for obtaining technical information pertaining to modification and design change, prior for site implementation, punch list identification and clearing.

Cooperate and assist official company designate QC Engineer. In performing installation inspection prior for final approval and as well as Preparing final Quality Control documentation for Client submittal prior to issuance of Mechanical Acceptance Certificate.

Field Engineer Atlantic Gulf Pacific Co. (AG&P) / Pullman Kellogg May 1995 to April 1996 (PKSAL) B.P 180 Wilaya Bethioua Oran, Algiers –31210 Renovation and upgrading of Sonatrach Liquefied Natural Gas Plant (LNG2) Incorporating Honeywell TDC 3000 DCS System.

Direct and supervise field personnel for the implementation of job order and work assignment specifically in Utility Area housing the 3 unit static Generator with capacity of 40 MW each, 5 unit low & high pressure Boiler, Control Room, Load Center and Motor Control Center (MCC)

Organized direct and monitor field personnel for their daily activities on site, ensuring timely project completeness and quality of workmanship as specified under contract and renovation schedule.

Coordinating with other disciplined ie, Civil, Mechanical, Instrument for the purpose of optimizing the most determine working plans and work schedules including series of sequential testing and commissioning of completed system. This involves functional accuracy test loop checking, control sequencing and signalization etc. Electrical Supervisor Asian Const. And Develop. Corp. (ACDC) / January 1993 to December 1993 Filippo Fouchi (spa) Bandar Mashar, Iran. Reconstruction of Vinyl Chloride (VC) Plant of Bandar Imam Petrochemical Complex (BIPC)

Served as Staff Engineer responsible for the preparation of working plans, Material Take Off and request.

Inform the Unit Contractor, any necessary revision to be carried out on certain areas where normal procedure cannot be made possible due to technical problems. This also to include alternatives and prepared As Built plans As well as Coordinate with other disciplined (i.e., Civil, Structural, Mechanical etc.) to effectively implement activities without loss of man-hour due to delay that may arise.

Direct and supervise Foreman and Skilled Labor for their daily activities and site assignmanship specifically on hazardous location as specified on plan.

Product Engineer Al Zamil Refrigeration Industries, May 1990 to July 1991 Industrial City Dammam, KSA

Company line of product. Includes RAC Air Conditioning, Split System, Packaged type, chiller and Air Handlers

Modification and re-detailing of Unit Control Circuitry based on customer preferences as determined by Approved Purchase Order (APO).

Direct and assist laboratory personnel in conducting a series of performance test and trial to new product to be approved for mass production. Direct and assist designer Draughtsman to better represent proper engineering and assembly layout, component mounting on Control Boxes and Panel Board, System’s associated wiring and Schematic Diagram.

QA/QC Engineer M/S. Al Suwaidi Co,

November 1988 to December 1989 Rahima – Rastanura, KSA PEACESHIELD Project involving installation and Construction of Long Range Radar (LRR) facilities. Owned by royal Saudi air force (RSAF) located in all Saudi Arabian Frontier.

Performed ongoing construction Electrical inspection, ensuring project completeness quality of workmanship and material as specified under contract and code standard.

Monitoring daily project activities ensuring proper scheduling and identify priorities to be implemented within acceptable time frame. Advising construction personnel on changes and project upgrading

Liaising with other disciplined participate in daily planning and progress report meeting Prepare in depth test report observation and write recommendation.

.Assist in installation, testing and commissioning of system equipment control such as motor control system and pneumatic device actuation test to include damper actuator, limit switching, temperature and pressure differential switches, floats switches etc.

Electrical Technician Mitsubishi Heavy Industries Ltd.(MHI) March 1987 to November 1988 Qurrayah Abqaiq, KSA

Construction of 1200 MW Steam Thermal Power Plant (SCECO East)

Conduit laying and installation of concrete encased duct bank, cable tray and cable duct fabrication and installation. Panel Board installation and termination of instrument control and power cables. Assisted Vendor in rewiring modified circuit control for MCC and Load Center during modification and sequence revision.

Assisted the commissioning personnel during sequential test of all power receiving equipment, Hi-potential Dielectric test for HT Cables and Switch Gear, Load Center 1985 to 1987 B & E Builders Enterprises Inc.,

Cubao, Quezon City Philippines

Industrial Electrician / Cadet Engineer

Company engaged in preventive maintenance, contracting and building construction

Serve as Electrical Technician, installing equipment such as power transformer, motor and control circuit

Performing maintenance and repair of control circuit and its associated wiring system. Performed final test, commissioning and inspection of installed circuit, prior to final turn over of equipment to company principal/clients

Layout of Electrical wiring system for both power lighting in building construction as per floor plan and PEC standard.

.