CURRICULUM VIATE

NASIR KHAN Email: adh7ft@r.postjobfree.com

Post- Project Engineer Phone. -876********

CAREER OBJECTIVE:

To transfer the zeal and enthusiasm for task accomplishment and becoming a professional with world class ethos and enhance my learning from the challenges faced and constantly move in the direction of up gradation of career development.

PERSONAL PROFILE:

NAME : Nasir khan

FATHER NAME : Mohideen khan

D.O.B. : 01 Jan. 1998

Sex : MALE

NATIONALITY : INDIAN

Pass port no. :

Notice Period : One Week

Educational Profile:--

EXAM PASSED

DURATION

YEAR OF PASS

BOARD/UNIVERSITY

PARCENTAGE

B. TECH IN Civil

2016-2019(REGULAR)

2019

RAJASTHAN TECHNICAL UNIVERSITY KOTA INDIA

65.86%

DIPLOMA IN CIVIL. ENGINEERING

2013-2016(REGULAR)

2016

B.T.E.R JODHPUR

70.73%

10TH

2012-2013

2013

R.B.S.E AJMER

57.33%

Software skills

Bentley Water GEMS/Water CAD

Bentley Sewer GEMS/Sewer CAD

Bentley Storm CAD

AutoCAD Civil 3D

AutoCAD 2D

Esri ArcGIS

EPANET

Global Mapper

MS Office

Sole Professional

ESurevy CAD

Auto Plotter

JOB PROFILE: 3 Years Exp. In Water Pipe line/Sewerage system & Drainge System

1) Present Company: I&R Projects and Consultant

Name of Employer I&R Projects and Consultant.

Job Period From 14-08-2017 to till Date

Client PHED Rajasthan JDA NCC Limited

Project Activities :-

Planning and Existing assessment available on the ground

Design the whole project with the software skills

Conduct site inspection prior to implementation of the project

Supervise and conduct survey work

Prepare plans and programs of work.

Claculation of Estimating and costing for the whole project according to the design

Supervise layout in the planning of the project

Study of the existing assessment in the Ground if available

Attending weekly meeting talks headed by the Govt. officers for project site Development and Possible improvement of the production and procedure on the project

Adheres to company policies procedures Government laws rules and regulation and work requirement

LIST OF COMPLETE PROJECTS

Name of Work: Construction of Gulara group of villages, Bachouli Group of Villages and Tilaetha group of villages Water Supply Scheme, District- Jhansi (Based on Surface Water)

and relevant works including Commissioning and Operation & Maintenance for 10

Years.(Project Cost:-270.36Crore)

Scope of Work: - Design Consultancy services for GBT & Burpura group of villages Water Supply Scheme, District- Jhansi.

Client Name: - NCC Limited Hyderabad

Survey of the Villages and Prepare There Drawings

Study of the existing water Supply Source in the Area

Population Projection And Zone Wise Demand Calculations

Design the Distribution System and Calculating the total Length Of the pipe lines

Providing the pipe lines According to the Area

Design the Raw&Clear Water Rising Man from WTP to the Feeding Esr, GLR and GLSR

Calculating the total Estimate for the same &Prepare the Detailed Project Report

Name of Work: Design of Distribution System of Bijoliya and Mandalgarh Group of Villages under the Chambal Bhilwara Water Supply Project

Scope of Work: Survey, Investigation, Design and preparation of detailed engineering report Cost Estimates for approval of Administrative and Financial Sanction for urban water supply scheme for Bundi District (Raj) (250 Villages)

Client Name: - NCC Limited Hyderabad

Survey of the Villages and Prepare Their Drawings

Study of the existing water Supply Source in the Area

Population Projection and Zone Wise Demand Calculations

Design the Distribution System and Calculating the total Length of the pipe lines

Providing the pipe lines According to the Area

Design the Raw Clear Water Rising Man from WTP to the Feeding Esr, GLR and GLSR

Calculating the total Estimate for the same &Prepare the Detailed Project Report

Name of Work: Chambal Water Supply Project Scheme Bundi

(Raj.) (392 Villages)

Scope of Work – Survey, Investigation, Design and preparation of detailed engineering report Cost Estimates for approval of Administrative and Financial Sanction for urban water supply scheme for Bundi District (Raj) (392 Village)

Client Name: - PHED Rajasthan

Project Description: - Survey of the 392 Village and Prepare There Drawings

Study of the existing water Supply Source in the Area

Design the Distribution System and Calculating the total Length

Of the pipe lines

Providing the pipe lines According to the Area

Design the Raw&Clear Water Rising Man from WTP to the Feeding Esr, GLR And GLSR

Calculating the total Estimate for the same Prepare the Detailed Project Report

Name of Work: -Water Supply Project Scheme For Sunera Sherpur Khanjarpur Roorkee (Uttarakhand)

Scope of Work – Survey, Investigation, Design and preparation of detailed engineering report Cost Estimates for approval of Administrative and Financial Sanction for urban water supply scheme for Bundi District (Raj) (392 Village)

Client Name: - PHED Uttarakhand

Project Description: - Survey of the Villages and Prepare There Drawings

Study of the existing water Supply Source in the Area

Design the Distribution System and Calculating the total Length Of the pipe lines

Providing the pipe lines According to the Area

Design the Raw&Clear Water Rising Man from WTP to the Feeding Esr, GLR and GLSR

Calculating the total Estimate for the same &Prepare the Detailed Project Report

Name of Work :- Narmada Based Water Supply Project for Villages of Chouhtan and Gudhamalani And Tehsils, Barmer District (Package-1)(3500 Villages including MH And OH)

Scope of Work – Survey, Investigation, Design and preparation of detailed engineering report Cost Estimates for approval ofAdministrative and Financial Sanction for urban water supply scheme for Barmer District (Raj) (3500 Village)

Client Name: - PHED Rajasthan

Project Description: - Survey of the Villages and Prepare There Drawings

Study of the existing water Supply Source in the Area

Design the Distribution System and Calculating the total Length Of the pipe lines

Providing the pipe lines According to the Area

Design the Raw&Clear Water Rising Man from WTP to the Feeding Esr, GLR and GLSR

Calculating the total Estimate for the same &Prepare the Detailed Project Report

2) Previous Company : VISTAAR INFRATECH (I) PVT. LTD JSIPUR

Designation: - PROJECT ENGINEER

Name of Employer VISTAAR INFRATECH (I)PVT LTD

Job Period From 15-08-2016 To 15-07-2017

Client CPWD, INDIAN OIL, MES, KSPTS

Project Activities :-

Planning and Existing assessment available on the ground

Design the whole project with the software skills

Conduct site inspection prior to implementation of the project

Supervise and conduct survey work

Prepare plans and programs of work.

Claculation of Estimating and costing for the whole project according to the design

Supervise layout in the planning of the project

Study of the existing assessment in the Ground if available

Attending weekly meeting talks headed by the Govt. officers for project site Development and Possible improvement of the production and procedure on the project

Adheres to company policies procedures Government laws rules and regulation and work requirement

Prepare the whole detailed project report for the Project

LIST OF COMPLETE PROJECTS

1.Name of Work – Provision of Consultancy Service for Topographical Survey & Design of the drainage System for Domestic & Technical Area at Airforce Station Chandigarh

Scope of Work – Survey, Soil Investigation, Design and preparation of detailed engineering report Cost Estimates for approval of Administrative and Financial Sanction for Military Engineer Services Chandigarh

Role: - PROJECT ENGINEER

Client Name – Military Engineer Services Chandigarh

Project Description: - To Study the Existing Drainage System Inside Technical and Domestic Area According to the Scope of Work

To Determine the Discharge Capacity and Adequacy of existing Drainage System

To determine and resolve critical points in Drainage system

To determine low laying areas and to implement best Engineering Practice for avoiding water logging Problems

To ensure that all components of Chandigarh air Force station are Protected from Flooding in major Storm

2. Name of Work-Providing Consultancy Service for Engineering Survey and Further Preparation of DPR for Supplying, Erection Testing and commissioning of Well Designed STP atKota Super Thermal Power Plant (Raj.)

Scope of Work: - Survey Investigation and Detailed ProjectReport and Detailed Estimate and Structural Design of a Well Designed STP

Role: - PROJECT ENGINEER

Client Name – Kota Super Thermal Power Plant Kota (Raj.)

Project Description: -

Carrying out the survey work for the Detailed Study of the Area

Population Forecasting for providing of the Sewerage System in the Entire Area

Calculating the total Discharge Capacity for Providing of a Well Designed STP

Calculating the Cost of estimation for the Providing the EntireNetwork & STP

Prepare the Detailed Project Report & Drawings for the Same

2.Name of Work: Providing Consultancy Service for Study Of Entire Existing Sewerage System and Providing Proper Solution for the Sewer Problems at Domestic Area of the Gujarat Refinery Vadodara Gujarat.

Scope of Work: - Survey Investigation and Design Study of the entire Sewer System and Detailed Project Report andDetailed Estimate

Role: - PROJECT ENGINEER

Client Name – Indian Oil Corporation Limited

Project Description – To Study the entire existing Sewer System And provide the proper solution

Carrying out the Survey Work for the Detailed study of the area

Drone Survey for the Finding of the missing manholes In the Area

Provide the Sewer Network where Sewer Network are Not Available

Calculating the Existing Discharge Capacity of the Area And

Calculating the Capacity of the STP

Find out the missing Manholes and Choked Manholes

Calculating the detailed estimate for the New Sewer Network

DATE:- YOURS FAITHFULLY

(Nasir Khan)



Contact this candidate