CURRICULUM VITAE (Construction Site Manager)
N a m e
:
FADIAN (passport Name: FADIAN UDIN WAHID)
Date of Birth
:
July 26, 1976
Nationality
:
Indonesia
Current Location
:
Jakarta, Indonesia
Gender
:
Male
Marital Status
:
Married with 2 children
Address
:
Green Beringin Residence Emerald No 5 Jl Lingkar Selatan, Ciracas, Serang, Banten – 42100
:
***********@*****.***
Mobile Phone
:
+62-813-****-**** or +62-813-****-****
Passport no
:
C-5463929 valid until 27 Nov 2024
Education
:
Bachelor Degree Civil Engineering from Gajah Mada University in 2001
SYNOPSIS
-As Construction/Execution Manager with over 15 years working experience for Managing Construction of Offshore and Onshore facilities for overseeing and developing construction activities/constructability review, methodologies aligned with current construction requirement from safety, quality, schedule and cost. Involve in FEED preparation for green-field and brown-field development facilities and determined requirement for EPC contract execution. In charge for Yard Construction Management with direct manpower supervision > 5000 for running Onshore fabrication of Offshore Platform in the same time.
-As Construction Execution Engineer with over 15 years working experience for Offshore and Onshore facilities for overseeing and developing construction methodologies, construction activities including welding design and requirement aligned with current construction requirement from safety, quality, schedule and cost. Involve in FEED preparation for green-field and brown-field development facilities and determined requirement for EPC contract execution.
-
Work History:
1.Senior Civil Structure Engineer and Construction Lead, 04/2018 – Now
ExxonMobil - Indonesia (Project: Banyu Urip Central Production Operation and Maintenance)
Overseeing Detail engineering team for Offshore/Onshore for Structure modification and upgrading of existing facilities including new facilities to support Operation and Maintenance. Overseeing construction activities related to Developing engineering/construction plan to ensure plant development is meet with Quality, Safety and Budget including monitoring contract for maintenance of Banyu Urip Plant with Responsibility:
Overseeing design engineering contractor for delivering sufficient deliverable list (design report and drawings) as per construction and operation requirement including welding design and execution (selection WPS and welding parameters)
Overseeing construction activities at Onshore and Offshore facilities (jacket, topside, mooring tower and FSO) related to modification, maintenance and upgrading facilities
Develop with other disciplines to prepare FEED document for future plant Upgrade by providing data/input from Civil/Structural point of view for minimum requirement i.e deliverables and work volume, schedule, constructability and cost estimation
Developing concept for plant modification and upgrading including repairing all facilities
Monitoring contract implementation related to Operation and Maintenance program
Pro-active in detail engineering and overseeing construction for brownfield project. Involve more than 10 brownfield project onshore and offshore facilities.
2.Construction Engineer, 04/2017 – 03/2018
Medco-Energi - Indonesia (Project: MedcoEnergi - Block A Gas Development)
Overseeing Site Engineering and Construction team especially for Civil and Structure Discipline to ensure handover date is meet with active involvement with Contractor team in contributing providing input and advice during coordination meeting and site execution. Ensure construction sequence for Civil/Structure discipline was following Commissioning requirement with Responsibility:
Overseeing Construction activities at Site to ensure quality, safety and schedule meet the requirement
Monitoring documentation submission from engineering and construction team to support construction activities
Developing construction sequence following Commissioning plan requirement
Reviewing Developing concept for plant modification and upgrading including repairing all facilities
Monitoring contract implementation to ensure final product meet Operation and Maintenance requirement
3.Project Engineer, 06/2016 – 03/2017
Saipem SA - Indonesia (Project: Total SA - FPSO Norte/Sul Kaombo and ENI - FPU Jangkrik)
Overseeing Site Engineering and Construction team to ensure target from Site Project Management is meet from Schedule and Budget for FPSO/FPU Module Fabrication with Responsibility:
Overseeing Construction activities for FPSO modules and integration including documentation submission activities at Site to ensure PMT target is achieve
Developing construction sequence following Commissioning plan requirement by providing 3D model selection for easy reference to construction and engineering team
Developing monitoring manpower allocation and material availability including status pre-commissioning status for Structure, Piping and Mechanical disciplines
4.Offshore Structure Engineer and Construction Engineer, 12/2012 – 05/2015
ExxonMobil - Indonesia (Project: Banyu Urip EPC 3 and 4 for Mooring Tower, Offshore Pipeline and FSO Integration)
Overseeing Detail Engineering team (including Sub Contractor) for deliverable submission and reviewing including providing input/advise during detail engineering stage to ensure Operation Requirement is meet. Overseeing Construction Engineering team, Construction team and Installation during preparation until execution including preparing interface matrix to ensure split scope between entities is described with Responsibility:
Involve in FEED stages of the project by providing input/data for further EPC contract stages requirement by collaboration with other discipline (mechanical, electrical, instrumentation etc) for minimum requirement for proving deliverables (drawing, specification, design report), schedule, work volume, constructability and cost estimation for material, construction, installation. Involve in FEED – Banyu Urip Offshore Project Scope of work (offshore pipeline, Mooring Tower and FSO).
Overseeing detail engineering deliverables for design report and drawings of Mooring Tower (Jacket and Topside), Offshore Pipeline and FSO for in-service and pre-service condition (including In-place Analysis, Seismic Analysis, Lifting Analysis, Load-out/Transportation Analysis, Fatigue Analysis, Mechanical Handling Report) for Jacket, Topside, Yoke and Mooring Support Structure including Offshore Pipeline and Integration with FSO
Overseeing construction engineering deliverables for construction procedure and drawings including method statement, lifting procedure, welding procedure, welding sequences, load-out procedure
Overseeing Transportation/Installation engineering team for issuing deliverables for design report and drawings related to installation activities (sea-fastening/grillage design, ballast calculation, transportation analysis) for Jacket, Topside, Yoke and Mooring Support Structure modules
Supervision for Construction and Installation activities for Mooring Tower (Jacket, Topside, Yoke module), FSO, Offshore pipeline and Installation and Integration between Mooring Tower and FSO
Active in Interface engineering work with Contractor and Subcontractor with Interface Document control to ensure each entities closing all interface issue and provided interface document in-time
Providing input for yard construction activities during yard preparation until sail-away for equipment selection, yard layout, shop allocations etc
Developing construction methodologies during yard construction including for load-out and installation
Supporting in detail for final documentation as part of handover to Operation
5.Engineering Manager (Construction) and Interface Engineer, 10/2008 – 11/2012
Gunanusa Utama - Indonesia (Project: PTTEP – Bongkot, HESS – Ujung Pangkah, ONGC – ICPR Project, TOTAL – SN7 and PCK7B, TOTAL – Yadana Subsidence)
Overseeing Engineering team (Internal Engineering team including Sub Contractor), Construction Engineering team and Yard Construction Team for deliverable EPC contract covering Engineering, Construction activities by promoting Safety, Quality, Progress comply with Client requirement with Responsibility:
Involve in contractor FEED contract of the project by providing input/data for further EPC contract stages requirement by collaboration with other discipline (mechanical, electrical, instrumentation etc) for minimum requirement for proving deliverables (drawing, specification, design report), schedule, work volume, constructability and cost estimation for material, construction, installation. Involve for ENI – FPU Jangkrik FEED and PTTEP – Bongkot Project.
Overseeing detail engineering deliverables for design report and drawings of Wellhead Module, Compression Platform for in-service and pre-service condition (including In-place Analysis, Seismic Analysis, Lifting Analysis, Load-out/Transportation Analysis, Fatigue Analysis, Mechanical Handling Report) for Jacket, Topside including Pile design
Overseeing construction team for providing direction for construction requirement, procedure and drawings including construction sequences/priority, constructability review, method statement, lifting procedure, welding procedure, welding sequences, load-out procedure for Jacket and Topside modules including jetty capacity check
Overseeing Transportation/Installation engineering team for issuing deliverables for design report and drawings related to installation activities (sea-fastening/grillage design, ballast calculation, transportation analysis, barge strength check, stability analysis, up-ending analysis) for Jacket and Topside
Supervision for Construction and Installation activities for Site Construction activities and providing input for efficient and effective collaboration at Yard Fabrication for all project running in the same time including equipment, layout, workshop allocation planning, material allocations for Jacket, Topside and Modules
Providing input for yard construction activities during yard preparation until sail-away for equipment selection, yard layout, shop allocations etc
Lead Interface engineer group and discuss with other entities for developing Interface document control and finalized all issues for brownfield and greenfield project
Monitoring interface register
Develop fresh engineer to promote become senior engineer with providing training or assignment for improvement
Supporting in detail for final documentation as part of handover to Operation
Support bidding team in all stage including FEED and tender stages by providing input related to expertise in Civil/Structure discipline including construction expertise
6.Lead Structure Engineer and Method Engineer, 03/2002 – 09/2008
Gunanusa Utama - Indonesia (Project: BP – Tangguh Phase -1, TOTAL – TNOWT, TOTAL – Peciko 4, TOTAL – Tunu 8, ALSTOM – HRSG Project)
Lead Detail Engineering team (Internal Engineering team including Sub Contractor) and Construction Engineering team for deliverable submission and reviewing including providing input/advise during detail engineering stage including deliverables construction engineering team to support PMT requirement including construction site team with Responsibility:
Developing detail engineering deliverables for design report and drawings of Wellhead Module, Compression Platform for in-service and pre-service condition (including In-place Analysis, Seismic Analysis, Lifting Analysis, Load-out/Transportation Analysis, Fatigue Analysis, Mechanical Handling Report) for Jacket, Topside including Pile design
Developing construction engineering deliverables (fabrication methodologies, project execution procedures, lifting procedures, load-out procedures, welding procedures and sequences, yard layout including drawings)
Developing installation deliverables (installation report, transportation analysis, stability analysis, ballasting calculation, mooring design)
Support construction team for modification by providing sketch and back up calculation
Training:
Design and Construction of Offshore Structure by UNI Stategic 13th – 15th June 2011
Contract Administration Courses by Dr. Syed Alwee Alsagaff on April 25, 2009
T-Bosiet Opito Training by Samson Tiara 10th – 12th Dec 2018 and valid up to 2021
Eight Golden Rules, Lifting, Management of Change, Advances Safety Audit, GHSER by BP Tangguh on September 2005
Safety Awareness Training by BP on 7th – 8th July 2005
Survival Craft and Rescue Boat Training by Bina Patria on April 19th -21st 2004
Incident Investigation and Identification and Risk Assessment Training by Marine & Offshore Group on 16th September 2003
H2S Level-2 Training in April 2018
Software used:
Structural design: SACS 5.2/5.3, SAP2000, STAAD-Pro
Design drawing: AUTOCAD
Microsoft Office including Power-point presentation