CURRICULAM VITAE
SAMI
Mobile No : 989-***-****/978-***-****
E-mail ID : adh98q@r.postjobfree.com
India : Tamilnadu,Ramnad.
POST APPLIED FOR : Site Engineer / QC Engineer - (Mechanical) CARRIER OBJECTIVE:
A qualified Mechanical Engineer and dynamic Project Professional, Having an experience of 14 years in Construction Industry and worked in Airport Projects, High Rise Buildings and Villa Projects. Dealing with Site Inspections, Material Inspections and MEP Clearance. Seeking for an opportunity to utilise my technical skills and to develop my future carrier. STRENGTH:
Good technical knowledge
Quick to learn new things
Ability to work under pressure
Maintaining standard of work
Co-operation with team members
PERSONAL SKILLS:
Good spoken & written communication skill
Problem solving ability
Planning of work schedule
COMPUTER KNOWLEDGE:
Microsoft Word
Microsoft Excel
INDUSTRIAL EXPOSURE:
Tamilnadu Transport Corporation at Nagercoil
Special Purpose Machine Shop at Chennai
Thermal Power Plant at Tuticorin
ACADEMIC PROFILE:
Bachelor of Mechanical Engineering Degree Completed in April - 2001 From Manonmaniam Sundaranar University @ Tirunelveli, Tamilnadu, India. EXPERIENCE : 14 Years in U.A.E
Organization : BK Gulf L.L.C Dubai.
Designation : QA/QC Engineer (MECH)
Project Involved : Abu-Dhabi International Airport ( Midfield Terminal Building ) Period : December 2015 to August 2019
Project Involved : Dubai Mall Fashion Avenue Expansion Period : September 2019 to July 2020
Organization : Emirates Falcon Electro Mechanical Co L.L.C Dubai. Designation : QA/QC Engineer (MECH)
Project Involved : Palma 121 Villas ( Arabian Ranches – Phase 2 ) Period : May 2015 to October 2015
Project Involved : Dubai International Airport 2 - Expansion ( Phase-III ) Period : April 2012 to April 2015
Project Involved : Silverene Twin Tower ( Jumeirah Beach ) Period : March 2009 to April 2012
Project Involved : Burj-Dubai ( Development Plot - 29/30 ) Period : March 2008 to March 2009
Organization : A&P Paraskevides and Partners L.L.C. Dubai. Designation : Site Engineer (HVAC)
Project Involved : Jumeirah Beach Residences JBR Sector 01(B07- T01) Period : July 2005 to July 2007
Organization : Prim Engineering Private Limited, Chennai, India. Designation : Site Engineer (HVAC)
Project Involved : Ascendas IT Park, Deccan Park Hotel, Chennai City Center, Spencer Plaza Phase- II (Extension Works)
Apollo K.H Hospital, Melmaruvathur Temple,
Period : August 2002 to June 2005
Knowledge of MEP Works:
Centralised Air Conditioning System
Installation of Chillers, Heat Exchangers, Cooling Towers, Chilled Water Pumps, AHUs, BCUs, FCUs, Split units,Auto-Dozing Pumps, Chilled water pipes (U/G & A/G), Duct works, Insulation works, Cladding works, Sand Trap Louvers, Sound Attenuators, Supply Fan, Extract Fan, Air outlets, Pressure test, Air leakage test, N2 leakage test, Vacuum test & Commissioning.
Plumbing and Drainage System
Installation of water tanks (RCC&GRP), Transfer Pumps,, Booster Pumps, Submergible Pumps, Grease Trap Interceptor, Water Heater, Water meter, Water hammer arrestor, Water supply pipes (U-PVC,C-PVC,PPR,GRE),U/G-A/G Drainage pipes(U-PVC&GRP),Insulation works, sanitary ware fixtures, Pressure test, Gravity test, Air leakage test, Flow test, Performance Test, PRV Commissioning and Domestic water chlorination test. Fire Protection System
Installation of fire pumps (Electrical, Diesel & jockey), ZCV, Landing Valve, Sprinkler pipes, Stand pipes, Hydrant, Breeching inlets, Fire hose cabinets, Sprinkler heads, FM 200 system, Pre-action system, Foam system,Gas Suppression system, Pressure test, Pneumatic test, Puff test, Integrity test & PRV Commissioning.
Electrical System
Installation of Generator, Bus Bar, MDB, SMDB, DB, Panels, Cable Trays, Cable Ladders, Cable Trunkings, PVC Conduits, GI Conduits, GI Back boxes, Underground cables (Lightning, Earthing & Power), Above ground Cables, wires,Light Fittings and Accessories. Basic Knowledge:
1. Pipe colour code and standard
2. LV & ELV System
3. Building Management System.
4. Material Quantity take off.
5. Chilled & Condenser Water Chemical Treatment.
6. Domestic Water Chlorination test.
7. Welding Works.
8. Project Close-out documents.
Duties & Responsibilities:
Check the MEP Installation Works, whether the works are been executed as per approved shop drawings and approved materials.
Check all delivered materials at site to comply with contract specification.
Issuing of method statement and conducting tool box talk before starting of any new activities on site.
Collecting the Documents and reports such as NCR, SON and submitting corrective action & preventive action for close-out. Raising the WIR, MIR to get the approval from the consultant.
Find out the deficiencies of work on site at the time of execution, then report to Site Engineer and raising the Site Instruction to respective Site Engineer and Manager.
Arranging of material inspection at site and get approval from the consultant.
Raising the inspection for installation of all Mechanical works executed on site and get approval from the consultant.
Witness the Pressure test and Air test.
Ensure that all WIR’s and MIR’s to be checked prior to submission.
Checking of the MEP services Provisions & Locations as per approved shop drawing before the concreting works.
Giving MEP Clearances to Main Contractor-Such as Casting of Concretes, Riser Shaft, Plastering, Painting & False Ceiling Closure.
Preparation of documents such as WIR Tracker, Method Statement, O & M Manual. Personal Profile:
Date of Birth : 21-04-1979
Marital Status : Married
Nationality : Indian
Known Languages : English, Hindi, Tamil & Malayalam Contact Address : 2/71, Veeravanoor,
Vairavanendal (Post), Achuthanvayal (Via),
Paramakudi (Thaluck)
Ramanathapuram (District),
Tamilnadu (State), India,
Passport Details:
Passport No : K 5729500
Date of Issue : 13-03-2012
Date of Expiry : 12-03-2022
Place of Issue : Dubai-U.A.E.
Declaration:
I hereby declare that the details given above are true to the best of my knowledge and belief.
Regards,
SAMI