Post Job Free

Resume

Sign in

Engineer Maintenance

Location:
Jagtial, Telangana, India
Salary:
45000
Posted:
November 05, 2020

Contact this candidate

Resume:

P.SUDESHRAJ

VilagePost-Elur,Namakkal(T.K)NamakkalDist.TamilNadu–637018

Contact:+919*********-;Email:adhj9d@r.postjobfree.com

INSTRUMENTATIONENGINEER

Seekingchalengingassignmentswithanorganizationofreputeacrosstheindustry SUMMARYOFSKILLS

● Competentanddiligentprofessionalwithanexperienceofover5yearsinProject Management,shutdownwork,maintenanceandCommissioning.

● ProficiencyinworkPlanning,Scheduling,ErectionandexecutionofProjectswithout incidencesoftime/costoverruns.

● Thriveinadeadlineintensiveenvironment,multi-task,perform underpressureandmeet deadlines.Abilitytousesoundjudgment&decision-makingskilsandeffectivelyperformina self-directedenvironment.

CoreCompetencies

●Troubleshooting●Planning&Scheduling●SiteManagement●TechnicalSupport●Safety Management

SKILLSET

CompletedSPICEcertificationinYOKOGAWA,Bangalore

SPICEwhichconsistofPLC,DCS,SCADAandFieldinstruments. DCS(DistributedControlSystem)

CentumCS-3000

PLC(ProgrammableLogicControler)

Prosafe-RS

SCADA

STARDOMandFAST/TOOLS.

FieldInstruments

Pressure,Temperature,Flow,Level,CalibrationandSimulationwithHART communicator.

PROFESSIONALEXPERIENCE

SENSITIVEENTERPRISES(TECHNIPFMC).

ProjectName:RevampofFCC-NHT,CCRandNHTPlantinHPCLVIzag.

Duration:07.09.2019totilnow.

Position:CommissioningEngineer(Instrumentation).

Activity:CommissioningoftheProcessVariableInstruments.

Instalation,calibrationandloopcheckingofthefieldinstruments.

Designing,ImplementingandCommissioningofnewcontrolloopsaspersite requirements.

Reviewofcontrolphilosophy,P&Idiagrams,cause&effectdiagrams,instrumentslist andflowChart.

TechnicalSupportforInstrumentationProjectClientteamandEPCteam.

CoordinationwithvariousequipmentvendorsforMODBUSCommunicationwithDCS. HYPERIONIT(CPCL).

ProjectName:MaintenanceofDHDT,ISOM&NewHGUPlants.

Duration:07.07.2018to30.05.2019

Position:InstrumentationSupervisor.

Activity:ErectionofImpulseLineaspermaintenanceEngineerInstructions

PeriodicalymaintaninginstrumentsandJB’s

CalibratingandZerocheckingthetransmittersandControlvalve.

PreparingmasterdataforPMcheck.

Responsibilitesofreceivingthematerialsandinstalationinfield. ABAHSAINCONSOLIDATEDCO.LTD.

● ProjectName:Constructionof115KV/13.8KVGISSubstationAbqaiq#3.

● Duration:10.01.2016to5.04.2018(2Yearand3months)

● Position:Engineer(Instrument&communication)

● Activity:ProjectExecution–115/13.8KVGISSubstation.

● ResponsibleforMaterialrequisitionandinstalationofcabletray,PVCcoatedRGS conduit,JunctionBox,cablepulingandtestingofcables.

● Colaborating with the team members and seniormanagementto maintain a continuousstreamofinformationregardingtheprojectstatusandprogress.

● DonePreinstalation&Postinstalationtest(OTDR)forsinglemodeandMultimode CablesOpticalFiberGround(OPGW)wireandNMFOC.

● DonePowermetertestforOPGWandNMFOC.

● Responsibleforinstalationofwalmountedpatchpanel.

● InstalationofSASconsole,GPSantennaforcommunication.

● Responsibleforinstalationofpatchcordsfrom LCC panelto WMPP,13.8KV switchgeartoWMPPandWMPPtoSASPanels.

● Instalationoftwowaysandfourwayjointbox(OPGW–OPGW,OPGW–NMFOC)as perIFCdrawings.

● EndtoEndtestfromABQAIQ#3toABQAIQBSP.

● ProjectName:ConstructionofCo-GenPlantinSaudiAramco.

● Duration:10.01.2016to05.04.2018(2yearsand4months)

● Position:Engineer(Instrumentation)

● Activity:ProjectExecution

● Instalation,calibrationandloopcheckingofthefieldinstruments.

● CompleteinstrumentInstalation&commissioningofnewcogenerationunit.

● Designing,ImplementingandCommissioningofnewcontrolloopsaspersite requirements.

● Reviewofcontrolphilosophy,P&Idiagrams,cause&effectdiagrams,instrumentslist andflowChart.

● AdeptinhandlingofProjects&Maintenance

● PreparingmasterdatasheetforPMschedule.

● TechnicalSupportfortheinstrumentationteam.

● Experiencedinthefieldinstrumentsandcontrolsystemsprocurementactivities

● Sparesbalanceinvestigationandinventorycontrolforalinstruments’spareparts

● Excelentcommunicationinterpersonalskils.

CHENNAIPETROLEUMCORPORATIONLIMITED(CPCL,Chennai).

● Maintenance&ShutdownWork.

● Duration:September2014toOctober2015.

● Position:Technician(Instrument)

● Activity:CalibratingandZerocheckingthetransmittersandControlvalve.

● Checkingtheindicatingsensorsincontrolvalve,preventivemaintenanceforJB.

● Pulingandterminatingthecables.

● Responsibilitesofreceivingthematerialsandinstalationinfield. EDUCATIONALCREDENTIALS

B.E.(Electronics&InstrumentationEngineering),2013

AdhiyamaanColegeofEngineering,Hosur.

Diploma(InstrumentationandControlEngineering),2010 TheSalemPolytechnicColege,Salem.

Matriculation,2007

GokulanathaHinduMahajanaHigherSecondarySchool,Salem. ComputerProficiency

MSOffice,MSDOS,Windows9X,2000,XPandInternetApplications ExtraCurricularAccolades:DistinctionofbeinganactiveVolunteerofNSS. DateofBirth:23DEC1991

Hobbies:ListeningtoMusicandPlayingCricket

PassportNumber:L8517720

LanguagesKnown:English,HindiandTamil

DECLARATION:

Iherebydeclarethataltheinformationmentionedaboveistruetomy knowledgeandIbeartheresponsibilityfortheabovementionedparticulars. Place:INDIA

YoursTruly

Date: (P.SUDESHRAJ)



Contact this candidate