M S ILANCHEZIAN Mail: *************@*****.***
Mob: 861*******
Objective
To pursue a challenging career that would enable me to utilize my full potential in technical, research and problem solving skills and also to contribute for the growth of organization. Work Experience (3 Years)
As senior engineer in Frick India Limited, Faridabad from 07/07/2016 to 29/7/19 in engineering department (Design, Process & planning) Type of Projects Capacity & Type Type of Plant
M/S DSA cold storage,
Tamilnadu [2016]
5000MT storage plant Ammonia
Refrigeration
M/S Al-Faiz meat plant,
Gujarat [2016]
80MT meat plant. Ammonia
Refrigeration
M/S Grasim Industries, Aditya
Birla chemical plant, Orissa
[2016]
Chlorine Liquefaction plant (250TPD) Freon Refrigeration
(R-134a)
M/S Grasim Industries, Aditya
Birla chemical plant, Gujarat
[2017]
Chlorine Liquefaction plant (500TPD) Freon Refrigeration
(R-134a)
M/S Shriram vinyl & chemical
Industries, Rajasthan [2018]
Chlorine Liquefaction plant (300TPD) Freon Refrigeration
(R-22)
M/S United Phosphorous
Limited [2018]
300TR X 4 No.s Brine chiller plant Ammonia
Refrigeration
National Dairy Development
Board, Mohali [2018]
250TR Dairy Plant Ammonia
Refrigeration
Sree Rayalaseema Alkalies &
Allied Chemicals Ltd,
Kurnool [2018]
Chlorine Liquefaction plant (300TPD) Freon Refrigeration
(R-22)
M/S Greenstar Fertilizers,
Tuticorin [2018]
20000MT BOG Handling System Ammonia
Refrigeration
Extension orders:
Amritsar Dairy, Seasaga Enterprises, Vadilal Dairy, Iskon Balaji foods, Mindhola foods, Linde India ltd, Hatsun Dairy Redhills, Hatsun Dairy Salem, Mother Dairy Bangalore, Bangalore Milk Union Ltd, FNS agro foods Ltd, Pragathi Milk products Ltd, Monsoon Bounty, Allied Knowledge solutions, Mccain foods, Manorama Industries
Common task involved with these projects are,
Design check with actual
requirement
Design variation in case
of less capacity
Thermal design check
(By HTRI, if required)
Mechanical design check (By
PV elite, if required)
Procuring raw materials
(As per specifications)
Vetting detailed
engineering drawings
Sending drawings for client
approval
Revising drawings as
per client
Assisting Production
(As per QAP)
Assisting multistage inspection
(If required)
Final testing of
equipment (Assisting
production)
Design validation after
plant commissioning
Roles & Responsibilities
Design
Design & detailing of equipment considering all live loads including flow, pressure, temperature etc with environmental factors
Preparation of design data, design basis, & design calculations of projects
Preparation of QAP for quality control in manufacturing equipments.
Preparation of estimation / BOQ / Costing for bidding purpose of projects
Vetting general arrangement drawing of equipments & detail of process in coordination with mechanical, civil, electrical & instrumentation discipline. Process
Selection of rotating equipment.
Preparation of Piping & instrumentation diagram as per tender specifications & sending for approval (including line sizing, selection of valves & controls).
Preparation of Process flow diagram.
Planning
Scheduling equipment manufacturing using MS Project.
Forecasting material requirements based on the scope of work & estimating raw material quantities from drawing.
Generating material requisition with technical specifications in compliance with design basis & approved vendor list with follow up.
Preparing work orders for manufacturing items.
Documentation of project files as per ISO standard.
Co-ordinating with erection dept/client to study site issues, finding solution for the same. Academic Profile
Degree of Specialization Institute Percentage/
CGPA
Year Of
Passing
M.E [Thermal Engg with
spln in Ref & Air Cond]
Anna University, Chennai 7.42 2016
B.E [Mech Engg] Panimalar Engineering College 8.44 2013 H.S.C [State board] Vidhya Vikas Boys Higher
Secondary school
91.25 2009
S.S.C [Matriculation] Christ the King Matriculation Higher Secondary school
84.45 2007
Projects
M.E Thesis: “Development of PCM based heat exchanger for HVAC in car”
The objective of this project is to maintain the thermal comfort inside the cabin of a car by using PCM in the evaporator during car idle/stop time, using CFD simulation. B.E Project: “Experimental studies on effectiveness of service brake supported by EMR”
This project stresses for an effective analysis enabling design development of an upgraded model of a frictionless braking with the combined effect of electromagnetic energy on retarders
Internship Exposure
Internship at Brakes India Ltd, Chennai
Obtained exposure to electromagnetic retarder unit regarding its installation & maintenance work
Software Skills
HTRI PV Elite AutoCAD
MS project Pro/E Solid works
Microsoft office tools SAP
Personal Skills
Quick learner and adaptive to challenging situations
Persistent to learn new things
Persevering attitude until required task is done Personal Profile
Name
: M S Ilanchezian
Father’s Name : M Selvakumar
Date of birth : 20.06.1992
Gender : Male
Languages known : Tamil, English, Hindi
Permanent Address : 195, Ullur, Kumbakonam – 612001 I hereby declare that the above written particulars are true to the best of my knowledge and belief. Place: Kumbakonam
Date : 09.09.2019 (M.S.ILANCHEZIAN)