Post Job Free

Resume

Sign in

Civil Engineer Engineering

Location:
Cairo, Cairo Governorate, Egypt
Posted:
November 05, 2020

Contact this candidate

Resume:

MOHAMED HESSIN

HARRAZ

CIVIL ENGINEER

002***********

adhkhj@r.postjobfree.com

ABOUT ME

Personal Profile

Highly capable Civil Engineer with

strong initiative, enthusiasm and

the drive needed to achieve high

quality, timely, safe and cost

elective implementation,

motivated to accept design

challenges and exceed client

expectations

Personal skills and competencies

able to understand translate and

implement designs confidently.

strong analytical and problem

solving skills with a distinct

a5enfion to detail.

Conversant with standards and

international health& safety

requirements.

Methodical and structured work

approach, with positive team work

ethic.

Extensive knowledge of

AutoCAD, Microsoft and relevant

software.

fluent in both English and Arabic.

Career Objective

To attain a challenging position in

a dynamic environment where I

can creatively implement my

design,

Problem solving and interpersonal

skills further allowing me to

explore my qualities whilst

offering me opportunities for

growth and enhancement.

WORK EXPERIENCE

QD-SBG

CONSTRUCTION

Qatar / Doha

Mar 2017 - Oct 2020

Civil Site Engineer

• TITLE: SITE ENGINEER

• PROJECT:CP7B-Lusail plaza infra-structure,LRT station,

• Public car parks & L/scap.

• LOCATION: QATAR,

• CONTRACTOR: Qatar Diar Saudi Bin Laden Group(QD-SBG).

• CONSULTANT: Dorsch Qatar.

• PM/CM: PARASONS

• SCOPE OF WORK:

Lusail Plaza Infrastructure, an execution Project Infra-structure, Under Pass Roads, Tunnel, Car park, Metro Station (LRT Station) and Landscape.

Responsibilities: Site supervision for concrete and steel works (Rah Foundations & walls), Execution of car park underground, tunnel concrete walls and slabs, road ramps, metro station structural wok and finishing fit-out execution of form works with DOKA, PERI and RMDK, also Rah

foundations with Qty. Min. 2000 cm3 per week, also following tests and civil work such as (Bore holes, water proofing spray membrane & PVC T- Lock, plate load tests), also with finishing activities after concrete pouring. Project was Under PMC (Parsons) and Supervision Consultant

(Dorsch Qatar),

Project budget: 1.3 billion Dollar $

• Responsible for construction of all di ff erent structure elements

• Construction of most of walls zone 4 up to 18m height casing one time with self-compacting concrete.

• Construction of all west ramps including geo technical works, blinding concrete, waterproofing, mass concrete., infill concrete

• Construction of main Rafts with thickness up to 3.5 meters.

• Construction of bridge and pergola slaps ( shoring sca ff olding

, steel, formworks )

• Responsible of all Utilities work ( storm water, potable water, Treated Sewage Effluent (TSE), Telecom, LV, ELV, )

• Responsible of all Substation 3 Structure & Utilities and Finishing works

• Company start new project high towers PB12 Plaza Towers Plot C I’m responsible for (piles, excavation, mass concrete, blinding, rafts and walls) . trimming old ramp with soil nail and shot Crete concrete

support

HELAL GROUP

CONSTRUCTION

Mansoura And New

Damietta

Oct 2015 - Jan 2017

Civil Site Engineer

• PROJECT: High buildings

• LOCATION: Mansoura and New Damie5a

• CONTRACTOR: Helal Group construction

The work was high building Piles on a machine implementation of the CFA and steel pile and isolated footing, combined footing, strap beam, shallow foundation and flat slab, solid slab, hollow block, columns, beam, and finishes and paint work and Plumbing and electrocution works and implementation of destinations and full implementation of insulation. Do all finishing work like installation of doors, windows, paint work, the installation of air-condition, floors insulation, lighting works, marble and do all work for decoration.

ORASCOM

CONSTRUCTION

New Damietta

Oct 2014 - Sep 2015

Civil Site Engineer

Substation project Do all Quantity Survey for concrete and steel

Work to compaction the soil every 20 cm and calculate the amount of water and soil tests Sand cone and soil as a result of receiving 95% of the Proctor

Then do Rah and test of concrete Do precast concrete beams Check all level by total station

The implementation of the columns and check steel

The implementation of flat slab thickness 25cm and hollow block And do Isolation for rah

EDUCATION

DELTA HIGHER

INSTITUTE FOR

ENGINEERING

&TECHNOLOGY

Mansoura

2014

Bachelor

Bachelor degree of science in civil engineering

Sept. 2009 – 2014

Short Courses

AUTOCAD ETABS

SAFE SAP

CSI COLUMN SCAFFOLDING, FIRST AID AND FIRE SAFETY

ENGLISH ARABIC



Contact this candidate