Post Job Free

Resume

Sign in

Operator Construction

Location:
Hillsboro, IL, 62049
Salary:
30.00 hr
Posted:
November 05, 2020

Contact this candidate

Resume:

Michael Wallace

** ******** **

Hillsboro Il. ***49

217-***-****

Objective: To obtain A position with a prominent company that offers stability, growth, and advancement opportunities. One where i can utilize my skills and training in the construction industry.

Experience: PLS inc. Champaign IL.

Millwright/ Pipefitter 3-2015 to present

y Pipefitting- worked on a 12in. fire prevention system for a natural gas condensate plant

y overhead crane operator- operated a pendulum style 90 ton overhead crane

y iron worker- some structural welding of I beams and flooring y milwright- working on a monsanto seed production facility y sprinkler fitter- set up and installed fire prevention systems Dunns Real Estate Hillsboro IL

General construction and laborer 01-2003 to present y General labor

y plumbing

y drywall

y light carpentry

y fixing and maintaining houses for sale

gsi inc Assumption IL

Millwright/ Laborer 2-2003 to 10-2005

y building grain dryers from start to finish

y proper erection of components and structure

y working long hours and getting project done in a timely fashion Labor local #1084 hillsboro IL

Laborer 12-1997 to 7-2002

y Heavy highway and building construction

y Hazardous material and waste testing and removal y Confined spaces

y Concrete work

y Asphault

y All types of basic construction labor

Michael Wallace Page 2

Welch const. Monterey Ca

Labor supervisor 03-1995 to 12-1996

y Building natural gas filling stations

y work with a certified welder

y pipefitting

y operate a backhoe

y compaction testing

y supervise crew is working to desired potential and meeting deadlines Education: Hartnell college salinas ca

none completed 1992-1995

I took several environmental and mechanical technology courses. Basic welding and metalurgy. And all required curriculum Illinois Laborers and Contractors joint apprenticeship Mt. Sterling IL N/A 97-99

Phase one

y Scaffold building

y Rough terrain fork lift

y concrete sawing

y forming

y basic finishing

y asphalt technology

phase two

y lead paint abatement worker and supervisor certification y initial site testing preperation encapsulation paint removal re-testing y principles of pipe laying

y gravity flow systems

y sewer laser systems

y utility line and grade

phase three

y Blue print reading and spec.

y Laboreres AGC 80 hour hazardous waste worker cert. y identification and testing methods

y cleaning spills

y over drum and fixing leaks

y Decontamination

Michael Wallace Page 3

Construction Careers of America Sikeston MO

cert. 2006

backhoe operator and cert.

y level one backhoe certification

y passed national center core- training based on NCCER curriculum y construction site safety and proceedures

Midwest Technical Institute Springfield IL

Certificate 2015

Journeyman welder 2 program

y MIG, TIG, and stick

y completed 7 of the 8 certs offered (available upon request) y blueprint and pipe drawing

y pipefitting training

References: Available upon request



Contact this candidate