Post Job Free
Sign in

Project Manager

Location:
Chennai, Tamil Nadu, India
Posted:
November 01, 2020

Contact this candidate

Resume:

Curriculum Vitae

V.ASHOKRAJAKUMAR

*th ward,malathi illam,

Kuppanchettiyar street,

MGR Nagar,Usilampatti-625532

Madurai district. Mobile : 956-***-****

E-mail : ashokrajakumar307@gmail. .com

OBJECTIVE

Seeking a challenging career in an energetic firm,where utilization of my knowledge combined my hard work and prove my technical & Analytical abilities in conduct with company's goal and objective.

PROFESSIONAL EXPERIENCE:

1. “Shapoorji Palonji and co limited ., Chennai,( 9 Jul 2012 to 7 Dec 2019) ( 7 Years 5 Months)

Type of work :

ISRO(OMPF) Project (AP) (04months) – Ensured one tower Structural and concreting (E.W,Footing,Plinthbeam, Basement,G.F,F.F)

WIPRO IT Park Project -Chennai (03months) – Ensured one tower External Finishing and Infra work.(Painting,infra drain RCC,Paver)

APTIDCO Housing Board Project (AP) - (11months) – Ensured 10 tower Structural and Concreting,4Tower finishing work.(Board pile,pile cap beam,shear,Raft,Mivan shuttering wall&slab G+3, parapet,Headroom)(Cuboard slab,Floor tiling,inner painting)

FKM Project – Kerala (04months) – Ensured 3000SqM Pour Area Structural and concreting activity (E.W,Footing,Plinthbeam, Basement1-2,G+6)

ISSER Project – Kerala (09months) – Ensured one tower Finishing activity -Silt + 4 High rise building(block work, Plastering, External Concreting,water proofing, Flooring (Kotta,tiles, granite), Weathering course.

AMWAY Project- Madurai (29months) – Ensured over all activity in one tower Structural &Finishing completed with Handing over including MEP co-Ordination G+2 Building(Footing,coloumn, basement, superstructure block work,Staircase, Plastering, lintel,water proofing, Flooring (Kotta,tiles,granite,Epoxy), Weathering course.

IIM Project- Trichy (13months) – Ensured 3Tower( G+3) Building Finishing Activity.(AAC block work, plastering, Flooring (kotta,Tiles, Granite), wood work,false ceiling,inner&outer scaffolding and painting including all MEP works.

SHIRIRAM IT Project- Chennai (12months) – Ensured 2000SqM Pour area Structure and Finishing Activity.(Pcc,Raft,Rcc wall, column,Beam and PT slab, block work, plastering, Flooring (kotta,Tiles,IPS), wood work,false ceiling,inner&outer scaffolding and painting including all MEP works.

DLF SOUTHERN HOMES Project- Chennai (04months) – Ensured Higfh Rised building Finishing Activity-G+19 (Flooring (Tiles,Marble, Granite),wall painting and MEP works with Handing over.

Common Responsibility : Site Execution the work followed as GFC drawing and Delivered Quality in Target schedule time.

Prepare labour bill and company bill.

Client co-ordination smoothly.

Ensured work Safety and Quality.

2. “MARG limited ., Chennai,( 12 Apr 2009 to 9 Jul 2012) ( 3 Years 3 Months)

Type of work :

PUSHPADRUMA Project- Chennai OMR (25months) – High Rised Building(G+19) Finishing Activity.( Block work, plastering, Flooring (kotta,Tiles,IPS, Granite), Aluminium windows,wood work,false ceiling,inner&outer scaffolding and painting including all MEP works with Handing over.

SAVITHANJALI Project- Chennai OMR (16months) – High Rised Building(G+17) Structure Activity.(Pile,Pilecap, Plinth beam and column above structure activity over all.(including E.W,Steel, shuttering and Concrete pouring..etc.)

Common Responsibility : Site Execution the work followed as GFC drawing and Delivered Quality in Target schedule time.

Prepare labour bill and company bill.

Client co-ordination smoothly.

Ensured work Safety and Quality.

3.“P &C Constructions (P) Ltd”.,Chennai.(11 Feb 2007 April 2009

Type of work :

COMMON EFFLUENT TREATMENT PLANT - Tirupur (14 months) – Constructed in Treatment plantt RCC structure Activity.( Block work, plastering, Flooring (Filtteration tank, sediment tank,Pump Bed fixing,Puddle Flange fixing etc.)

VELCHERY RAILWAY STATION Project- Chennai velachery (06months) – High Rised Building(G+3) SFinishing work (Block work, plastering, flooring (Marble, Granite, Tiles,), Water proofing, Painting etc.)

BUCKIGAM CANAL Project- Chennai Thiruvamiyur(06months)- Retaining wall RCC work(Board pile, Shoring, Plinth Beam,Wall)

Common Responsibility : Site Execution the work followed as GFC drawing and Delivered Quality in Target schedule time.

Prepare labour bill and company bill.

Client co-ordination smoothly.

Ensured work Safety and Quality

4 . KMC Constructions (P) Ltd., Theni, (8June 2003 to 11 Feb 2007)

Type of work

Residential Building,Indivi Houses

Responsibility: Overall structure and Finishing, Site Supervision, Estimation& Costing, Management of Labours & Materials, Checking the RA bill

5. “The Empire Associates ., Theni,(1 April 2001 to 30 May 2003)

Type of work

Residential Building,Indivi Houses

Responsibility: Overall structure and Finishing, Site Supervision, Estimation& Costing, Management of Labours & Materials, Checking the RA bill

SOFTWARE SKILLS:

Micro Soft Excel,Auto Cad

EDUCATIONAL QUALIFICATION:

D.C.E - Civil - 75% - Tamilnadu polytechnic – Madurai - 2001

H.S.C - 84% - N.S.V.V Higher sec .school -Pattiveeranpatti- 1998

S.S.L.C - 74% - N.S.V.V Higher sec .school- Pattiveeranpatti- 1996

STRENGTH:

Ability to take leadership roles

Highly innovative

Team spirit

PERSONAL DETAILS:

Name : V.ASHOKRAJAKUMAR

Father's Name : D.VIJYARATHINAM

Date of Birth : 30-07-1981

Marital Status : Married

Spoken & Written skill : Tamil & English,Hindhi

Permanent Address : 7th ward,malathi illam,

Kuppanchettiyar street,

MGR Nagar,Usilampatti-625532

Madurai district.

HOBBIES:

Reading Technical Magazine

Listening Music

Singing

DECLARATION

I hereby declare that the information furnished above is true to the best of my knowledge and belief.

Place : Usilampatti Your's faithfully,

Date : 19-10-2020 V.ASHOKRAJAKUMAR



Contact this candidate