Post Job Free

Resume

Sign in

Electrical Engineer Power

Location:
Khajurla, Punjab, India
Salary:
60000
Posted:
November 29, 2020

Contact this candidate

Resume:

LAKHVIR SINGH

# ** ***** ***** ******* *****. Patiala,140401, Punjab, India

Contact No: 91-946*******, 998-***-****

Email: adh7ej@r.postjobfree.com Skype: lakhvir.singh571

SUMMARY

Profile: Male, 47 Years

Nationality: Indian

Current Location: Punjab,India

Current Position: Senior Electrical Engineer_Construction

Current Organization: Hartek Power Pvt. Ltd.

CAREER PROFILE

A qualified Electrical Engineering with 18 years of Construction Management & Maintenance experience in exacting Pharmaceutical, Distillers,Oil & Gas,Waste Water Treatment, and Water Supply Distribution Network, 400/132kv,66/11kv,11kv/415V Substation Project & EPC Projects.Demonstrated competencies in planning,scheduling, detailed engineering, equipment specifications, project & maintenance coordination and effective deployment of resources to ensure project delivery within defined cost and timelines. Adept in identifying and eliminating project bottlenecks to catalyze project implementation. Strong record of delivering several challenging projects & maintenance within agreed schedules. Articulate and assertive with strong analytical, coordination and leadership skills,superior verbal and written communication.

WORK EXPERIENCE

Dec’18- till date Hartek Power Private Limited Phase-8B Mohali Punjab India

Senior Electrical Engineer_Construction

Job Responsibilities :- Managed & Supervised execution of Construction & commissioning Electrical & Civil works on 66/11/0.415 KV substation. Check shop drawings for Punjab Stast Power Corporation Limited submission/approval and complying Punjab Stast Power Corporation Limited comments. Arrange material & coordinate with contactor for work site. Prepare technical documents & get the work done as per drawings, Prepare pre commissioning check lists, test reports, as built drawings. Monitor project progress in terms of quality & timelines & prepare Inspection request for complete segments, Monitor safety standard at project site

The Industrial Projects ( EPC) Under Supervision Project are

Shri Ambey Steel Industries Vill. Alour Pir, Gajju Shah Road Khanna [Pb.] 66/11kv 1-way switch yard we are successfully Commissioning.

Varun Beverages Ltd. Pathankot [ Pb.] 66/11kv 1-way switch yard we are successfully Commissioning.

Madhav Alloys Pvt. Ltd. Village Akal Garh, Amloh [Pb] Extension, 66/11kv 1-way switch yard we are successfully Commissioning.

Rajdhani Casting Pvt. Ltd. Mandi Gobindgarh [Pb.] 66/11kv 1-way switch yard we are successfully Commissioning.

Aarti Impex Pvt. Ltd. Ludhiana [Pb] 66/11kv 2-way switch yard we are successfully Commissioning.

Happy Forging Ltd. Ludhiana [Pb] 66/11kv 2-way switc yard we are successfully Commissioning.

Sun Shine Pvt. Ltd. Mandi Gobindgarh [Pb.] 66/11kv 1-way switch yard Under construction.

Chopra alloys Pvt. Ltd. Vill. Alour Khanna [Pb.] 66/11kv 2-way switch yard Under construction.

The Punjab State Transmission Corporation Projects (EPC)Under Supervision Project are

220kv S/S Bus Bar Protection Scheme in (Mansa, Dera Bassi, Ladowal, Humbran, Patran) Pb. New BB panel installation.Exsiting CRP panels in cable laying from line isolator,bus bar isolator.CT,CB and relay fiting in exsiting crp panel and Cable Gland and Termination and commissioning.

PREVIOUS WORK ASSIGNMENTS

May’18 To Dec’ 18 Parabolic Drugs Limited vill. Sundhran Derabassi Punjab India

Electrical Engineer_Maintenance & Utility

Job Responsibilities :-

To attend the breakdown of the electrical equipment in the plant effectively w.r.t and quality

To do preventive maintenance of the electrical equipment as per schedule.

To maintain respective practices and PPE while attending any kind of job.

To highlight the non safe working practices to the department in charge so that these issues are resolved to make the working area safe & friendly. .

To take the daily reading of the HT meter and recoed it.

To ensure that power factor is achieved and it should not be less than 0.95.

To ensure that the utility equipment’s run effectively and all the parameters are recorded in log sheet. .

To give inputs to make workpace & records audit for GMP complimance.

EHS Responsibilities :-

Supervising personal for effective implementation of the EHS programme

into the work process.

Auditing his area of control for improvement w.r.t EHS.

Trainig his subordinates for improved safety.

Jan’14 To May’ 17 Sogreah Consultant, Artelia International Group, Muscat, OMAN

Electrical & Instrument Inspector

Client: PUBLIC AUTHORITY FOR ELECTRICITY AND WATER MUSCAT (OMAN)

Client: Majis Industrial Services (S.A.O.C) Sohar, Oman

Job Responsibilities :- Supervised Construction on Muscat water supply network Distribution & Center Effluent Treatment Recycl Plant Electrical & Instrument work as well as review design documents & drawing and manage commissioning of project

The projects under Muscat Supervision Project are

Al Seeb I & II Distribution: Provision for ring main power supplies at Al Khoud and Old Reservoir, Reservoir, Transformer, pumps with soft starters rated at 550kW for Al Khoud pumping station, Trnsformer, RMU,6.6kv switchgear Internal and extenal lighting,Surge system at Al Khoud pumping station, Auxiliary equipment; compressors, a/c units, fans, overhead cranes, earthing etc at Al Khoud pumping station. Expansion of Distribution Networks in Seeb Wilayat Package 2 Power supplies for electromagnetic flow meters, Battery Charger, MOV etc.

Al Amerat I & II Distribution & Al Amerat Transmssion: Provision for power supplies at five main sites; Al Amerat Reservoir, Main Pumping Station,Deem+Hajer Pumping station, Deem Reservoir and Baie Tanker Filling station.Cathodic protection (temporary and permanent) for CS pipeline,Transfer pumps at Main Pumping,Hospital,NA3 Break pressure tank and Deem+Hajer pumping station, Internal and extenal lighting,Surge system at MPS and Deem+Hajer, Auxiliary equipment;compressors, a/c units, fans, MOV, earthing etc at all locations

Al Ghubra Transmission: Construction of Water Transmission Network from Ghubrah Desalination Plant to Muscat Reservoir Provision for ring main power supplies at RUWI site,Cathodic protection (temporary and permanent) for CS pipelineTransfer pumps with soft starters rated at 600kW for RUWI pumping station Internal and extenal lighting, Surge system at RUWI pumping station, Auxiliary equipment; compressors, a/c units, fans, overhead crane,MOV, Battery Charger,earthing etc.

Emergency Reservoirs: (Al Qurm, Ruwi, Al Wattayah, Wadi Al Kabir) Panel & DB,Internal and extenal lighting, Auxiliary equipment; a/c units, MOV,UPS,earthing etc

Center Effluent Treatment Recycl Plant-1 Sohar Industrial Port: Supervised execution of construction Electrical & Instrument works on effluent treatment recycle plant.

Jan’11 To Jan’14 M/S Control & Application Emirates, Abu Dhabi, UAE

Electrical Engineer

Job Responsibilities :- Managed execution of Electrical works installation of Transformer,RMU,Switch Gear (33kv,11kv,6.6kv) VFD, Supply main Distribution board, Lighting & power Distribution Board. MCT Installation, Lightning arrestor, Earthing work, Tray& Support work, cable Pulling, landing &Termination work.

Check shop drawings for Consultant submission/approval and complying Engineer’s comments. Arrage material & labour for work site. Prepare technical documents & get the work done as per drawings, Prepare pre- commissioning check lists, test reports, as built drawings, cable schedules and detailed commissioning schedules for the above-mentioned systems. Monitor project progress in terms of quality & timelines & prepare Inspection request for completed segments, Monitor safety standard at project site.

Instruments Handled: Level transmitter, Level indicator, pressure transmitter, Pressure differential transmitter, Flow transmitter, Flow element, Temperature element, Temperature transmitter, Gas Detector(H2s,HC). Tray & Support work, Cable pulling, Glanding & Termination work

The Industrial projects under Construction Project are

Waste Water Treatment Plant- Al-Ahamah, Al Ain, UAE.

Ruwais Refinery Expansion Project EPC 4 – Tankage & Piping, Abu Dhabi, UAE.

Integrate Gas Development Das Island, Abu Dhabi, UAE.

Full Filed Development ASAB, Abu Dhabi, UAE.

Feb’07 To Mar’10 M/S Global Energy Technologies Ltd. Jebel Ali, Dubai, UAE

Electrical Foreman

Job Responsibilities :- Erection, Installation, Termination & Commissioning of 132/11/ 0.415KV & 400/132kv substation DEWA. Installation of Micro Sol RTU panels for various SCADA projects in (SEWA). Manufacturing of RTU Micro Sol Scada panel for Saudi electricity Board.

The projects under Construction Project are

SCADA projects in Sharjah UAE.

Manufacturing of RTU Micro sol Scada panel.

Jebel Ali Airport Dubai, UAE (SIEMENS Pakistan)

Ras al khor Dubai, UAE (AREVA France)

Oct’05 To Feb’07 M/S Chandigarh Distillers & Bottlers Ltd. Banur, Punjab, India

Junior Engineer

Job Responsibilities:- Operation and maintenance of 3 MW Steam Turbine Generator (back pressure). Auxiliary system of Steam Turbines Electrical Maintenance of Diesel generator set of capacity up to 1000 KVA servicing. Operation and maintenance of 66 KV outdoor substations, 11 KV Double Bus Bar in door substation, VCB for 11 KV, 6.6 KV and ACBs for 0.415 KV, MDB, PCC, and MCC Centralization of electrical PCC and MCC control room.

Apr’01 To Oct’05 M/S Surya Pharmaceutical Ltd. Banur, Punjan, India

Electrical Supervisor

EDUCATION

2017 B-Tech in Electrical Engineering

Janardan Rai Nagar Rajasthan Vidyapeeth [DEEMED] University, Rajasthan.

2001 3 Years Diploma in Electrical Engineering

Punjab State Board of Technical Education & Industrial Training Chandigarh

(Thapar Polytechnic Patiala )

1993 Senior Secondary in Electrical (Vocational Group)

Punjab State Education Board S.A.S. Nagar Mohali, India

Traning:

One Year JE Apprentice From Punjab Stast Electricity Board

Certifications:

Certificate Course Application Programming of PLC's & Drives from C.E.D.T.I. Mohali Punjab

Computer Course (Swifts Jyoti) M.S. Word, Excel, Power Point, and Internet from NIIT

AutoCAD

IT SKILLS

MS office & Internet Application

LANGUAGES

Punjabi,English, Hindi



Contact this candidate