Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Houston, TX, 77082
Posted:
October 29, 2020

Contact this candidate

Resume:

Salim R. Alfartosy

Tel: 832-***-**** **** Shadow Knoll Ct

Houston, TX 77082 adhefk@r.postjobfree.com

Objective

Outstanding supervisory skills, participation above and beyond assigned responsibilities, excellent communication skills, self started, able to handle a wide variety of tasks, train client in system theory and operation.

Experience with Ovation Emerson DCS, Allen Bradley PLC, AB point I/O, Stratix switches, and Siemens PLC.

Experience with AC drives (ABB, Eaton Vacon, Yaskawa, and GE Converteam),

Experience with generator control (.Ross Hills System, EasYgen, EGCP2)

Experienced I&C technical lead for projects containing I&C scope of work, electrical works, review electrical and control system design.

Experience with Field Instrumentation selection and application.

Oil & gas drilling work, power plant work, plastic industry and aircraft maintenance.

Strong communication skills, interpersonal skills / ability to work within a multi-disciplined/ multi-cultural team.

Practical Experience

(From--To)

Position

Employer

Location

Mar, 2014— Apr, 2020 Engineering Technician Nabors Drilling Houston, TX

Worked on PLC code upgrade project for rig fleet

Installed new AB PLC L8 processors and commissioned them

Re-imaged HMIs, servers, Stratix switches and configured UPS’

Did functional test and interlock test and trained rig crews on the new equipment

Start up and commissioning of VFD lineup ( Yaskawa Drives) for offshore platform.

Support the operation of draw works by training rig crew and troubleshooting.

Calibrate temperature, pressure, and level transmitters.

Calibrate temperature, level, pressure, and limit switches.

Implement modification on electrical design and update as built drawings.

Troubleshooting and preventive maintenance work on VFD lineup and draw works equipment.

Jul, 2012— Dec, 2013 Control Eng. Infodat Inc Houston, TX

I worked for Infodat as a contractor with Canrig Drilling Technology Inc.

Installed new PLC, terminated other equipment and modified the old systems to standardize oil rigs.

Installed new Point I/O and terminated them.

Replaced old 4 channel AB analog card with 8 channel card for TD and modified the termination.

Performed pretest and 101 point test after the modification.

Troubleshooting of issues relating to rig operation.

May, 2011— Jul,20 12 Field Service Eng. AETI Houston, TX

Performed startup and commissioning work for generator control systems in oil rigs.

Troubleshooting generator control system, AC drives, DC drives.

Modified AB PLC program.

Worked on Ross Hill and Woodward control systems.

Nov, 2009— May, 2011 Electricians/ Eng. Inteplast Group LTD Lolita, TX

Installed new AB PLCs & do I/O termination.

Modified old AB panel view by replacing their CRT with new flat screens.

Installed new extrusion line and its auxiliary equipment.

Designed new circuit, designed new PLC program for material conveyer system and executed these designs.

Completed loop check from equipment to PLC.

Executed modification on existing PLC programs.

Troubleshoot electric motors, AC drives, DC drives, pneumatic equipment, thermocouples & RTD.

Nov, 2008— Apr,20 09 I&C Training Engineer Parsons Brinkerhoff Baghdad South PP/Iraq

Reviewed all I&C training modules, modify them& translate them to Arabic.

Held training course on instrument calibration using HART 375 & Fluke744 communicators in 4 PPs.

Held training courses on use of test equipment in 4 power plants.

Sep, 07—Aug, 08 O&M Site Coordinator IPA/ Parsons Brinkerhoff Daura PP/ Iraq

Issued site daily snap shot, detailed daily & weekly reports.

Issued On-Job–Training monthly schedule & Perform On-Job–Training sessions on I&C topics.

Reviewed all site training reports & Attend monthly site coordinators meeting with project management.

Given consultant advice for plant staff on operational & maintenance issues.

Issued field materials requests and follow up their status & coordinate site team work with plant staff.

Aug, 06---Sep, 07 I&C Start Up Engineer IPA / Worley Parsons Daura PP / Iraq

Assigned a daily schedule for the I&C teams to do their work.

Supervised analog & digital instruments’ calibration in workshop & DCS.

Verified the latest loop diagram according to which the test to be performed& Red line as built loop drawings.

Completed configuration of I/O points & DCS cards for Ovation Emmerson DCS.

Ordered missing components and do the replacement & do suitable training for technicians.

Mar, 06—May, 06 Electrical Field Engineer Bechtel Corporation Baghdad South Gas PP/Iraq

Followed up the subcontractor (GE) open punch list.

Submitted a daily report to Bechtel supervisor about work progress.

Attended a weekly meeting with GE (subcontractor) to review work progress.

Feb, 05—Mar, 06 I&C Start Up Engineer Bechtel Corporation Daura PP/Iraq

I&C lead responsible for 2 engineers, 3 supervisors, 4 foremen & 30 technicians.

Assigned a daily schedule for the teams to do their work & verify the technical support to complete the job.

To insure that loops from field element to DCS is correctly tested.

Confirmed the correct indication to the appropriate graphics in DCS.

Supervised analog and digital instruments’ calibration in workshop & DCS.

To rectify engineering issues with engineering dept.

Red line as built loop drawings & submit them to engineering dept.

Do suitable training for technicians.

Turnover coordinator of all I&C documents to the client.

Oct, 04--Feb, 05 Electrical Field Engineer Bechtel Corporation Mussayab PP /Iraq

Supervised maintenance work in 400KV switch yard.

Supervised maintenance work in 6.6 KV switchgears and motors.

Supervised maintenance work in 380 V MCC and motors & review all electrical data test sheets

Jan, 04--Oct, 04 Electrical Field Engineer Bechtel Corporation Bayji PP/ Iraq

Electrical lead responsible for 4 electrical engineers and 25 electricians.

Assign a daily schedule for the team to do the maintenance work on steam turbine units.

Reviewed the subcontractor‘s daily report & submit a daily report to Bechtel electrical superintendent.

Supervised the maintenance work on 4 unit transformers & 4 main transformers.

Supervised the replacement of old cable trays in boiler 3 & 4.

Supervised the maintenance work on 380V motors and supervise all motorized valves calibration.

Reviewed all electrical data test sheets.

Educational Certificate: Degree Class. University Year

B. Eng. Avionics Upper Second (Honor) Queen Mary College 1987

(University of London)



Contact this candidate