M Navaneetha Krishnan
Planning Engineer
Mobile No: +91-893*******,
Address: Dr/no.127/134 East Street,
T. Chokkalingapuram (near)Thevaram, Theni (Dt)- 625530, Tamil Nadu, India. Email : adhell@r.postjobfree.com
LinkedIn Profile : https://www.linkedin.com/in/navaneetha-murugan-91824a125/ Skype : live:navaneez.3
Profile Synopsis
Qualified Planning Engineerwith 5+ years of possessing experience and core expertise in Project planning and controls Engineering for InfrastructureMetro stations (Elevator level, Tunnel, At-grade level), Metro viaduct structure, Road works (Bitumen and Concrete), Buildings, Schools, Storm water drain, Experience in site supervision, Construction and Architectural (Fit outs, Façade, Roof) works. Knowledge of Construction methods and Construction sequences in Civil structural, Construction above or below the ground, good knowledge in MEP works (Firefighting, Electrical and HVAC), VHTS, BACSsystem, Testing
& Commissioning
Education
BE CIVIL ENGINEERING ANNA UNIVERSITY 2010-2014
First classAnna University - Chennai
MASTER DIPLOMA IN BUILDING DESIGN CADD CENTRE 2014-2015 Certification for AutoCAD+Revit Architecturefor Engineers+STAAD Pro+Primavera(P6) Skills
Project Planning MS Project & MS Office
Suite
Project Management
Reporting & Monitoring Interior Architectural Roof Work (GRP & Cladding)
Roads & Highways External Envelope Metro Station works
Metro Rail Via Duct Tunnel Construction At-grade Track works
Concrete (Pre-Cast &
Cast-In-Situ)
Client Oriented & Team
Management
Utilities & Diversion
Strengths
Strong leadership, communication, analytical
and influencing skills
Excellent reporting, technical writing and
system knowledge
Ability to evaluate and develop detail
Construction schedule
Ability to multi-task in a demanding
engineering environment
Logical thinker with excellent planning skills Resolving technical issue and coming up with fast efficient solution
C V o f N a v a n e e t h - P l a n n i n g E n g i n e e r P a g e 2 4 Key Achievements
Progress Measurement
Progress Monitoring
Programme Status Reporting
Managing Master Programme Schedules
Proficiency in computer systems and ability to use application like P6, MS Project, AutoCAD and MS Office tools
Software skills
Proficient in AutoCAD, MS Excel, MS Office,MS Project, MS Power point,Primavera P6, Revit Architecture, STAADPro
Key Projects Involved
Doha Metro Rail Project Red Line North-RLR JV, Doha, Qatar Greater Chennai Corporation for2015, 2016 and 2017 Budgeted works Construction of compound wall and maintenance of buildings at Perambur, Chennai-11, Southern Railway Work Experience (Total 5+ years’ experience)
Project: Doha Metro – Red Line North Elevated and At-Grade (From May-2017 to present) Firm: Rizzani de Eccher S.p.A (Main Contractor)
Position: Planning Engineer
Client: Qatar Rail
Consultant: Louis Berger – Egis Rail
Project Type: Design & Build
Project valve: QAR 2,214,764,000.00 (2.2 Billion)
Scope of Project: Design and Construction of 6.6 KM metro line (Viaduct section 2.5 KM – 57 Cast in-situ Piers/ Pier heads and 630 Precast segments), Tunnel section 0.4 KM, Trough sections 1.9KM and At grade sections 1.8 KM) which includes Two Stations (Elevated station and At grade station) and 0.52KM Pedestrian bridge with MEP and Architecture works, Stabling yard, ITPS Building, Technical building, Attenuation tanks, Temporary road diversions 4.1 KM, BPS manholes, Culverts and Utility diversions (Wet and Dry utilities).
Delivered monthly and weekly program update to client as per Contractual requirement (Primavera P6), Site monitoring, utility diversion, maintaining quantities & KPI reports.
Handling Civil &Architectural fit out works for 2 stations in Doha Metro Project (Qatar University & Lusail stations) which include progress monitoring (P6), progress measurement and reporting requirements
HandledCivil &Architectural external works for Cut & Cover(Tunnel Structure) and Via duct (Elevation Structure) with achieved before target completion
Site visit with Client for Architectural and MEP weekly progress, highlighting drawings, creating sequence of work tracker to support the construction team.
C V o f N a v a n e e t h - P l a n n i n g E n g i n e e r P a g e 3 4
Provide weekly and monthly progress measurement updates to client (Weightage tree)
Prepared and submitted daily, weekly and monthly reporting requirements to the client, maintaining total manpower and coordinating with safety officer for AFR, EFR reports.
Prepared look ahead program for weekly and monthly targets to be issued to Construction team (MS project).
Prepared Health and safety manpower report for daily, weekly and monthly basis to maintain ratio of safety officer to reduce the site incident
Monitored sub-contractors in the completion of daily operations to ensure project progress and optimal performance.
Arranged monthly site progress photoshoot and prepared the magazine along with Quarterly progress videography to the client as per Contractual requirement
Knowledge in MEP works for First fix to Final fix of installation & Testing Commissioning stages of test, BACS and VHTS (Elevator, Moving Walkway and Escalator)
Prepared the outstanding reports of all disciple(Civil, MEP & ARC) for Client and analysing the critical & delay activities and resolved the lack of execution
Monitoring Station Area Planning (SAP) works for two station and line items, which include (Road ways, Footpath, Landscaping)
Maintaining the Design drawing, Shop drawing, As-built drawing tracker for following from the DVE to the status & approval of the package’s
Project: Greater Chennai Corporation for 2015, 2016 and 2017 Budgeted works (From Dec-2014 to Mar-2017) Position: Technical Assistant (Site Engineer)
Location: Chennai – Vyasarpadi Division-45, Unit-11, zone-04 Client: Tamilnadu State Government
Project valve: INR 3,50,000,00 (35 Million)
Scope of Project: Construction and maintenance of Building’s, Schools, Hospitals and College, Construction of Road works include Concrete roads-65no’s-(8KM) and Bitumen roads-42no’s- (56KM), Stormwater drain-2.5KM, Playground-4 no’s(8000 SQM), Road crossing(1.5KM), Speed breaker 14no, Footpath (2KM), Drainage sewer connection -2.5KM, Swachh Bharat mission – Composed Yard 2no, Source Segregation 2no – (recycling of wastage from market, hotels and schools), Amma kudineer Construction – 1no, Amma Unavakam 2no (building).
Site inspection on daily bases to monitor all site activities carried out accordance with standard specifications and follow the client circulars process the daily site inspection request
Maintain full site records a detailed dairy of the day works activities, works approved or rejected, hours of operation, procurement, labour, equipment and heavy vehicle’s used etc
Prepared the daily report and progress measurement with the site people reported to Assistant Engineer
Strong relationship management & communication skills with ability to relate at apex level with Business partner / Subcontractors / Consultants / Government Execute Engineer with ease as well as obtaining necessary clearance for approvals for the projects
C V o f N a v a n e e t h - P l a n n i n g E n g i n e e r P a g e 4 4
Supervised multiple project employee including interior and outer ring Bitumen roads, Concrete roads, Road crossing for storm water drain anddesalting,footpath and Individual household Latrice
Prepared bill of quantity, estimation documents, bar bending schedule and measurement Books for road
&building Works
Arranged the Safety prevention for storm water drain and drainage connection works and removed all desalting wastage and rubbish from site
Conduct walkthroughs with Senior Engineer at the end of a project to determine overall quality, over course of employment and found issues with four buildings that needed to be rectified immediately
Work with team before construction begins to determine whether the proposed plans will abide by all state ordinance, Checking Plans before constructing division buildings, Co-ordinating with Assistant Engineer and Contractors
Prepared all kind of document works include Measurement books, Correspondence letters, Paper documents of Corporation schemes etc
SOUTHERN RAILWAYS
Project: Construction of compound wall and maintenance of buildings (From Jun-2014 to Nov-2014) Position: Site-In charge
Location: Chennai – Perambur
Client: Central Government
Project valve: INR 20,000,00 (2 Million)
Prepared estimation of 215 meter of compound wall length, height 3.2 meter and maintenance of building total cost of 20lakhs
Completed the project before the congested time and prepared estimated bill claims Personal Details
Date of Birth : 25/03/1993
Father’s Name : R.S.Murugan
Nationality : Indian
Marital Status : Married
Passport No : M8559442
Passport valid up to : 16/04/2025
Contact No : +91-893*******
Language Capability
English : Spoken – good; written – good; reading – good Tamil : Spoken – good; written – good; reading – good Hindi : Spoken -- Elementary