FARSHID TORABI MEHR
CV
FARSHID TORABI MEHR
* ******** ******** ****** *******/ Senior Tunnel Engineer 2 Name of Company
* **** ** ***** ******* Torabi-Mehr
* ********** ****** *******, Senior Tunnel & Geotechnical Engineer 5 Date of Birth 1981/12/02
6 Nationality Iranian
7 Contacts (Phone & WhatsApp) +98-918-***-**** & +98-912-***-**** 8 Educational Qualification: MSc in Petrology from Kharazmi University BSc in Geology from Bu Ali Sina University
9. Languages known:
Reading Writing Speaking
English Good Good Good
10. Employment Record (Work Experience): Total years of Experience: 20 Years (since Nov. 2000 up to now) Duration Name Of Employer Positions Held
5 years & 5 month (July 2015 – Present) General Mechanic Company
(Contractor)
Mechanized Tunnelling & TBM
Manager
7 years & 5 months (March 2008 – July
2015)
Tunnel Rah Company
(Contractor)
Senior Tunnel Engineer
1 year & 4 months (December 2006 –
March 2008)
Kanazin Consulting
Engineering Company
(KCECO)
(Consultant)
Manager of Angouran Underground
Mine & Tunnels Supervision Body
1 year & 1 month (November 2005 -
December 2006)
International Behkav-hamkar
Engineers Company (IBECO)
(Consultant)
Underground Mine & Tunnels Resident
Supervisor
1 year & 2 Months (October 2004 –
November 2005)
Tunnel Sazeh Company
(Contractor)
Superintendent of Azadi Dam Tunnels
4 years (November 2000 – October
2004)
Yekta Sanat Espadana
Company (YSECO)
(Contractor)
Underground Mine & Tunnels
Superintendent
Part time (At the same time with other
careers)
Independent Consultant Tunnel & Underground Excavations Independent Consultant
11. Membership of Engineering Professional Institutions / Societies: Member of the Board of Directors (Inspector) of Iranian Tunneling Association (IRTA) Official Expert of Justice (in Mines' field) (Iranian Association of Official Experts (IAOE) Member of Iranian Association of Rail Transport Engineering (IARTE) Member of Iranian Mining Engineering Organization (IMEO) 2 P a g e
FARSHID TORABI MEHR
CV
12. Publications:
Book (published):
- Editor of "Highway and Rail Transit Tunnel Inspection Manual" (Translated to Persian) Magazine (published):
- Executive Manager & Coordinator of Iranian Tunnelling Association (IRTA) Magazine Books (to be published):
- Assembly of Tehran Metro Line 7 (East-West Lot) EPB-TBM
- Assembly of Zagros Double Shield TBM
- Risk Catalogue for TBM operations
Publications in Refereed Conference Proceedings
- “Challenges of Underground Spaces Excavation in Urban Areas- Case Study: Some Challenges of Tehran Metro Line 7 East – West Section Tunnel Excavation with EPB-TBM,” 2013, Key Lecture in 10th Iranian Tunneling Conference, 4-7 Nov, Tehran, Iran.
- “Technical & Economic Evaluation of using Rolling Stock & Conveyor Belt Systems in Tehran Metro Line 7 – East Section,” Key Lecture in the First International & Iranian Conference on Conveyor Belt Systems,15& 16 Feb 2012, Tehran, Iran.
13. Work Experience:
1. Western Tehran Waste Water
Transmission Tunnel (General
Mechanic Co.)
Duration 5 years & 5 months (July 2015 – Present)
Location Tehran, Iran
Employing Firm General Mechanic Co.
Project Cost US$ 60 million
Client Tehran Sewerage Company
Main Project Features
Construction party of EPC contract with 12 Km long tunnel and being excavated by an EPB TBM. Using Special Precast Segments (Combisegments - HDPE Type II Herrenknecht formwork AG) made this project a unique project in the world. Position Held Mechanized Tunnelling & TBM Manager
Responsibilities performed
• Reporting to the project manager
• Excavation team leader in charge of scheduling, tasks, assignments, permissible orders, defining orders and in charge of overall performance of personnel
• Participate in strategic and management meetings of the project
• TBM inspection and maintenance supervising
• Calculating and assessing soil improvement parameters with regards to geotechnical conditions
2. Senior Tunnel Engineer
3 P a g e
FARSHID TORABI MEHR
CV
(Tunnel Rah Co.)
Duration 7 years & 5 months (March 2008 – July 2015) Location Tehran, Iran
Employing Firm Tunnel Rah Company
Project Cost Various
Client Various
Main Projects Features
Various Mechanized Tunnelling Projects which use Hard Rock & EPB TBM’s (Water Transmission & Metro Tunnels):
1. Tehran Metro Line 7 (E-W Section) = US$ 120 million 2. Karaj Water Transmission Tunnel (Section 1) = US$ 55 million 3. Karaj Water Transmission Tunnel (Section 2) = US$ 75 million 4. Zagros (Nosoud) Water Transmission Tunnel (Section 1-A) = US$ 85 million 5. Qom Metro Line A = US$ 700 million
6. Kani-Sib Water Transmission Tunnel (Section 1)
7. Kani-Sib Water Transmission Tunnel (Section 2)
8. Zagros (Nosoud) Transmission Tunnel (Section2)
9. Golab Transmission Tunnel (Section2)
10. Konjancham Water Transmission Tunnel
11. Choghakhor Water Transmission Tunnel
12. Tabriz Metro (Line 2)
13. Shiraz Metro (Line 2)
14. Mashhad Metro (Line2)
15. Abouzar Water Conveying Tunnel
Position Held Senior Tunnel Engineer
Responsibilities performed
Conduct ongoing site visits of Tunnel projects.
Participate in strategic and management meetings of the projects.
Provide reports to relevant authorities.
Performing site visit and compiling technical reports
Compiling technical & design reports
3. Manager of Angouran
Underground Mine & Tunnels
Supervision Body (KCECO)
Duration 1 year & 4 months (December 2006 – March 2008) Location Zanjan, Iran
Employing Firm Kanazin Consulting Engineering company (KCECO) Project Cost US$ 2 billion per year (Extraction & Selling Lead & Zinc Minerals) Client Iran Minerals Production and Supply Company (IMPASCO) Main Project Features
Angouran is the biggest Lead & Zinc mine in the Middle East. Position Held Manager of Angouran Underground Mine & Tunnels Supervision Body Responsibilities performed
Supervising the process of Tunneling & Underground Mining
Compiling technical & design reports
Leading the supervising & consulting team
4. Underground Mine & Tunnels
Resident Supervisor (IBECO)
4 P a g e
FARSHID TORABI MEHR
CV
Duration 1 year & 1 month (November 2005 - December 2006) Location Zanjan, Iran
Employing Firm International Behkav Hamkar Engineers company (IBECO) Project Cost US$ 2 billion per year (Extraction & Selling Lead & Zinc Minerals) Client Iran Minerals Production and Supply Company (IMPASCO) Main Project Features
Angouran is the biggest Lead & Zinc mine in the Middle East. Position Held Underground Mine & Tunnels Resident Supervisor Responsibilities performed
Supervising the process of tunneling & underground mining
Compiling technical & design reports
Compiling Geological Drawings and assessing Rock condition
Participation in technical meetings
5. Superintendent of Azadi Dam
Tunnels (Tunnel Sazeh Co.)
Duration 1 year & 2 months (October 2004 – November 2005) Location Kermanshah, Iran
Employing Firm Tunnel Sazeh Company
Project Cost US$ 300 million
Client Kermanshah Regional Water Authority
Azadi Dam is the biggest Dam in Kermanshah province in Iran. Position Held Superintendent of Azadi Dam Tunnels
Responsibilities performed
Assessing galleries drawings
Complaining work instructions
Leading Tunnel excavation team
6. Nilchian Underground Mine &
Tunnels Superintendent (YSECO)
Duration 4 years (November 2000 – October 2004)
Location Izeh, Iran
Employing Firm Yekta Sanat Spadana Co. (YSECO)
Project Cost US$ 130 million per year (Extraction & Selling Bauxite Mineral) Client Iran Minerals Production and Supply Company (IMPASCO) Main Project Features
Nilchian mine is the deepest underground mine in Iran. Position Held Underground Mine & Tunnels Superintendent Responsibilities performed
Underground Mine & Tunnels excavation leader
Minerals Excavation team leader and director
7. Tunnel & Underground Excavations
Independent Consultant
Duration Part time (At the same time with other activities) Location Iran
Employing Firm Various Companies
Position Held Tunnel & Underground Excavations Independent Consultant Responsibilities performed
Consulting services for various kinds of Tunnels and Underground Excavations