Gary Ollegue Bananal
No * Gladiola St., Ph-3, St. Michael Homes, Pandayan,
Meycauayan City,3020, Bulacan.
Mobile No.: (092*-******* / (092*-*******
E-mail: adhmmv@r.postjobfree.com /adhmmv@r.postjobfree.com
OBJECTIVE:
Technical man having 24 years of working experience in the field of CIVIL, CONSTRUCTION WORKS, seeking for a position that will allow me to apply my long years of engineering experience in the field of construction repair and maintenance of civil / Structural works and water & sewerage system. WORK EXPERIENCE
1.
2.
3.
Company :
Duration :
Position :
Company Industry :
Head Office
Duties and
Responsibilities:
Company :
Duration :
Position :
Company Industry :
Head Office
Duties and
Responsibilities:
Company :
Duration :
Position :
Company Industry :
Head Office
Duties and
Responsibilities:
PURE GREEN SOLUTION TECHNOLOGY INCORPORATED
December 27,2019 – Present
Project In-Charge
Waste Water Facilities Contractor
Unit 1101 Park Trade Tower, Madrigal Business Plaza, Alabang, Muntinlupa.
Prepares Bill of Quantities for Proposed 1,020 Sq.M. Virgin Coconut Oil Processing Plant for Local Gov’t. of Quezon Province.
Supervising Construction of Modular Type Waste Water Treatment Facility for Solaire Vertis North in Quezon City.
Prepares schedule of Activities.
Prepares Shop Drawing and As-Built Drawing,
Prepares GANTT Chart of Activities.
Prepares Daily and Weekly Progress Report.
JAIROELYNN CONSTRUCTION AND GENERAL SEVICES CORPORATION October 04 2019 – December 21, 2019
Project Engineer
General Construction
No 8A Everlasting Street, Brg’y. Roxas District, Quezon City, Metro Manila
Prepares BOQ,Bid proposal for facilities management and maintenance project for St. Lukes Medical Center, and Coca Cola Philippines.
Prepares Build and Design Documents for proposed 5000 Sq.M. Industrial Warehouse for Octacrom Enterprises.
Prepares Design and Estimetes for Proposed 720 Sq.m. Warehouse for Quantum Diversified Product.
Attended Pre-Bidding Conferences at St. Lukes Medical Center.
Prepares Manpower and Materials Schedules using Gantt Chart and S- Curve.
Supervises On-Going Improvement of 3-storey residence in Quezon City. CELLOKEY INCORPORATED
August 5 2018 July 2019
Project Engineer
General Construction
56-B Sibesco St., Victoria Village, Brg’y. Canumay East, Valenzuela City, M.Mla.
Prepares BOQ,Bid Proposal For Facilities Management and Maintenance Project for St. Lukes Medical Center, Quezon City & Bonifacio Global City
Prepares Design, Drawings and Materials Take-Off for Fabrication / Fit out Works for Industrial and Commercial Equipments,
Prepares Schedule of Activities and Manpower for Rehabilitation projects,
Prepares Safety Requirements Documents,
Monitor Subcontractor Activities and Performance
Prepares As-Built Drawing
Prepares daily and weekly accomplishment report. Page 2 of 5
2
4.
Company :
Duration :
Position :
Company Industry :
Head Office
Duties and
Responsibilities:
GOB CONSTRUCTION
September 08, 2013 - July 2018
Proprietor
Construction, Engineering
No. 2 L.Gonzales Road Ext’n. Brgy. Bunducan, Bocaue, Bulacan
Prepares Projects Cost Breakdown, Bill of Quantities and Bid Proposals
Prepares Construction Drawings, Estimates and Materials requirements as per Clients basic Design Concept,
Prepares Schedule of Activities, Manpower and Equipment prior to Mobilization,
Prepares sets of Documents necessary for securing Government permits
Prepares Schedule of Manpower, and Activities required prior to execution of the project
Reads blue print and verify on site if standards and specifications are followed
Reads Schedule of Activities Chart and Verify on Site if followed
Prepares Daily, Weekly and Monthly Progress Report
Prepares Completion Report and As-Built Drawings prior to Application of Certificate of Completion and Occupancy.
5.. Company
Duration :
Company Industry:
Position :
SENDAN INTERNATIONAL COMPANY LTD.
July 11 2011 – Aug.6, 2013
Industrial Project Construction
CIVIL SUPERVISOR
Head Office:
5.1 Project :
Client:
Location:
Duration:
Duties and
Responsibilities:
Tareeg 114 Jubail 1 Industrial City, Kingdom of Saudi Arabia PROJECT HANDLED :
WORK RELATED TO LQ53 ( PART-1)
CONST’N OF HYDRAULIC,TRANSFORMER ROOM, & ELECTRIC CABIN. JUBAIL ENERGY SERVICES COMPANY (JESCO)
JESCO Seamless Plant, Jubail Industrial City, Kingdom of Saudi Arabia July 15 2013 – Aug. 05, 2013
Supervised Earthworks for Hydraulic room, Ttransformer room and Electric room Foundation, Cable Trench and Cable Pit.
Prepares Bar Bending Schedule and Steel Embedded items take off as per Standard Drawing,
Supervised Formworks and Rebarworks, for Building Footing, Grade Beam, Column,Roof beam, Roof slab, Cable pit and Hudraulic channels as per Approved Drawings
Supervised Concreting of Structural Members as per Approved Procedure
Supervised relocation of existing 600mm. diameter PVC sewer pipeline and concrete pre-cast manholes,
5.2 Porject :
Gen.Con:
Location:
Duration:
Duties and
Responsibilities:
TRANSFER FUNCTION OF SWICHGEAR 2A
JGC INTERNATIONAL CO. LTD.
AL-KHAFJI JOINT OPERATION, Khafji City, Kingdom of Saudi Arabia March 25 2013 - July 14,2013
Incharge in the Completion and Finishing work of Transfer Function Switchgear Building,
Supervised Formworks, Rebarworks and Concreting of Concrete Duct Bank
Supervised Construction of Reinforced Concrete HVAC Foundation, and Steel Structure Pedestal,
Supervised CMU works and Installation of Quarry tile in Battery room,
Supervised Plastering and Painting works of Switchgear Building External and Interior Masonry Wall,
Supervised Excavation, Rebarworks, Formworks Sleeving and Concreting of Cable Pit, Neutralization Pit, Soak Pit and Floor Sink
Supervised Installation of Steel Access Ladder from Roof Deck to Ground Floor,
Supervised Application of EPDM Single ply waterfroofing on Roof Deck Page 3 of 5
5.3 Project :
Client:
Location:
Duration:
Duties and
Responsibilities:
5.4 Project :
Gen Con.:
Location:
Duration:
Supervised Installation of Carbon Steel and uPVC Sewer Line from Battery room to Neutralization pit,
Prepares Daily Activities Report,
REHABILITATION OF CHEMICAL WAREHOUSE AND LAYDOWN
MINISTRY OF INTERIOR, KINGDOM OF SAUDI ARABIA
Royal Saudi Naval Port, Khafji City, Kingdon of Saudi Arabia Feb.02 – March 18,2013
Prepares Standard Drawings and Quantity Take off,
Prepares Materials Take off Based on Saudi Aramco Materials Sytem Specifications, as per Saudi Naval Port Technical requirement prior to implementation of Rehabilitation Work
Arranges Equipment and Transfortation required for mobilization and operation,
Arranges Schedule of Labor force as per Work Execution and Plan,
Prepares Method Statement and Job Safety Analysis,
Supervises Work Implementation on Site and on Fabrication Workshop
Supervises Repair of existing Roof Frame and Installation of Pre-Painted Long span Corrugated Rib-type Panel and Roofing Accessories.
supervises Repair on Existing Concrete Wall using Concrete Adhesive and Concreting of Slab on fill,
Supervised Fabrication and Installation of Steel Gates, Steel Flush Door, Roller Rail Guides, and Material Rack,
Supervised Application of Water Resistant Epoxy paint,
Supervised Application of Masonry paint on Interior and exterior wall of Warehouse,
Supervised Application of Fire Retardant Paint on Wooden Trusses,
prepares as built drawing and final measurement prior to hand over of the facility,
SADARA TANK FARM SITE PREPARATION & TANK FDN.CONSTRUCTION PROJECT
DAEWOO ENGINEERING AND CONSTRUCTION
Tank Farm, Jubail 2, Kingdom of Saudi Arabia
March 2012 – Sept. 23, 2012
5.5 Project:
Gen. Con.
Location:
Duration:
WASIT GAS PLANT SITE PREPARATION PROJECT
SOUTH KOREA ENGINEERING AND CONSTRUCTION
Khursaniyah, Eastern Province Kingdom of Saudi Arabia July 27,2011 to March 2012
Duties and
Responsibilities:
Prepares Civil and Utility Drawings, Quantity and Materials take-off as per Saudi Aramco Engineering Standard,
Prepares Method Statemants and Job Safety Analysis,
Supervisd Construction, Repair and Maintenance of Underground and Aboveground Piping Installation for Fire water, Potable water and Sewer lines Network System,
Supervised Hydro-Test for Potable Water and Fire Water line,
Supervised Fabrication of Pre-cast Concrete Foundation for Transformers, Distribution Boards and Lightning Poles.
Prepares Design Capacity of Water Tanks and Pumps for Potable water supply and Fire fighting system,
Prepares Design Capacity and Supervise Construction of FRT Septic Tank and Underground Concrete Grease Interceptor,
Supervised Construction of Concrete Foundations for Above Ground Water Tank, Generators and Fuel Tank.,
Supervised Construction and Interconnections of PVC main to Fiber Glass Reinforced Manhole, and Construction of Concrete Footing,
Supervised Installation of Fire Hydrants and Fire Hose Cabinet,
Prepares Daily and Monthly Activity Reports,
6. Company : ARBi CONSTRUCTION, DESIGN CERVICES
Duration: Jan 7, 2006 - Apr 23, 2011
Position : Project Supervisor
Page 4 of 5
Company Industry: Construction / Building
Location Mc. Arthur Highway, Abangan Sur, Marilao, Bulacan Duties and
Responsibilities:
Prepares Plans Quantity and Materials Take-off for Construction of Multi-storey Residential Buildings
Prepares Plans and Proposal for Rehabilitation and Renovation of Commercial and Residential Building
Prepares Work Schedule and Manpower Distribution on site,
Supervised Building layout and Excavation of Building Foundation,
Prepares Design of Potable Water System for Residential Subdivision,
Supervised Excavation Works and Installation of Transmission & Distribution Pipeline
Supervised Installation of Deepwell Discharge Manifold and Tie in point,
Supervised Rehabilitation and Replacement of Corroded Cast Iron and Galvanized Iron Water Mains with PVC pipe,
7. Company : MARILAO WATER DISTRICT
Duration: May 26, 1996 - Sep 15, 2004
Position : Sr. Water and Sewerage Maintenance Man-A Company Industry: Water Utilities
Location
11 T.Sandico St., Poblacion 2, Marilao, Bulacan
Duties and
Responsibilities
• In-charges on the Preparation of Basic Plans, and Estimates on the Proposed Water Distribution Service Area Expansion Projects,
• In-charges in the Supervision of Construction, Repair, and Maintenance of the Utilities Transmission, Distribution and Service Pipeline Connections,
• Supervised Rehabilitation of Old existing Cast Iron, Galvanized Iron and Asbestos Cement Pipes to uPVC Pipes,
• Supervised Installation of Water Supply Pipeline to Commercial & Residential bldg.
• Supervised Installation of Commercial and Residential Fire Hydrants,
• Supervised Construction and Maintenance of Pumping Stations,
• Monitor Subcontractor Activities and Performance.
• Prepares Weekly and Daily Accomplishment Report
EDUCATION
Highest Education Second Highest Education
Education Level: Diploma Diploma
Course: Bachelor of Science in Civil Engineering Secondary Education School/University: Mapua Institute of Technology Meycauayan College Location: Intramuros, Manila, Philippines Meycauayan Bulacan, Phil. Date: June 1991 - March 1996 Jun 1987 - Mar 1991
LICENSES/CERTIFICATIONS
1.
Career Civil Service Eligiblility
Rate - 84 % Proffessional
03050183
Jul 18, 1997
SKILLS
1.
Designing and
Quantity Take Off
16 years
Can prepare basic construction plan, specifications and bill of quantity for civil works and plumbing works project 2.
3
.
4.
Man power
Management
Computer Literate
Design & Rendering
16 years
22 years
08 years
can handle distribution of labor force as per required in the coverage and situation on the project sites.
Knowledge in MS Word, Excel, and Powerpoint,
Knowledge in AutoCADD, and 3D Modeling.
Page 5 of 5
TRAININGS/SEMINARS
Date Topic/Course Title
May 12, 2012
March 01, 2012
February 23, 2012
February 02, 2012
Jan 23, 2001- Jan 26, 2001
SAFETY ON EXCAVATION WORK
Sendan Office, Road 114, Jubail Industrial City KSA AWARENESS SESSION ON PERMIT TO WORK (PTW) PROCEDURE Saudi Aramco, Package 4, Satellite office, Wasit gas project site JOB SAFEY ANALYSIS AND METHOD STATEMENT TRAINING
Saudi Aramco, Package 4, Satellite office, Wasit gas project site FALL PROTECTION FOR SAFETY PRACTITIONER SEMINAR AND WORKSHOP
Saudi Aramco, Package 4, Satellite office, Wasit gas project site PHILIPPINE ASSOCIATION OF WATER DISTRICT NATIONAL
CONVENTION
Holliday Inn Resort, Clark Field, Pampanga, Philippines. May 25, 1999- May 28,
1999
WATER MAINTENANCE HEAD SEMINAR AND WORKSHOP
TESDA Training Center, Guiguinto, Bulacan, Philippines REFERENCES
Dolores M.Clark
Crispin Areglo Jr.
Rene Leonardo
Contractor CEDRIC Waterproofing +63-949-***-****
Contractor Waterworks System +63-923-***-****
Contractor Building +63-935-***-****
PERSONAL INFORMATION
Nationality
Date of birth
: Filipino
: October 3, 1971
Civil status : Widowed
Height : 172 Cm
Weight : 70 Kgs
Passport no. : P5273181A
NBI clearance : B554JGCY17-LM593436
Philhealth : 07-000025820-0
TIN no. : 906-770-505
Pagibig MID no. : 121*-****-****
SSS No. : 34-8050239-0
Driver’s lic. no. : C07-05-001082
I hereby certify that all the information i have declared above is true to the best of my knowledge and belief.
GARY O BANANAL
(Applicant)