Licensed Professional Electrician with over 18 years of experience in commercial & Industrial construction; In-depth knowledge of Oil & Gas operations and facilities, with extensive background in Commissioning
(FCO) and Start-up of Electrical, Instrumentation and Fire & Gas systems in remote Arctic and sub-arctic environments; Code knowledgeable, safety conscious craftsman with a firm understanding of business sys- tems, modern computing programs and Permit-to-work operations. LICENSING:
Alaska Certificate of Fitness- Electrical Journeyman, Cert. #20070111 Texas Journeyman Electrician #129829
North Dakota Journeyman #J7968
Idaho journeyman # J-35883
EMPLOYMENT / REFERENCE
6/20 to present CONAM, Anchorage, Alaska
Construction, QC and FCO of WellHouses for Hilcorp. Scott Crosby 907-***-**** 12/19 to 4/20 UDELHOVEN, Kenai,Alaska
QC Position on new Construction and shutdown for Marathon Oil refinery. Project was postponed due to the Covid-19 outbreak.
Bill Simonson - 907-***-****
6/18 to 12/19 ICE SERVICES, Anchorage, AK
Camp maintenance and construction at the Aurora Express Camp. Responsible for repairs and maintenance on all camp systems including HVAC, Fire Alarm and Electrical
` distribution equipment. Frank Ormonde 907-***-**** 3/18 to 6/18 DELTA CONSTRUCTORS, Anchorage, AK
GMT 1 Project - Installation of new oil production facility. Responsible for medium voltage terminations, splices and general wiring for electrical/instrumentation/fire and gas systems. Josh Mishou-660-***-****
8/17 to 11/17 CONAM, Anchorage,AK
BP Flow Station 2 Gas Compressor replacement
Installation of new Gas compressor motor: associated wiring, Instruments and Fire/Gas System. Tarry Burret-321-***-****
9/16 to 4/3/17 OTSL, Borger,Texas
Agrium
Electrical commissioning and startup of Allen Bradley Medium/HighVoltage Switchgear and Mcc’s (13,8k/4160/480volt) and associated Transformers, Motors and motor controls. Roland Salinas 907-***-****
7/16 to 8/16 ASRC, Kenai, Alaska
Hillcorp - North Star Metering Skid
Installation of electrical and Instrumentation systems. Chimo Phillips 907-***-****
4/25/16 to 5/8/16 Big G Electric, Kenai, Alaska
Tesoro Plant
Inspect and certify various Medium and LowVoltage Switchgear, MCC’s and transformers during facility shutdown
Robert E. Franks !1
Myles Sansotta 907-***-****
12/14 to 4/16 JAGO, Anchorage,AK
Exxon - Point Thompson Project
Performed FCO commissioning and startup of ABB Medium/Low voltage switchgear/ MCC’s and associated transformers (wet and dry). Also motors, motor controls, UPS units, HVAC Systems and heat trace. Matt Robinson 626-***-**** 9/13 to 12/14 ASRC, Anchorage, AK
ENI Petroleum- Oliktok Point- Nikaitchuq Oilfield
Electrical O&M for processing facility and associated well houses. Steve Redburn 907-***-****
9/12 to 4/13 EVERYTHING ELECTRIC, Soldotna, AK
Riverside Assisted Living Facility
Installation of commercial wiring system including Service and Main Switchgear setup, underground work, security and Fire Alarm systems. John Trippe 907-***-****
06/10 to 08/12 UDELHOVEN, Anchorage, AK
Cook Inlet Natural Gas Storage Facility (CINGSA)
Construction of Natural Gas compressor station located in Kenai. Vince Simac 907-***-****
Kuparuk Oilfield Fire & Gas Upgrade
Fire and Gas system upgrade at Central Oil and Gas Processing Facilities at Kuparak.
` Chris Berger 907-***-****
09/09-01/10 ASRC, Anchorage, AK
Endicott, BP Liberty Drilling Rig
Final construction and startup of 8 Caterpillar Power Modules for British Petroleum Liberty drilling rig.
Dave Forse --907-***-****
01/08 – 07/09 DELTA DEVELOPMENT GROUP, Anchorage, Alaska Pioneer Natural Resources- Oooguruk Oilfield
Commissioning (FCO) and testing of electrical equipment and instrumentation loops for onshore and off-shore production facilities (OTP & ODS) Including: Medium and Low voltage Switchgear/MCC’s (Seimens), PLC’s, VFD’s, HVAC and DCS systems. Work included Start-up of field production and first oil. Steve Nichols – 907-***-****
09/07 – 12/07 VECO, Anchorage, AlaskaPioneer Natural Resources- Oooguruk Oilfield Performed FCO inspections and testing, of instrumentation, motors, UPS units, VFD’s and Fire/Gas systems during construction phase of project. Pete Byrus - 907-***-****
05/07 = 0907 UDELHOVEN, Anchorage, Alaska Trans Alaska Pipeline, Alyeska Pump Station #3 Performed Commissioning (FCO) inspections and tests on medium voltage equipment, UPS and VFD Electrical systems.
Randy Scott – 907-***-****
Robert E. Franks !2
08/05 – 05/07 PARKER ELECTRIC, Austin, Texas
Highlights include work in computer/data centers, installation of UPS systems and back- up generators, hospital surgical and decompression facilities, and clean room environ- ments.
Bobby Parker – 512-***-****
04/05 -08/05 KST ELECTRIC, Austin, Texas
Installation of instrumentation system for the City Of Austin Chilled Water Facility. KD Lang – 512-***-****
05/01 – 09/04 BJ ELECTRIC, Austin, Texas
History includes fire alarm installation and repair, underground and tilt wall construction, power distribution centers and new/remodel work of office and retail spaces. Jack Payne – 512-***-****
CERTIFICATIONS
3M Certification for Medium Voltage Terminations and Splicing TWIC Card
Osha 10 Training
North Slope Training Cooperative (NSTC) certificate # 00612236 NFPA-70E Standard for Electrical Safety in the Workplace First Aid/CPR/AED
Crouse Hinds MCHL/IPCHL Hazardous Location Termination Training EDUCATION:
05/06 International brotherhood of Electrical Workers Local 520 Joint Apprenticeship Training Committee (JATC)
05/81 Associate of Applied Science: Industrial Electricity and Electronics Lamar University, Beaumont, Texas
05/91 Emergency Medical Technician (EMT)
Austin Community College, Austin, Texas
Robert E. Franks !3