OCTOSO JALINO JOSEPH
Brgy. E. Lopez new site, SILAY CITY
Negros Occidental, Philippines 6116
TEL NO: +639*********
CELPHONE No.: +639*********
Alternate CELPHONE, 094********
Email Add: ************@*****.***
Skype ID: joseph.carlos.octoso
Current Location: Philippines
Availability: I can start for work as soon as possible.
PERSONAL DATA
Age: 42
Date of Birth: July 4, 1974
Gender: Male
Civil status: Married
Height: 165 cm
Weight: 65 kg
Nationality: Filipino
Religion: Christianity – Catholic
Permanent Address: BRGY. E. LOPEZ new site, SILAY City
Negros Occidental, Philippines 6116
WORK EXPERIENCE
I have been working 17 years local and overseas.
1. Position: Piping Supervisor
Duration: October 2014 – May 2015
Company: SUNGCHANG ENGINEERING & CONSTRUCTION CO. LTD
Company Industry: Ethylene
Location: UZBIKISTAN
Country: UZBIKISTAN
Department: Piping
Job Description:
Provide direct supervision to all mechanical Installation in both commercial and industrial setting.
Recognize employee’s strength and weakness to ensure their weakness.
Proficiently execute skills in installing pipes, Valves, chillier, heat exchanger, compressors, control valves, boilers pumps, steam trap and many other component’s
Maintain a positive attitude and strong work ethic while solving problem’s under extreme pressures
Organizes the safety and day to day operation to maximize efficiency
Oversee the entire phases of the start-up and shut down of different system to ensure they operate within parameters
Supervise and coordinate daily activities of 10 to 15 pipefitter’s and lead man
Proficiency in blue print reading, pipe lay-out subcontractor scheduling, material procurement safety policies implementation, and lock-out tag-out procedures
Demonstrate expertise in utilizing various hands tool’s along with power tools
Handle safety job analysis to ensure completeness of resource’s, including information, tools and equipment, material’s needed by staff to complete assigned tasks safety
Implemented hydro static test on system to ensure they will function under the design pressure and temperatures
Reporting-attend scheduled project meeting’s present management with status update’s, potential issues and project risk
Coordinating with Q.C. department and client, subcontractors, inspector to carry out inspection
Coordinating with fabrications of pipe’s shop drawing & construction.
2. Position: Piping Supervisor
Duration: September 2012 – September 2013 (1 year)
Company: ARCC/EEI ALRUSHAID CONSTRUCTION CO. LTD
Company Industry: Energy (Electrical Power & Petroleum)
Location: YANBU K.S.A
Country: YANBU K.S.A
Department: Piping
Job Description:
Received drawing and instruction from the superiorfor the construction and assembly of piping activities
Inspect documents, check available assembly materials and delegate work to employee. *define assembly welding jobs, identifying the parts to be fabricated at the work shop and field job to FERFORM of upon assembly.
Ordinate and check the carried out by the personnel directly acting during more difficult stage ( piping routes, check of depths, lifting operation.)
Prepare as built drawing with all variation made during works giving the superior all data for correct accounting.
Control the execution of work GUARATING quality, ensure the operative programmed is complied with and check that applicable safety and standard are observed.
completion as per test package
3. Position: Piping Supervisor
Duration: July 2011 – Aug 2012 (1.1 years)
Company: ARCC/EEI ALRUSHAID CONSTRUCTION CO. LTD
Company Industry: Energy (Electrical Power & Petroleum)
Location: JUBAIL K.S.A
Country: JUBAIL K.S.A
Department: A/G Piping
Job Description:
Received drawing and instruction from the superior
Inspect approved documents for construction. Check available materials and make for request
Pipe layout preparation, tools and equipment.
Pipe erection and installation of piping activities
Observed house keeping and follow all safety rules and regulations.
Attend construction coordinating meeting
Completion as per test package
4. Position: Piping Foreman
Duration: Jul 2010 - Jul 2011 (1 years)
Company: ARCC/EEI ALRUSHAID CONSTRUCTION CO. LTD
Company Industry: Oil / Gas
Location: Chevron NCP/ north plot project ( SABIC )
Country: Chevron NCP/ north plot project ( SABIC )
Department: Piping A/G
Job Description:
Received drawing and instruction from the superior the construction and assembly of piping works and activities
inspect approved documents drawing for construction
comply with detailed program for the use of personnel and equipment made available, promptly report any interference with and or variation to the work of other parties
5. Position: Piping Foreman
Duration: Jan 2009 - Jan 2010 (1 years)
Company: ARCC/EEI ALRUSHAID CONSTRUCTION CO. LTD
Company Industry: Energy (Electrical Power & Petroleum)
Location: SHUQAIQ K.S.A
Country:
Department: A/G piping
Job Description:
Received drawing and instruction from the superior for the construction and assembly of piping works and activities.
preparing as built isometric as per site conditions.
preparing isometric by referring general ARANGEMENT.
FABRECATION and installation of above ground and underground piping works at different area.
coordinating works assignments with subordinates and superior.
attending construction coordinating meeting.
6. Position: Piping Foreman
Duration: Apr 2007 - Oct 2008 (1.5 years)
Company: GAMA INDUSTRY ARABIA CO.LTD
Company Industry: Polymer / Plastic / Rubber / Tyres
Location: RABIGH K.S.A
Country:
Department: A/G piping
Job Description:
Received drawing and instruction from the superior for the construction and assembly of piping activities
coordinating works team directly in order to maintain high standard of performance quality and safety.
checking all isometric drawing and GA piping field installation and established the necessary logistic.
attend weekly and monthly meeting analysis work progress.
motivate workers to attain the production schedule.
attending construction coordinating meeting.
7. Position: Piping Foreman
Duration: Feb 2006 - Apr 2007 (1.2 years)
Company: GAMA INDUSTRY ARABIA CO.LTD
Company Industry: Oil / Gas
Location: HAWIYAH K.S.A
Country:
Department: A/G piping
Job Description:
Received drawing and instruction from the superior for the construction and assembly of piping works activities
preparing approved drawing for construction
monitoring progress and distribution of daily task necessary tools and materials needed with particular emphasize on compliance with specific safety rules and quality standards.
ensuring the necessary logistic for each of team.
attending construction coordinating meeting.
8. Position: Piping Foreman
Duration: Jun 2004 - Jul 2005 (1.1 years)
Company: ALI M. AL NASFAN EST.
Company Industry: Energy (Electrical Power & Petroleum)
Location: JUBAIL K.S.A
Country:
Department: A/G piping
Job Description:
Received drawing and instruction from the superior for the construction and assembly of piping works and activities.
preparing approved drawing for construction
preparation of construction materials
FABRECATION and installation of above ground and underground piping works at different area.
coordinating works assignments with subordinates and superior
attending construction coordinating meeting
9. Position: Piping Foreman
Duration: Dec 2003 - Jan 2004 (0.1 years)
Company: MID EAST CONSTRUCTOR
Company Industry: Construction / Building / Engineering
Location: DOHA QATAR
Country:
Department: piping
Job Description:
RECEIVED instruction from the superior for the ASSYMBLY and construction of piping works activities.
Preparing approved drawing for construction
Preparing and monitoring of FABRICATION activities as per sequencing codes and standard during FABRICATION works is PERFORMED in accordance with the approved procedure.
Arranging for qc inspection and third party inspector according to approved it
Attend daily weekly monthly progress report.
10. Position: Piping Foreman
Duration: Mar 2003 - Nov 2003 (0.7 years)
Company: JMJ sale and constructor
Company Industry: Construction / Building / Engineering
Location: BACOLOD CITY NEG. OCC PHIL
Country:
Department: piping/ mechanical
Job Description:
RECEIVED instruction from the superior for the construction of piping works activities.
Participating and preparing of task risk ASSESMENT for the job to CATIGORIZED AND MEASURE the precaution for the task to carry out job safely and with Out lost time injury.
PERFORM the job according to site installation and FABRICATION.
Monitoring group of pipefitters daily production and FIT-UP FULLWELDING report.
Attend daily production meeting.
11. Position: Piping Foreman
Duration: Aug 2002 - Dec 2002 (0.3 years)
Company: MIESCOR IND. ENG.SERVICES CORP.
Company Industry: Energy (Electrical Power & Petroleum)
Location: MANILA PHIL.
Country:
Department: mechanical /piping
Job Description:
RECEIVED instruction from the superior for construction of structural and piping works activities
12. Position: Charge hand
Duration: Dec 2000- Jun 2002 (2 years)
Company: Hitachi plant Co.LTD
Company Industry: Steel PLANT
Location: Ain Sukhna
Country: Egypt Afreca
Department: piping
Job Description:
RECEIVED instruction from the superior for the construction of piping works activities
13. Position: Steelworker
Duration: Jul 1999 –Oct 2000 (1.3 years)
Company: Mohammad Al Mojil group
Company Industry: Energy (electrical power& petroleum)
Location: Jubail K.S.A
Country:
Department: piping
Job Description:
RECEIVED instruction from the superior for the construction of piping works activities
EDUCATION
Highest Education Second Highest Education
Education Level: Post Graduate Diploma/ Mater’s Degree High School Diploma
Education Field: Engineering (Petroleum/Oil/Gas) Engineering (Mechanical)
Course: Associate in Industrial Technology High School Grad
School/University: CHMSC D.M.L.M.H.S
Location: TALISAY CITY NEG OCC Bacolod City Neg. Occ
Date: June 1991 – Nov 1993 May 1987 – April 1990
SKILLS
Skill Level of Proficiency Remarks
1 piping supervisor can perform both piping and mechanical works
2 piping foreman can perform piping works, and also structural works.
Structural foreman,
Mechanical foreman
3 PDS/PDMS, isometric general arrangement
TRAININGS/SEMINARS
Date Topic/Course Title
Nov 5, 2010 – Nov 25, 2010 Foremanship Course TUV NORD Germany
Noel S. Remonde
ARCC/EEI Construction Co. LTD
Permit to work Training
First Aid Course
HS Induction Training
H2S Training and sea survival
Confined spaced Training Course
LANGUAGES SPOKEN
Proficiency
Level
Language (5=Excellent;
1=Poor)
1. English, Tagalog 3
Arabic
AVAILABLE DOCUMENTS
Passport
Number: EC 4543737 Expiry Date: June 28, 2020
Place of Issue: DGA Bacolod City Date of Issue: June 29, 2015
REFERENCES
Joseph JalinoOctoso Piping Foreman
AL RUSHAID CONSTRUCTION CO. LTD.
Tel. No. (03) 8980028-(03)8674049
Email: ********@*****.***
Relationship: employer
Joseph JalinoOctoso Group Leader
GAMA Almoushegah Arabia Ltd.
Tel. No.: 038981972-024250782
Email: ********@*****.***
Relationship: employer