RESUME
MECHANICAL ENGINEER
(HVAC-PLUMBING ENGINEER/PROJECTS&SITE ENGINEER)
Mohammed Farhan Ahmed
Dubai, U.A.E.
Mobile No.: +971*********
Email: **.************@*****.***
**.************@*******.***
CAREER OBJECTIVE
• SUMMARY OF EXPERIENCE To work with a reputed organization which provides ample opportunity to widen and develop business and technical skills and a work environment potentially conducive to growth.
Over 8.6 years of experience in MEP Engineering and construction Field. AREAS OF EXPERTISE
• Preparing method statement complying with the specification and getting the consultants approval.
• Preparing material submittal complying with the specification and getting the consultants approval.
• Preparation of Material request in conformity to the project requirement.
• Check shop drawings, coordination drawings and specifications of the project to insure the results indicated are being achieved well.
• Execution of MEP Systems such as Fire fighting, HVAC, Plumbing systems, Drainage system, Water supply line and Sanitary fixtures, Electrical and Lighting with the program schedule for proper flow of work on site.
• Confirms the installation of all work within discipline is in accordance with the plans, specifications and industry standards.
• Check Inspection and Test Plans (ITP’s) for each activity to ensure that they adequately reflect the specified requirements and that the ITP’s are being followed properly.
• Raising inspections and clearing them from consultants in accordance with the approved shop drawings, and verifying the comments raised from consultant.
• Co-ordination with the Site Supervisors, Site Engineers, Design Engineers & QA/QC Engineers for timely completion of the job.
• Attend Consultant’s Technical meeting with Project Manager, Construction Manager, Co- Staff and Sub contractors.Testing&Commissioning of HVAC system,FM-200,1G-100 systems.
• Prepares and conducts MEP Weekly progress meeting with the Sub contractors.
• Inspection, maintenance and security of all tools, equipment and personal protective clothing.
• Check shop drawings, coordination drawings and specifications of the project to insure the results indicated are being achieved well.
• Close out for Snagging and De-Snagging,Producing the As built drawings. Project handover documents submission O&M manuals, Attic stocks, Warranty Certificates etc.
• Preparation of weekly progress report.
PROFESSIONAL QUALIFICATION
B.TECH - Mechanical Engineering (2007-2011)
TECHNICAL SKILLS
MEP Coordination, Quantity Takeoff and Preparation of BOQ’s, Work allotment/Monitoring, Material procurement/management.
IT Skills: Ms-Office, AUTO-CAD, MS-PROJECT, ERP.NAVIS, REVIT, ACONEX WORK EXPERIENCE
COMPANY NAME :BERKSAN MUHENDISLIK INSAAT VE SANAYI
Project: R74-STATION METRO-DIP-1-DUBAI
Designation: MECHANICAL ENGINEER
Location: Dubai, UAE
Duration: April 2019 - Present
COMPANY NAME :GBHIC LLC
Projects :DEWA-G+4, NESTO –NADAL HAMAR & G+13-AL FURJAN
Designation: MEP ENGINEER
Location: Dubai, UAE
Duration: April2017 – April 2019
COMPANY NAME :EVERRISE ELECTROMECHANICAL LLC:
Project: R74-STATION METRO-DIP-1-DUBAI
Designation: MECHANICAL ENGINEER
Location: Dubai,UAE
Duration: March 2015-April-2017
PRESENT PROJECT: R-74 METRO STATION- 2020-TILL DATE CONSULTANT : PARSON & SYSTRA
MEP Contractor : BERKSAN ENGINEERING- FROM-2019 MAY –PRESENT WORKING Main Contractor : EXPOLINK
Working Mechanical Project Engineer to handle the site in execution & testing –Commissioning of HVAC Equipments of Chilled water Plant Equipment’s and Piping and of FAHU, AHU, FCUs, Ventilation system, Plumbing and drainage system pressurization system and car park ventilation system IG- system BMS System with Testing and Balancing Checked technical designs and drawings for adherence to standards. In this Project I have Involved in handling of Mechanical Team Installation of Ducting, Eqipments,Chilled piping, Generator Fuel Oil System Piping, Tunnel Ventilation Ducting and Fans, Testing -Commissioning,AirBalancing and water balancing. External Drainage Piping Installation for Utility Services,FM-200 System, Integrity Test, BMS Testing and Commissioning HVAC System. Prepared site reports and organized subcontractor invoices, codes documentation and schematics. Checked technical designs and drawings for adherence to standards. Established and implemented construction schedules, methods, equipment and labor requirements using Gantt charts and project management software. Worked within current codes of practice to maintain health and safety of staff at all times. PROJECT: NESTO -NAD AL HAMAR, DUBAI
CONSULTANT : DESIGN CENTRE
MEP Contractor : GBHIC LLC (From 20-07-2018 -20-05-2019) Main Contractor : GBHIC LLC
Worked as Mechanical Site Engineer to handle the site in execution DEWA (G+4) BUILDING, DEWA ACADEMY, DUBAI
CONSULTANT : ALTHURATH ENGINEERING CONSULTANTS
MEP Contractor : GBHIC LLC (From 13-05-2017 -17-07-2018) Main Contractor : GBHIC LLC
In this Project, I have worked as Mechanical Site Engineer for HVAC Equipment's Installation
,Testing Commissioning, Installation of IG-100 System,BMS System, Firefighting Pump Piping works, Breeching Inlets &FHC System installation, Chilled water and Firefighting System Flushing, Drainage Piping for External Roof and Utility System. Established and implemented construction schedules, methods, equipment and labor requirements using Gantt charts and project management software.
Monitored team of personnel during construction activities for compliance with health and safety requirements.Sourced and managed construction materials worth over for sites. Checked technical designs and drawings for adherence to standards. Prepared site reports and organized subcontractor invoices, codes documentation and schematics. PROJECT: -SERENIA RESIDENCES, THE PALM DUBAI
MEP CONSULTANT : TED JACOB ENGINEERING CONSULTANTS MEP Contractor : AL FUTTAIM ENGINEERING
Main Contractor : KHAN SAHEB
Subcontractor : Everrise Electromechanical LLC (From 15-06-2016 - March-2017) Worked as Mechanical site Engineer a to handle the site in execution & Quality Department in this project for District Cooling System with installation of FAHU, AHU, FCUs, Ventilation system, Plumbing and drainage system pressurization system and car park ventilation system, Firefighting system. PROJECT: - ABUDHABI ISLAMIC BANK, HEAD QUARTERS (ABUDHABI) This project Description with contents of twin -Tower buildings (300 TR air cooled chillers system & with AHU, CRAC Units, VAV Installation and Execution of HVAC system, Plumbing and Drainage Piping. Worked as Mechanical site Engineer a to handle the site in execution & Quality Department in this project
MEP CONSULTANT : ATKINS
MEP Contractor : AL FUTTAIM ENGINEERING (From 05-03-2015 -10-06-2016) Sub contractor : EVERRISE ELECTRO MECHANICAL LLC
Main Contractor : AL TAYER STOCKS
Worked as Mechanical site Engineer a to handle the site in execution & Quality
HVAC System, Plumbing system and Ig-system.
Responsibilities:
In this Project,I have worked as HVAC Project Engineer, Handled Site Team for HVAC System Installation and Commissioning works for Chillers AHU'S, Ducting,Chilled water Piping Execution and T&C,documents, clearances, certificates and approvals from local, state and federal agencies. Established and implemented construction schedules, methods, equipment and labor requirements using Gantt charts and project management software. Managed various stages of construction projects, including and Sourced and managed construction materials worth over for sites. Checked technical designs and drawings for adherance to standards. Prepared site reports and organized subcontractor invoices, codes documentation and schematics. Preparing the material submittal and check the drawing for final approval Chilled water pipe line installation work and ducting work Chilled Water Pump, Chiller, Cooling tower Fan Coil Units, Fresh Air Handling Units, Exhaust Fans . PROJECTS – HANDLED IN INDIA- Worked as HVAC Project Engineer – From-Aug 2011 to Feb 2015 HVAC Engineer: INFITY BUILDING SOLUTIONS BANGALORE (From 10-06-2013 -15-02-2015) Project: CONGNIZANT TECHNOLOGY-Bangalore.
I had been working as a HVAC Project engineer and working on installing of all HVAC equipments like CHILLERS (150TR), FAHU, PUMPS, COOLING TOWERS &PLUMBING, & DRAINAGE SYTEM. Project: HUAWEI TECHNOLZOGIES Bangalore
I was working as Site Engineer for Installaion and Execution of HVAC System,G.I Ducts & Chilled water Piping and Installation of VAV,CAV,AHU,FCU VRV Systems etc. HVAC Site Engineer: Armreache Air-condition India Pvt ltd Bangalore,(10-06-2011 -15-05-2013)
Handled:CISCO,HUWAEI,TAGOTECH,CTS
In This Company worked as HVAC Project Engineer for Installation HVAC Equipment's Like VRF SYSTEMS,CHILLERS FCU,VAV,FAHU,AHU etc
Prepared diagrams, charts and surveys showing information about job locations and project scopes.
Used to keep detailed records of daily progress, incidents and issue resolutions.
Established and implemented construction schedules, methods, equipment and labor requirements using Gantt charts and project management software.
Prepared site reports and organized subcontractor invoices, codes documentation and schematics.
Testing Commissioning of HVAC System.
PERSONAL DETAILS
I hereby declare that above mentioned information is true in best of my knowledge. K.MOHAMMED FARHAN AHMED
Date of Birth 07-09-1989
Permanent Address
Kumarswamy Layout 2nd stage, 4th cross.560078
Bangalore,Karnataka,India
Languages Known
English, Hindi, Kannada,Telugu, Urdu, Tamil
Passport no: J8439370
Sex Male
Declaration