IJAZ HUSSAIN
009********** ************@*****.*** / ********@*****.***
POSITION
:
Land Surveyor
TOTAL YEARS OF EXPERIENCE: 20
MARITAL STATUS
:
Married
YEAR OF BIRTH
:
1979
NATIONALITY
:
Pakistani
Visa status NOC is available + transfer visa
KEY QUALIFICATION:
A professional career in competitive environment that demands excellence in performance and provide opportunities to attune professional growth based on the individual s merit. Performance and capabilities. Having more than 20 years of diversified experience in the field of construction in various Plants such as petrochemical, oil & gas, residential buildings, Roads, bridges, culverts, Sub stations, pumping station for potable and irrigation sewerage, storm water, pipe lines Infrastructure in different places of Qatar, UAE, and Pakistan.
Gulf experience 11 year with Contractor Company
Gulf experience 5 year with supervision DORSCH QATAR Consultant Company
Lusail Development project in Qatar
Preliminary survey to collect details from site and preparation of new design.
Initial setting out horizontal alignment & establishing of benchmark & control point.
Prepare relocation, verification, accomplishment, and survey findings reports.
Complete all information such as field books, sketch sand calculation for future reference.
Review and approval of the contractors proposed setting out calculation and details
RFI respond on time to contractors Utilize modern survey instruments
AutoCAD survey data convert on cad & excel file and plotting on cad
INSTRUMENTS USED:
Leica total station (TS 6,TS12,TS15) Sokia total station (510,610,2120,)
All type of level and theodolite
Auto cad related survey have experience
Import survey data from survey instruments
Convert all file plating on cad file
Topographic survey the area starting the project
Provided the survey data to design section
Project : Construction of Mozoon Towers Dafna,Qatar
July 2019 to till date
Company . Ramco industries
Project Mozoon Tower at west Bay
Position Sr surveyor
Responsibilities;
Taking the all civil works as built for all tower
Advise to surveyor how to take as built data for design of steel structures & cladding
All data file from survey instrument plat on orientation drawing and coordinate with design section
Checking the all data and compare the MEP works for all MEP openings which or done in towers and calculation of elevation for shop drawing .
Collect the data from drawing and covert for total station works SDR file,CSV file for setting out .and mark the location of connection steel beam
Project Lusail plaza,LRT station public car park,Landscaping
Company QD-SBG construction Qatar
Duration April 2017 to 15 May 2019
Position Sr land surveyor
Responsibilities
Checking and setting out civil and structure works.
Daily monitoring the devices settlement point and submitted the
Survey reports submitted to consultants.
Provided the data to design section.
Coordinate with consultant and done survey inspection.
Shifting the control points from Qatar national datum.
Topographic survey the all site and updating the excavation
Works and control the formation levels.
Daily updating survey reports to survey Manager Update the Project.
Marking the roads center line and curb stone and calculate
The FRL of road and cross check with design levels.
Project CP 06C utilities structure, irrigation,strom water Q tell, building,& pump station
Company Dorsch Qatar GMBH supervision consultant
Duration Sep2012 to 2017
Position Survey inspector
Responsibilities:
Establishing a primary horizontal and vertical control points including reference ties for re- establishing the points in the field.
Performing survey work under the direction and guidance of the Resident Engineer/Assistant Resident Engineer.
Supervising survey party staff.
Recording all measurements, rod/staff readings and calculations neatly and accurately in field books as the work progresses.
Coordinating with the Contractor’s surveyor on work priorities and schedules.
Checking all work by completing traverse closures and benchmarks circuits.
Reporting discrepancies or technical problems to the Assistant Resident Engineer.
Performing joint measurements of the completed work for payment.
Checking completed work for conformance to the line and grade required by the project plans in coordination with the Inspector assigned to the item of work.
Performing regular checks of the Contractor’s setting out to verify proper execution and accuracy.
Maintaining equipment in proper condition and perform frequent calibration checks
Checking site work daily setting out, levels, for all kind of excavation work
Shifting control points .fixing plot limits, checking existing cable works
Road crossings .review shop drawings collect the data at site for design
Topographic survey, making site daily reports to inform the seniors
Roads marking checked roads FRL fixing kerb stone marking alignment
Drainage systems manholes levels verge levels walk ways
Project Design and built 66kv substation and cable laying and roads works
Company Dorsch Qatar GHMB supervision consultant Qatar
Duration 2015 to 2017
Position Survey inspector
Responsibilities:
Checking the setting out for landscaping hard & soft area
Checking kerbstone top level & pavement,walkways,stone pitching
Checking top level of roads cutting and filling.
Checking the setting out horizontal curve in roads
Checking super elevation FRL for roads.
Checking the top level of roads longitudinal & cross sectional slop
Slop for roads and vertical curve.
Preliminary survey to collect details for new design.
Initial setting horizontal alignment & establishing of bench marks control point for the project
Checked the excavation work at site daily update on drawings.
Site and maintain the survey daily report to inform the senior SRE and engineers.
Project Shah Gas Development project main control building & roads (oil & Gas)
Company Shara al emirate contracting company UAE
Duration May 2010 to July 2012
Position Chief Surveyor
Responsibilities:
Checking the all buildings settings grids line & base points.
Checking wall alignment and columns levels.
Checking all building foundation raft slab locations as per drawing.
Setting out roads works centerline marking culverts marking
Marking for curb stone maintain the RFL slops for drainage
Setting out for roads horizontal and vertical curve.
Marking the level for cutting and filling for road levels
Checking the road levels layers by layers control the Asphalt level.
Checking the setting out drawing and provided data to surveyor
Inspection the survey works with consultant
Monthly survey reports submitted to construction manager
Coordination with site engineers and site supervision team
Established the control points for buildings and roads
Topographic survey all area prior to starting excavation works
As built data provided to design team
Project 132kv substation DEWA project
Company Sands contracting company UAE
Duration 2006 to 2008
Position Sr Project surveyor
Responsibilities
Checking the shop drawing and IFC levels and co ordinates data
Preparation the survey data for setting out buildings,columns,wall
Inspected the works with consultant and submitted the survey reports
Established project control points shifting from GIS
Setting out raft,columns,wall, openings,
Project Gardion Flat Glass factory UAE (R.A.K)
Zamil steel Factory UAE (R.A.K)
LPG gas plant extension works ( R.A.K) oil &gas
Company Sands contraction company UAE
Duration 2008 to March 2010
Position site surveyor
Responsibilities
Setting out wall columns,raft and alignment
Setting out for all excavation works and marking reference points
Checking formworks alignment and approval from consultant
Submitted the as built data after concrete
Shifting the control points for horizontal and vertical alignments
Setting out for all kinds of mechanical equipment in factory
Setting out the plot boundaries of the projects
Daily checked the excavation level for control over cutting
Supervision and coordinate with site construction team
Project Sewer pipe lines in al Qasis and irrigation line and pump station
Dubai mall tower 40 floor buildings
Company CCIC consolidated contractor international company UAE
Duration july2003 to March 2006
Position Highway Surveyor
Responsibilities
Setting out pipe centre line & lay out for trenchs
Give the top level of pipe beddings levels
Checking top level and alignment of pipe
Checking the main line and house connections slop
Buildings lay out and raft columns wall
Project Kohat tunnel and 32 km access road projects
Company saita Pakistan construction company pvt
Duration 2000 to March 2003
Position surveyor
Responsibilities’
Setting out for centerline of tunnel
Setting out for bridge abutment wall,retraning wall,
Marking for slab opening cable networks
Marking of piers truism columns alignments
Checking traverse points according to drawing
Monitoring the weekly basics of centerline tunnel
Making the data and assist the supervision team for excavation
Qualification
SSC certificate 1995 Intermediate board Sarghodha (2nd Division )
Diploma in civil 1998 Technical board Minerals department of industries (1st Division)
HSSC 2000 Intermediate & secondary Education Sarghodha (2nd Division)
Driving licence L/V Qatar, UAE
Language Urdu, English, Arabic