RESUME
SABBAVARAPU SIVA PRESENT ADDRESS
Position Desired : CIVIL ENGINEER DNo: 23-45-2,
Qualification : Diploma in Civil Engineering. Dayal Nagar,
Total experience : 8.5 years Pedagantyada,
Date of Birth : 07/07/1989 Visakhapatnam
Languages know : English, Hindi, Telugu` Andhrapradesh (state),
ZIP: 530044.
Passport No : -
E-mail Id:******.*****@*****.***
Passport Valid : -
Mobile No : 91-733*******
PROFESSIONAL INFORMATION
To secure a challenging and admirable position as a Civil engineer in a reputed organization which will offer me the opportunity to involve in execution, planning, estimation quality and industrial safety of Offshore/Onshore structures. To provide undeterred attention and reverence to the job at hand to help a successful organization and to help myself grow further professionally.
EDUCATIONAL QUALIFICATION:
Course
Year of Passing
University/Board
School/College
% Of Marks
Diploma (D.C.E)
2011
State Board of Technical Education and Training
Andhra Polytechnic, kakinada.
84.43
INTERNAL SKILLS
Excellent Technical and Drawing Knowledge.
Excellent Problem solving Tendency.
Easily adapt to situation and persons.
Highly involving in work for greater job satisfaction.
COMPUTER SKILLS
Technical : - AutoCAD,
Office tools : - MS-Office.
PROFESSIONAL EXPERIENCE IN DETAIL
LARSEN & TOUBRO CONSTRUCTION LTD (L & T), INDIA.
YEARS OF EXPERIENCE: JULY/2011 To December/2019.
DESIGNATION: CIVIL EXECUTION ENGINEER.
PROJECT DETAILS:
L & T METALOIGICAL MATERILAS HANDLING IC
PROJECTS: Construction of “BLAST FURNANCE 8” OF BSP (BHILAI) DURG, CHHATTISHGARH, INDIA.
Client : SAIL (Steel Authority of India Limited)
Consultant : Mecon India Limited.
Duration : JULY/2011 TO JUNE/2017.
DESIGNATION : SITE EXECUTION ENGINEER, BAR BENDING INCHARGE.
TECHNICALSKILLS : BILL OF QUANTITIES
EXPERIENCE : 6 YEARS
PROJECT 1 : BLAST FURNACE 8
PREPARATION OF BAR BENDING SCHEDULE FOR ALL STRUCTURES WHICH ARE LOCATED TROUGHT OUT BLASTFURNA
MAINTAINING STEEL YARD INDIPENDENTLY AND DELIVERING REINFORCEMENT AS PER SCHEDULE TO ALL SITES.
CONSTRUCTION OF TYPCAL WATER RETAING STRUCTURES LIKE GCP COOLING TOWER, PUMPHOUSE, SGP COOLING TOWER, INBA ETC.
COSNSTRUCTION OF HIGH RISE BUILDINGS LIKE SUBSTATIONS, CONTROL ROOMS, ECR BUILDINGS, ADMINISTRATIVE BUILDINGS ETC.
CONSTRUCTION OF RCC ROADS, DRAINS, CULVERTS, AND SEWERAGE SYSTEMS ALONG WITH HANDOVERING TO THE CLIENT.
ACHIEVED A GOOD APPRECIATION BY CLEARING ALL THE PUNCH POINTS REGARDING TO FINISHING, PAINTING, WATER LEAKAGE ETC.
PROJECT 2 : CONSTRUCTION OF “ZINC BENIFICATION PLANT”,
Client : HINDUSTAN ZINC LIMITED
Duration : JULY /2017 TO OCTOBER/2019.
DESIGNATION : CIVIL SITE ENGINEER.
TECHNICALSKILLS : ( BOQ ) STEEL YARD.
ANALYSIS & ESTIMATION OF SHUTTERING AND RENIFORCEMENT FOR ALL STRUCTURES.
PROJECT 3 : CONSTRUCTION OF “UTKAL ALUMINA INTERNATIONAL LIMITED ”,
Client : UTKAL ALUMINA INTERNATIONAL LIMITED”,
Duration : OCTOBER/2019TO Till .
DESIGNATION : CIVIL SITE ENGINEER.
TECHNICALSKILLS : ( BOQ ) STEEL YARD.
ANALYSIS & ESTIMATION OF SHUTTERING AND RENIFORCEMENT FOR ALL STRUCTURES.
ROLES AND RESPONSIBILITYS:
Execution of site with respect to proposed Drawings and specifications in stipulated duration of time and optimized resources with high quality and safety according to International Standards.
Analyzing of the Drawings and finding various Quantities of Resources such as manpower, construction material and equipment’s etc., in prior for execution of work.
Submitting various Drawings for Client’s and Consultant’s approval
Preparation of construction methodology as construction activity wise.
Preparation of Documents such as Bar Bending schedule, Concrete pour cards, Billing, Work producer, Safety Green File, etc.,
Coordinating with planning / purchase department for arranging Resources in prior.
Ensuring the Quality and safety in each and every activity in site.
Proper Resource utilization and optimization as per constants.
Authorized to solve quarries and problems among the sub ordinates.
Monitoring the site progress by comparing Planed Vs Achieved.
Design, Assembly and Erection of Slip form for Structure wise.
Application of Slip form technique in Slip form operation.
Dis-Assembly of Slip form.
Maintaining of Formwork materials for Entire project.
Providing Form work requirements and also declaring surplus after execution.
Declaration:
I hereby solemnly affirm that all the details provided above are true to the best of my knowledge.
Signature,
S.SIVA
Place – Pedagantyada
Date: -30/06/2020.