RESUME
Employee Name Date of Birth Address
Mobile No. Email
: ANAND YADAV
: 11thof July 1991
: Kashyap nagar Kalyanpur Kanpur Nagar pun 208017
adh6sp@r.postjobfree.com
Summary: 6+ Years of Work experience in Telecommunication Academic Record
Summary of Work Experience
(Start with currentemployer)
Employer & Name
Period
From
To
Total Experience (Duration in Month)
Designation
MM
YYYY
MM
YYYY
YEARS/MON THS
ROLE
Shivam info Pvt Ldt
May
2019
Mar
2020
10 months
F.M Engineer
I W S
Apr
2018
Apl
2019
13 months
S. S Engineer
N R Switch N Radio Services Pvt. Ltd.
May
2017
Mar
2018
11 months
F.M Engineer
Quess Corporation Ltd.
Feb
2016
Feb
2017
13 months
E node B Engineer
Talentpull services Pvt.Ltd.
Jan
2015
Jan
2016
12 Months
O&M Engineer
NameofEmployer : Shivam info pvt ldt DurationofEmployment: Apr2019toAtpresent JobTitle : EricssonEngineer
ProjectDescription :SiteInstallationIntegrationandalarmhandling Role : F.MEngineer
Responsibilities
Technologies
2G,3G,4G,
GoodworkingknowledgeonEricssonBTS(6630,5216,5212,2001,).
Maintenance andConsolidation.
Integration and alarmhandling
Installationof2300,2500.U900&L1800,G900,L900,U1800,L2100,U1800MHzIntegrationand antenna band of 4G,3G,2G forIDEA.
FDDandTDD,MIMOIntegrationandalarmhandling.Goodworkingknowledge&Experience on NMS (network managementsystem).
Alignment&fine-tuningofmicrowavelinks(0.3,0.6,1.2,1.8m)betweentwosites
VisitvendorteaminstalledsitetocheckqualityoftheirInstallationandAlignments.
Updatedaily,monthlyreports,Preparetherequireddocumentationfordaytoday activities& submission toseniors.
Tracking of annual maintenance contract of vendors for their servicing.
Operating and maintenance of all types of electrical equipment such as Transformer, DG, UPS, electrical panels, H.T/L.T Breakers, ATS, etc. to ensure that all equipment is well maintained so as to avoid any breakdowns.
OperationandmaintenanceHVACSystem(AHU,CSU,Chillerplant,Split,VRF&Cassettes AC)
Planning of preventive maintenance schedule of all types Electrical, HVAC, fire system, BMS system Equipment’s.
PeriodicinspectionofGeneralSafety&Securitysystems,FireAlarmsystem,FireSprinkler system,toensurethatallequipmentiswellmaintainedsoastoavoidanybreakdowns.
Building Management System & operating and rectification of the problems related electrical as well as HVAC System.
Ensuring work instructions, procedures & standards, safety rules while at work are strictly adhered.
Periodicinspectiontoensurethatallequipment&systemwellmaintainedinhealthy conditions,soastoavoidanybreakdowns.
NameofEmployer : I WS
DurationofEmployment : Apr 2018 to Apl2019
JobTitle : Samsug Senior SiteEngineer
ProjectDescription :SiteInstallationIntegrationandalarmhandling Role : S. SEngineer
Responsibilities
Installationof2300&1800MHzantennabandof4GforRelianceJio.
InstallationofGSMof850MHzAntennabandof4GforRelianceJio.
ATP11Aforinstallationqualityreport.
ATP11Btocheckthespeedofnetwork.
RFE1survey.
Maintenance, Integration and alarmhandling
Technologies
GSM,nodeBandEnodeB,
NameofEmployer :NRSwitchNRadioServicesPvt.Ltd. DurationofEmployment : May 2017 to Mar2018
JobTitle : FMEngineer
ProjectDescription :FieldOperationandMaintenanceEngineer.
Role : F. MEngineer
Responsibilities:
GoodworkingknowledgeonEricssonBTS(RBS2206,RBS2964,RBS2954,6101,6201,6202, 6601).
Goodworkingknowledge(Installation&commissioning)ofEricssonAXXMULTIPLEXER(OMS 860, OMS 870, OMS 846OMS-1410,OMS-1460)
GoodworkingknowledgeofSoftwareUpgradeon(AXX&NPU).
Able to monitor Ericsson BSC independently. Also having knowledge to troubleshooting internal alarm of BTS site from BSC and also monitoring from OSS end with using proper commands.
Goodworkingknowledge&ExperienceonNMS(networkmanagementsystem).
Alignment & fine-tuning of microwave links (0.3,0.6,1.2,1.8m) between twosites
PerformancemeasurementAnalysisusingOSSserver,tosupervisetheTraffic/Radio measurements,andthequalityofservicesprovidedbythenetwork.
ResponsibleforregularhealthcheckupofsiteandPRMofsiteasperthenormsofcustomer. TakebackupofBTSandTransmissionequipment’s.
Responsibletohighlighttheissueofsiteeitherpoweroractivetocustomer.
ResponsibleforBSCregularvisit,checkupandtakebackupofit.
ResponsibleforconducttheallplannedactivityontimesincoordinationwithZTM
AcceptingtheATPofnewequipment’sinstalledatsiteasperthenormsofcustomers.
Technologies
2G, 3G &4G
NameofEmployer :QuessCorporationLtd. DurationofEmployment : Feb 2016 to Feb 2017 JobTitle :MicrowaveEngineer.
ProjectDescription :CeragonlinkAlignmentProject. Role : Microwave Engineer Responsibilities
ResponsibletoInstallation,AlignmentsandIntegrationofCeragon(0.3m,0.6m,1.2m,and 1.8m)MWatplannedsiteofJIOsiteaspertheLinkBudgetplanwithateamofRiggers.
Responsible for timely and proper delivery of materials as per the checklist plan to site. So checkallmaterialsatthetimeofdeliveryatsite.
Responsible for proper installation of Ceragon MW at site, as per the norms of customer. ProperAlignmentsasperplanandachievedplannedRSLvalue.
Responsibleforallthequalityrelatedissueatsite,somakesureeitherourteamorvendorto all installation or alignments as per the customerrequirements.
ResponsibleforconfigurationofCeragonIDUIP21Casperproperplanwithpropersoftware updatesofversion21,68,78and182.
ResponsibleforIntegrationforCeragonIDUIP20,throughCiscorouterandL2SwitchwithJIO fieldteam.
ResponsibleforATPofsitealongwithJIOfieldteamaspertheirrequirements,andgetATP sigh fromthem.
VisitvendorteaminstalledsitetocheckqualityoftheirInstallationandAlignments.
Technologies
2G,3G,4G
NameofEmployer :TalentpullservicesPvt.Ltd. DurationofEmployment :Jan2015toJan2016
JobTitle : O & MEngineer.
ProjectDescription: : NOKIA BTSMaintenance
Role : Operation and MaintenanceEngineer.
Responsibilities
Installation,Commissioning,SiteintegrationofNokia2G,3G,4GLTE(bothTDD&FDD),CRFS, 2G Modernization and U-900band.
KnowledgeofinstallationandcommissioningofUltra,Flexi,MR,MR10BTS.
InstallationandcommissioningofSDHandPDHmicrowavesystem.
E1connectionfromcellsitetoBSC.
E1droppingatnewsiteandE1bypassing,E1dividing.
UpgradingofE1capacityfrom4*2to8*2or16*2asperplan.
TRxexpansionin2G(900&1800)&3G.
Operationandmaintenanceofbasestationandmicrowavenetworks.
CoordinatewithMNOCtorectifyperformancerelatedalarm.
DefiningandtestingofallalarmrelatedtoBSS.
Monitoringandmaintenanceofmicrowavetransmissionnetwork.
Monitoringthequalitycontrolduringinstallationofsite.
CheckallequipmentproperlyusedinGSMantenna-tilt,connectorjumperandweatherproofing.
RFIsurveyfor2G,3G,4G(TDD,FDD),CRFSandU900.
Acceptancetest(AT)
Siteintegration.
Installation ofBBU3900,BBU3910,
Commissioning with WDT (Wireless DeploymentTool).
ISDPworkforqualityofinstallation.
SiteIntegration.
AcceptanceTest.
RFIsurvey
Maintenance and alarmmonitoring.
InstallationofMWAntenna,RTN905,RTN950,RTN950A,RTN980
MW RTN Commissioning, & AlarmRectification.
20/Apr/2020 UttarPradesh DATE PLACE SIGNATURE OFEMPLOYEE
:
Name of School /
College
Board /
University
From
To
Degree Exam.
Full Time /
Part Time / Distance Learning
MM
YYYY
MM
YYYY
Kanpur University
Kanpur University
Aug
2012
Jun
2015
BSc.
Full Time
Janta inter College
UP Board
Aug
2010
May
2012
12 th
Full Time
Janta inter College
UP Board
Mar
2009
May
2010
10 th
Full Time