Post Job Free

Resume

Sign in

Engineer Data

Location:
Fereej Ibn Dirhem, Qatar
Salary:
12000
Posted:
November 05, 2020

Contact this candidate

Resume:

IJAZ HUSSAIN

009**********

009********** adhj7q@r.postjobfree.com / adhj7q@r.postjobfree.com

POSITION

:

Land Surveyor

TOTAL YEARS OF EXPERIENCE: 20

MARITAL STATUS

:

Married

YEAR OF BIRTH

:

1979

NATIONALITY

:

Pakistani

Visa status NOC is available + transfer visa

KEY QUALIFICATION:

A professional career in competitive environment that demands excellence in performance and provide opportunities to attune professional growth based on the individual s merit. Performance and capabilities. Having more than 20 years of diversified experience in the field of construction in various Plants such as petrochemical, oil & gas, residential buildings, Roads, bridges, culverts, Sub stations, pumping station for potable and irrigation sewerage, storm water, pipe lines Infrastructure in different places of Qatar, UAE, and Pakistan.

Gulf experience 11 year with Contractor Company

Gulf experience 5 year with supervision DORSCH QATAR Consultant Company

Lusail Development project in Qatar

Preliminary survey to collect details from site and preparation of new design.

Initial setting out horizontal alignment & establishing of benchmark & control point.

Prepare relocation, verification, accomplishment, and survey findings reports.

Complete all information such as field books, sketch sand calculation for future reference.

Review and approval of the contractors proposed setting out calculation and details

RFI respond on time to contractors Utilize modern survey instruments

AutoCAD survey data convert on cad & excel file and plotting on cad

INSTRUMENTS USED:

Leica total station (TS 6,TS12,TS15) Sokia total station (510,610,2120,)

All type of level and theodolite

Auto cad related survey have experience

Import survey data from survey instruments

Convert all file plating on cad file

Topographic survey the area starting the project

Provided the survey data to design section

Project : Construction of Mozoon Towers Dafna,Qatar

July 2019 to till date

Company . Ramco industries

Project Mozoon Tower at west Bay

Position Sr surveyor

Responsibilities;

Taking the all civil works as built for all tower

Advise to surveyor how to take as built data for design of steel structures & cladding

All data file from survey instrument plat on orientation drawing and coordinate with design section

Checking the all data and compare the MEP works for all MEP openings which or done in towers and calculation of elevation for shop drawing .

Collect the data from drawing and covert for total station works SDR file,CSV file for setting out .and mark the location of connection steel beam

Project Lusail plaza,LRT station public car park,Landscaping

Company QD-SBG construction Qatar

Duration April 2017 to 15 May 2019

Position Sr land surveyor

Responsibilities

Checking and setting out civil and structure works.

Daily monitoring the devices settlement point and submitted the

Survey reports submitted to consultants.

Provided the data to design section.

Coordinate with consultant and done survey inspection.

Shifting the control points from Qatar national datum.

Topographic survey the all site and updating the excavation

Works and control the formation levels.

Daily updating survey reports to survey Manager Update the Project.

Marking the roads center line and curb stone and calculate

The FRL of road and cross check with design levels.

Project CP 06C utilities structure, irrigation,strom water Q tell, building,& pump station

Company Dorsch Qatar GMBH supervision consultant

Duration Sep2012 to 2017

Position Survey inspector

Responsibilities:

Establishing a primary horizontal and vertical control points including reference ties for re- establishing the points in the field.

Performing survey work under the direction and guidance of the Resident Engineer/Assistant Resident Engineer.

Supervising survey party staff.

Recording all measurements, rod/staff readings and calculations neatly and accurately in field books as the work progresses.

Coordinating with the Contractor’s surveyor on work priorities and schedules.

Checking all work by completing traverse closures and benchmarks circuits.

Reporting discrepancies or technical problems to the Assistant Resident Engineer.

Performing joint measurements of the completed work for payment.

Checking completed work for conformance to the line and grade required by the project plans in coordination with the Inspector assigned to the item of work.

Performing regular checks of the Contractor’s setting out to verify proper execution and accuracy.

Maintaining equipment in proper condition and perform frequent calibration checks

Checking site work daily setting out, levels, for all kind of excavation work

Shifting control points .fixing plot limits, checking existing cable works

Road crossings .review shop drawings collect the data at site for design

Topographic survey, making site daily reports to inform the seniors

Roads marking checked roads FRL fixing kerb stone marking alignment

Drainage systems manholes levels verge levels walk ways

Project Design and built 66kv substation and cable laying and roads works

Company Dorsch Qatar GHMB supervision consultant Qatar

Duration 2015 to 2017

Position Survey inspector

Responsibilities:

Checking the setting out for landscaping hard & soft area

Checking kerbstone top level & pavement,walkways,stone pitching

Checking top level of roads cutting and filling.

Checking the setting out horizontal curve in roads

Checking super elevation FRL for roads.

Checking the top level of roads longitudinal & cross sectional slop

Slop for roads and vertical curve.

Preliminary survey to collect details for new design.

Initial setting horizontal alignment & establishing of bench marks control point for the project

Checked the excavation work at site daily update on drawings.

Site and maintain the survey daily report to inform the senior SRE and engineers.

Project Shah Gas Development project main control building & roads (oil & Gas)

Company Shara al emirate contracting company UAE

Duration May 2010 to July 2012

Position Chief Surveyor

Responsibilities:

Checking the all buildings settings grids line & base points.

Checking wall alignment and columns levels.

Checking all building foundation raft slab locations as per drawing.

Setting out roads works centerline marking culverts marking

Marking for curb stone maintain the RFL slops for drainage

Setting out for roads horizontal and vertical curve.

Marking the level for cutting and filling for road levels

Checking the road levels layers by layers control the Asphalt level.

Checking the setting out drawing and provided data to surveyor

Inspection the survey works with consultant

Monthly survey reports submitted to construction manager

Coordination with site engineers and site supervision team

Established the control points for buildings and roads

Topographic survey all area prior to starting excavation works

As built data provided to design team

Project 132kv substation DEWA project

Company Sands contracting company UAE

Duration 2006 to 2008

Position Sr Project surveyor

Responsibilities

Checking the shop drawing and IFC levels and co ordinates data

Preparation the survey data for setting out buildings,columns,wall

Inspected the works with consultant and submitted the survey reports

Established project control points shifting from GIS

Setting out raft,columns,wall, openings,

Project Gardion Flat Glass factory UAE (R.A.K)

Zamil steel Factory UAE (R.A.K)

LPG gas plant extension works ( R.A.K) oil &gas

Company Sands contraction company UAE

Duration 2008 to March 2010

Position site surveyor

Responsibilities

Setting out wall columns,raft and alignment

Setting out for all excavation works and marking reference points

Checking formworks alignment and approval from consultant

Submitted the as built data after concrete

Shifting the control points for horizontal and vertical alignments

Setting out for all kinds of mechanical equipment in factory

Setting out the plot boundaries of the projects

Daily checked the excavation level for control over cutting

Supervision and coordinate with site construction team

Project Sewer pipe lines in al Qasis and irrigation line and pump station

Dubai mall tower 40 floor buildings

Company CCIC consolidated contractor international company UAE

Duration july2003 to March 2006

Position Highway Surveyor

Responsibilities

Setting out pipe centre line & lay out for trenchs

Give the top level of pipe beddings levels

Checking top level and alignment of pipe

Checking the main line and house connections slop

Buildings lay out and raft columns wall

Project Kohat tunnel and 32 km access road projects

Company saita Pakistan construction company pvt

Duration 2000 to March 2003

Position surveyor

Responsibilities’

Setting out for centerline of tunnel

Setting out for bridge abutment wall,retraning wall,

Marking for slab opening cable networks

Marking of piers truism columns alignments

Checking traverse points according to drawing

Monitoring the weekly basics of centerline tunnel

Making the data and assist the supervision team for excavation

Qualification

SSC certificate 1995 Intermediate board Sarghodha (2nd Division )

Diploma in civil 1998 Technical board Minerals department of industries (1st Division)

HSSC 2000 Intermediate & secondary Education Sarghodha (2nd Division)

Driving licence L/V Qatar, UAE

Language Urdu, English, Arabic



Contact this candidate