Appling for Electrical / QC Inspector

Objective Summary: To be given the opportunity to work with other professionals within this field by obtaining the position of Electrical Inspector.

CORE COMPETENCIES:

More than 7 years of experience as Quality Control Inspector and Electrical Inspector in Construction (Railway, Oil & Gas, Industrial & Infrastructure sectors) and Manufacturing.

Remarkable experience in inspecting electrical distribution and plant electrical systems

Sound knowledge of electrical wiring diagrams

Profound knowledge to troubleshooting and repair of electrical systems

Ability to understand schematics and other technical manuals

Ability to multitask and prioritize the work to meet the deadlines

Ability to inspect and repair the 480 volts above electrical systems

Proficient in using Microsoft Office and Navis work (BIM)

Academic Qualifications:

Softnet College of Science & Technology Diploma in Computer Technician

Ibayo Balanga City, Bataan Philippines (School Year 2001 to 2003)

WORK EXPERIENCE:

Project Name: Route 2020 Metro Redline Extension

Company: Sener Engineering

Under: Parsons Systra Joint Venture

Location: Dubai

From: October 31, 2017 to April 15 2020

Position: Electrical Inspector

Scope of Work: Mechanical, Electrical, and Plumbing (MEP)

Witness the Testing & Commissioning of MDB, Primary Cabinet, SMDB, DB’s, FM200 system.

Inspection of Electrical Services like Earthing System, Lighting & Small power, LV System, ECS & TVS, Fire Alarms & Communications systems ensuring the works done by contractor is as per approved shop drawing, method statements, project specification and code & standards.

Conduct material inspection to ensure that the material delivered at site conforms to approve Material Submittal.

Preparation of Safety Observation Report, Daily Progress & Monthly Report and other documents as required by immediate supervisor

Preparing Daily Report, Monthly Report, Safety Observation Report, and Material & Installation Inspection Log for record purposes.

Monitor contractor’s works progress and conduct regular site inspection to ensure the project specification and other contract documents are followed.

Maintain Site Photographic Progress Record for record purposes.

Report to Site Engineers and Senior Engineers any Non-Conformance found at site for documentation & issuance to contractor for corrective action.

Company: DANWAY EME LLC

Location: Dubai

From: May 2013 to September 2017

Position: QA/QC Inspector for Electrical & instrumentation

Prepare Quality Plan, Method Statement and Inspection and Test Plan as per project scope.

Identify and coordinate quality problems (NCRs, snags, customer complaints, etc.) to concern Project Manager/Divisional Manager, issued by clients, and ensures that the corrective action are implemented and close-out.

Perform site inspection and issue NCR or snag list for any non-compliance on site.

Schedule inspection to client and consultant via issuance of request for inspection (RFI) form as per approved ITP.

Perform material inspection as per approved material submittals and delivery notes.

Coordinate and witness Site Acceptance Test with consultant as per approved SAT procedure.

Attend weekly coordination meetings with client and consultant to discuss quality related issues and inspection status.

Lead testing team on their daily activities.

Perform construction completion walk down with consultant prior to handover to client.

Coordinate to construction team and reports to consultant the status of each deficiency listed by consultant during construction completion walk down.

Witness pre-commission and commissioning activities done by in-house or third-party commissioning groups.

Prepare submittals and maintain document submittal log and RFI log.

Prepare Handover Dossier or History Docket and Operation and Maintenance Manual as per approved index.

PROJECTS HANDLED

Project Name: South Airfield Development & Rehabilitation

Construction Package1 (Midfield Airside Road Tunnel Construction Phase-2)

Under: LANE-DS-NC Consortium

Location: Abu Dhabi Airport, Abu Dhabi

From: November 21, 2016 up to Sep. 1, 2017

Position: QA/QC Inspector

Scope of Work: Mechanical, Electrical, and Plumbing (MEP)

Installation of Control Panels, 22KV MV Switchgears and LV Main Distribution Boards, 2000KVA Dry Type Transformer Installation and Testing, Motor Installation and Testing, Instruments (sensors and gauges) Installation, Cable raceways, LV and Signal Cables Installation and Testing, Installation and Commissioning of Lighting and Small Power System, Installation of Sprinkler pipes, heads, wet riser pipe fire hose cabinet, conduct testing with 3rd party inspector, installation of fire suppression and detection system, HVAC duct installation HRV, VCD, Fire dumper etc..

Project Name: EPCL/NI/3345 Electrical & Instrumentation Works for Multiple Projects

Under: Emirates Processing Company LLC

Location: Jebel Ali, Jafza Dubai, U.A.E

From: January 24, 2016 to November 20, 2016

Position: QA/QC Inspector

Scope of Work: Shutdown & Upgrades, Electrical and Instrumentation Works for Multiple Projects

Shutdown and Upgrades for Engineering system requirement, upgrades for Mass flow Meter,

HRSG/BMS, NHTU Recycle Compressor VFD, Upgrading of HP Boiler Desuperheater, Waste Heat recovery, Relocation of Control Panel, installation of Sample unit, conduct testing, leak test, Loop Checking and Pre Commissioning, etc.

Project Name: Jebel Ali, TERMINAL 4 Phase 1

Under: BAM International

Location: DP World Jebel Ali, Jafza Dubai, U.A.E

From: February 4, 2016 to November 20, 2016

Position: QA/QC Inspector

Scope of Work: Bridge Lighting and Small Power and Bridge Lightning Protection system

Installation of Distribution Board, 12M Street Light Pole, LED Light Fitting, Fluorescent Emergency Luminaire. Lighting Switch & Switch Socket, Junction Box, LV Power & Earthing Cables, Cable Termination Accessories, Earthing and Lightning Protection.

Project Name: Fire Protection System Upgrade Bullet & Truck Loading Area

Under: Cylingas Company Llc

Location: DUGAS Jebel Ali, Jafza Dubai, U.A.E

From: February 7, 2016 to October 11, 2016

Position: QA/QC Inspector

Scope of Work: Fire Protection System Upgrade Bullet & Truck Loading Area

Installation of LV & Instrument Cables, Cable Glanding and Termination, Installation Explosion Proof Junction Box / Pushbutton Station (Inside Control Room), Cable pulling, Warning Tape and Cable Tiles Installation on cable Trenches, Installation of Pressure Gauges, and Testing.

Project Name: Island 2 infrastructure works dpdp-pr-5005 Fire and irrigation pumping Station

Under: Dutco Balfour Beatty

Location: Daria Island Dubai, U.A.E

From: 16-Oct-2015 to 05-Feb.2016

Position: QA/QC Inspector

Scope of Work: Mechanical, Electrical and Plumbing Works (MEP)

Compose of 4 Network system Strom Water network, sewerage network, Irrigation network and firefighting system GRP, HDPE and uPVC pipe installation in connection to the Dubai municipal existing line. Installation of all kinds of Motor and Pumps. Electrical equipment installation like SMDB, Capacitor bank, Scada and Ups system and Fm200 control panel for firefighting etc.

Project Name: Dubai Tram (TIS – Transportation Information System)

Under: Alstom Transport

Location: Al Sofuoh, Dubai, U.A.E

From: June 5, 2014 to august 15, 2015

Position: QA/QC Inspector

Scope of Work: Electrical and Instrumentation Works

Installation of Control and Communication Panels; Installation of track devices (Traffic Lights, Point Indicators, Point Machines, Eurobalise, AVLS, Axle Counter, Priority and Request Loops, CCTV Cameras and trackside DCS (Data Communication System) antennas and cabinets); Installation of station devices (indoor and outdoor camera, Video Broadcast System (VBS), Passenger Information Display (PID), Intercoms, Digital Clocks, Speakers and DCS units); Fiber optic cable installation and testing for mainline and depot BTN (Backbone Transmission Network) system; Command, Information and Power cable installation and testing for track and station devices.

Project Name: Anode Rodding Shop & Green Anode Plant

Under: Autotec GmbH

Location: Emirates Global Aluminum Al Taweelah, Abu Dhabi, U.A.E

From: May 5, 2013 to May 4, 2014

Position: QA/QC assistant

Scope of Work: Electrical and Instrumentation Works

Installation of Control Panels, LV Switchgears and Sub Distribution Boards, MV Transformer Installation and Testing, Motor Installation and Testing, Instruments (sensors and gauges) Installation, Cable raceways, LV and Signal Cables Installation and Testing, Installation and Commissioning of Lighting and Small Power System.

Character Reference:

Mr. Mario Nieves

Senior Project Manager

*****.*****@*****.**

Sener Engineering

+971 (0-55-611-****

Ms. Whylyn P. Valera

QA/QC Engineer

******.******@*******.***

Parsons Engineering

+971-**-***-****