Wilfred T. Reyes

Civil Engineer

Email Address: adhght@r.postjobfree.com

Contact No.: +971*********

EDUCATION: YEARS OF EXPERIENCE: 12

Bachelor of Science in Civil Engineering

Polytechnic University of the Philippines NATIONALITY: Filipino PROFESSIONAL QUALIFICATION: LANGUAGE: English and Filipino ADM Registered - Engineers Interim

UAE Equivalency Certificate – Civil Engineer GEOGRAPHICAL EXPERIENCE: PRC Philippines – Registered Civil Engineer United Arab Emirates, Qatar and Philippines PROFESSIONAL MEMBERSHIP: CONTINOUS PROFESSIONAL DEVELOPMENTS/ TRAININGS: Society of Engineers - UAE, Structural Analysis & Design Engineering Software (STAAD Pro) SOE UAE – Affiliated Member Proficiency & Ingenuity of Civil Engineers Write Shop: ASEAN & APEC Engineering Registries

Philippine Institute of Civil Engineers, ISO 9001:2015 Awareness Training & Workshop in QMS Audit PICE-UAE Chapter- Regular Member ETABS & SAFE Training Course CORE COMPETENCIES: VISA STATUS: Employment Visa

Knowledge in AutoCAD, ETABS & SAFE

Knowledge in Microsoft Word, Excel & Power Point AVAILABILITY: Available for immediate joining An experience Civil Engineer with 12 years of Professional experience (7 years from GCC Countries) in Building Construction and Consultancy. Involved and handled various projects such as Villas, Hospital, Mixed-use buildings, Mid-rise and High-rise Hotel Residential Projects. Possessed adequate experience in implementing and executing required standards and requirement using ACI- 318 and BS. PROFESSIONAL EXPERIENCE:

COMPANY: AECOM Middle East LLC, UAE

Work 1

Work 1.a

DATE: October 18, 2018 to April 9, 2020

PROJECT NAME: The Bridges, UAE

CLIENT: Aldar Properties PJSC

PROJECT POSITION: Structural/ Architectural Inspector (Civil/ Structural Works and Architectural works) PROJECT DESCRIPTION:

The Bridges is a six (6) Mid-rise Towers with 26 story level, each offering 212 homes. From smart studios to spacious 3-bedroom apartments, every property brings you the very best of capital living on Reem, with balconies looking out over the canal, park, sea or city skyline. The development will also feature pop-up shops, a café, and outdoor fitness equipment to inspire the most dynamic lifestyles.

RESPONSIBILITIES:

I executed the inspection of steel reinforcement and shutter for Structural elements such as Raft slab, Columns, Core wall, Retaining wall, RCC Slab and Post tension slab

I assisted the QC and Construction team at site in implementing the project requirement based on the approved shop drawings and Method Statement

I follow up and implement any site instructions made by the Resident Engineer or Discipline Engineers

I issued Site Observation Report (SOR)/ Non- Conformance Report (NCR) to the Contractor when non- compliance noticed

I attended the Initial and final stressing of the Post tension performed by PT Specialist as per approved Method Statement

I oversee the concrete pouring at the site and test run on concrete to ensure if it is kept in the requirements of the project specification

I’m responsible for the civil works inspection such as block works, plaster works, waterproofing works, precast works

I involved in architectural inspection such as drywall, painting works, ceiling works, tiling work and Snagging inspection

I enforced the relevant safety rules and immediately report any SH&E violations

I coordinated any construction issues and change of design from different discipline (Civil, Structural, Architectural and MEP) Work 1.b

DATE: September 11, 2017 to October 17, 2018

PROJECT NAME: Masdar Institute Neighbourhood, UAE

CLIENT: Masdar City

PROJECT POSITION: Structural/ Architectural Inspector (Civil/ Structural Works and Architectural works) PROJECT DESCRIPTION:

The Masdar Institute Neighbourhood is a mixed- use development and comprised of nine mid-rise buildings with apartments, offices and retail space, including shops, cafes and a supermarket. The project featuring a commercial office building, two residential buildings, underground parking and a plaza. The Masdar Institute Neighbourhood development will use 100% renewable energy sources, advanced design and technology integration for building and infrastructure systems, and a fundamental shift in day to day behavior towards maintaining a sustainable community.

RESPONSIBILITIES:

I’m the responsible for the supervision and inspection for Civil/ Structural works of four (4) buildings of the project

I carried out the inspection the inspection for bored piling and attended/ witnessed the testing at site such as Integrity test, Cross hole sonic test, Dynamic test and Static test

I executed the inspection delivery of the steel reinforcement and taking the sample intended for tensile, bend & re-bend test and chemical properties test

I conducted the inspection for the steel reinforcement of Pile cap, Raft slab, Shear wall, Column, Retaining wall, Core wall, RCC slab and Post tension slab

I involved and witnessed the Static test performed by Pile Specialist along with the Third Party Laboratory representative and the Abu Dhabi Municipality Engineer

I closely monitor the concrete casting at the site and ensure that the design strength, slump test and temperature requirement are met prior to placement of concrete

I attended and involved in field density test of the soil performed by third party laboratory technician

I’m responsible for the inspection of block work and accessories up to plastering activities and other related civil works

I involved in architectural inspection such as drywall, ceiling, tiles, painting and Snagging inspection COMPANY: JLA International Engineering LLC, UAE

Work 2

DATE: March 17, 2016 to August 21, 2017

PROJECT NAME: West Yas – Residential 1017 Villas, UAE CLIENT: Aldar Properties PJSC

PROJECT POSITION: Civil Engineer/ Inspector (Civil/ Structural Works) PROJECT DESCRIPTION:

The total number of Villas are 1,017 of 4 & 5 bedrooms, split into two (2) sub-zones as Residential North which comprises 487 villas and Residential South which comprises 530 villas. They are 12 prototypes, categorized under two typologies layout (type 1 & type 2) with a subtotal number of 445 dwelling for the 4 bedrooms, and (type 3 & type 4) and two mirrored types (type 3m & type 4m) with a subtotal number of 572 dwellings for the 5 bedrooms. RESPONSIBILITIES:

I handled the South residential areas which comprises a 4 big precinct with 530 villas

I conducted the final inspection and approval of the steel reinforcement and shutter intended for bored pile, pile cap, raft slab, tie beams, columns and suspended slab

I attended and involved in the Static test of the specified pile in the project which was witnessed by Abu Dhabi Municipality Engineer

I reviewed the Method Statement and ITP of the project prior to execution of the works at site

I assisted in the review and forward comments on the Structural shop drawings submitted for approval by the Contractor

I prepared Field Observation Notice and/or Non Conformance Report for deficiencies of work found at the site which was failed to comply the Project Requirements and Technical Specification

I assist in the development of project specific HSE procedure COMPANY: JOANNOU & PARASKEVAIDES WLL, QATAR

Work 3

DATE: June 12, 2013 to December 24, 2015

PROJECT NAME: NAUFAR Hospital, QATAR

CLIENT: Public Works Authority (ASHGHAL)

PROJECT POSITION: QA/QC Engineer (Civil/ Structural & Architectural Works) PROJECT DESCRIPTION:

Naufar is planned as Sanctuary of wellness and treatment of substance abuse disorder in a world class resort setting. Plans are for a facility with 127 residential rooms together with clinics and over 50 individual and group treatment/ therapy rooms. An extensive range of hospitality products included a spa, gym, restaurants and café, conference center and meeting rooms supported by a personalized level of service. The facility included 6 residential lodge and 5 private villas: 1 male secure lodge with 3 floors, 20 bedrooms and 17 treatment rooms; 2 regular male lodges, each with 3 floors, 60 bedrooms and 34 treatment rooms; 1 female secure lodges with 2 floors, 12 bedrooms and 7 treatment rooms; 1 halfway house with 3 floors, 18 bedrooms and 1 treatment room and 5 VIP villas. RESPONSIBILITIES:

I handled three residential lodges, three substations, three guard houses, swimming pool and Mosque

I conducted the inspection for steel reinforcement of raft slab, suspended slab, column, wall, retaining wall prior to the final inspection and approval of the Consultant

I managed and ensure the proper documentations are in place for traceability of quality records and documents

I’m the QC in-charge for the supervision and inspection of the water leak repair of the water tank and septic tank of the project

I prepared the Method Statement and ITP of the project

I managed a timely action and close out of the Correction Action Report (CAR) and/or Non Conformance Report (NCR) issued by the Consultant

I created and developed a Key Performance Indicator (KPI) of the project

I prepared the Quality Monthly Report of the project to be submitted for Consultant’s approval

I was assigned for the inspection of blockworks, plastering, waterproofing, tiling, ceiling frames, drywalls, painting, stone cladding COMPANY: E-Dragon Power Builders, Inc, PHILIPPINES Work 4

Work 4.a

DATE: January 12, 2013 to June 10, 2013

PROJECT NAME: OKADA Manila, PHILIPPINES

CLIENT: Tiger Resorts Leisure and Entertainment Inc. PROJECT POSITION: QA/QC Engineer (Civil/ Structural Works) PROJECT DESCRIPTION:

Okada Manila occupies an area of 45 hectares (110 acres) of the Entertainment City 26,410.77 square meters

(284,283.2 sq ft) allotted to gaming. The hotel building of Okada Manila is composed of the Pearl and Coral Wings with each wing having 15 floors to be connected by two sky bridges. The glass façade of the building has a gold color representing the hue of Manila Bay’s sunset, and is one of the casino’s key themes. The US$2.4 billion phase one of the casino project includes 993 hotel rooms. Included in Okada Manila’s amenities are the Retreat Spa, a full service wellness center that offers luxury spa services; and PLAY an indoor facility for the learning- oriented entertainment of children and teens. There is also an allotted 8,409 square meters (90,510 sq ft) shopping area within the casino resort. RESPONSIBILITIES:

I’m the responsible in-charged for structural works of substructure of Podium area

I performed the inspection of steel reinforcement of pile cap, mat foundation, retaining wall, column & suspended slab

I ensure that the backfilled soil placed at site are met the requirement from the latest approved Proctor test

I prepared the corrective and preventive action prior to close-out the Surveillance Report or Non Conformance Report issued by Project Consultant

I assisted the quality team to establish and monitor the QMS of the project

I created and prepared a quality checklist for each activity of the project

I managed taking the sample of steel reinforcement of the project at every 20 tons each delivery intended for the Bend, Re-bend, Tensile test and Chemical properties

Work 4.b

DATE: July 25, 2011 to January 12, 2013

PROJECT NAME: Edades Tower and Garden Villas, PHILIPPINES CLIENT: Rockwell Land Corporation

PROJECT POSITION: QA/QC Engineer (Civil/ Structural & Architectural Works) PROJECT DESCRIPTION:

The Edades Tower and Garden Villas is an Iconic 50- story residential tower rise across the Amorsolo Square, the first of four prominent residential towers of the West Block. With a set of vision of claiming utmost prestige for delivering unparalleled luxury, this pioneering project offer only a limited number of units that include Garden Villas and Garden Lofts, aside from typical flat units, lofts and z- lofts. The Garden Villas paint a playful, landscaped cluster of premier loft apartments that complement the contemporary architectural magnificence of the residential tower. Garden lofts located within the residential tower are luxurious units that spill-out to a lavish garden deck. Amenities on the third level include a lap pool, function rooms and landscaped pocket gardens. RESPONSIBILITIES:

I was assigned as QA/QC Engineer for the Garden Villas (Podium) and three (3) blocks of Residential Tower (T3, T4, T5)

I was in-charge for the inspection of structural Columns, RCC slabs, Core wall, Shear wall, Parapet and Staircase

I preside the QC Meeting (as a replacement of QA/QC Manager) concerning the quality of works performed at site and the status of NCR’s & Project KPI’s

I managed to reduce and prevent the NCR issued by consultant by initiating to the management for the quality training of the operation team

I performed the inspection of materials delivered at site and ensure the compliance on the project requirements and specification

I monitor and update the KPI of the project

I prepared Method Statement and ITP of the project

I monitor and control the concrete casting at site and ensure that the operation team are performing according to the approved Method Statement and project specification

I involved in Civil works inspection for blockwork setting out and laying, plastering, waterproofing

I’m responsible for the inspection of tiling, ceiling frames, drywall, painting, windows, doors and kitchen cabinets COMPANY: Monolith Construction and Development Corporation, PHILIPPINES Work 5

DATE: March 15, 2010 to July 25, 2011

PROJECT NAME: Remington Hotel, PHILIPPINES

CLIENT: Travellers International Hotel Group, Inc. PROJECT POSITION: QA/QC Engineer (Structural & Sanitary/ Plumbing Works) PROJECT DESCRIPTION:

The 10- Story 3 Star Hotel has a 712 guestrooms featuring standard queen room, premiere single room and wheelchair accessible room equipped with individual climate control, a mini bar, a safe, a closet and a work desk. Each of the Standard and Premier room comes complete with internet access, a generous space for lounging and sleep, and appointments that betray the budget- friendly rates. additionally, the in- house facilities and services ensure a convenient stay. These include luggage storage and assistance, laundry service, parking and 24- hour CCTV security.

RESPONSIBILITIES:

I supervised and carried out the inspection intended for structural works including rebar, shutter and concrete.

I controlled the concrete at site through checking of temperature, slump test and guide the concrete operatives the correct placing and vibrating of concrete

I prepared the corrective and preventive action prior to close-out the Surveillance Report or Non Conformance Report issued by Project Consultant

I carried out the inspection of roughing installation of plumbing works

I verified and approved the gravity leak test and pressure test of sanitary/ plumbing works

I inspected the delivered materials on site in accordance with the project specification and approved material submittals COMPANY: Joubert Construction Inc., PHILIPPINES

Work 6

DATE: March 17, 2008 to March 15, 2010

PROJECT NAME: Mandarin Square Condominium Hotel, PHILIPPINES CLIENT: Anchor Land Holdings Inc.

PROJECT POSITION: QA/QC Engineer (Sanitary/ Plumbing Works) PROJECT DESCRIPTION:

Mandarin Square is a 39- Story High Rise luxury condominium skyscraper located in Ongpin Street in the heart of Manila. A magnificent high- rise considered to be one of the premier landmarks of Binondo. The Mandarin Square Binondo offers residential suites in two- lofts style units which are not heard of in the Binondo area years ago. The project also offers spacious 2-BR and 3-BR residential units. Each unit at the Mandarin Square is designed with fine extravagant interiors and are painted finished. Selected units have balconies overlooking the Pasig river and Intramuros to the South, Manila Bay to the west, the skyline of Manila, and University Belt area to the east. RESPONSIBILITIES:

I’m responsible for the preparation of Sanitary/ Plumbing under quality works

I’m responsible for the closure of issued Non Conformance Report by and Site Instruction by Project Consultant

I carried out the initial inspection of the sanitary line prior to Final approval of the Consultant

I attended the testing of sanitary lines and water lines and ensured that the test pass prior to final approval of Consultant

I ensured all materials delivered on site are conforming to approved MAR, Project specification and Project requirements

I prepared and estimate of sanitary/ plumbing related works and materials References are available upon request.

I hereby certify that the above information are true and correct to the best of my knowledge and belief. Wilfred T. Reyes