Post Job Free

Resume

Sign in

Pipefitter

Location:
Cebu City, Philippines
Posted:
November 27, 2020

Contact this candidate

Resume:

OCTOSO JALINO JOSEPH

Brgy. E. Lopez new site, SILAY CITY

Negros Occidental, Philippines 6116

TEL NO: +639*********

CELPHONE No.: +639*********

Alternate CELPHONE, 094********

Email Add: adh6nj@r.postjobfree.com

Skype ID: joseph.carlos.octoso

Current Location: Philippines

Availability: I can start for work as soon as possible.

PERSONAL DATA

Age: 42

Date of Birth: July 4, 1974

Gender: Male

Civil status: Married

Height: 165 cm

Weight: 65 kg

Nationality: Filipino

Religion: Christianity – Catholic

Permanent Address: BRGY. E. LOPEZ new site, SILAY City

Negros Occidental, Philippines 6116

WORK EXPERIENCE

I have been working 17 years local and overseas.

1. Position: Piping Supervisor

Duration: October 2014 – May 2015

Company: SUNGCHANG ENGINEERING & CONSTRUCTION CO. LTD

Company Industry: Ethylene

Location: UZBIKISTAN

Country: UZBIKISTAN

Department: Piping

Job Description:

Provide direct supervision to all mechanical Installation in both commercial and industrial setting.

Recognize employee’s strength and weakness to ensure their weakness.

Proficiently execute skills in installing pipes, Valves, chillier, heat exchanger, compressors, control valves, boilers pumps, steam trap and many other component’s

Maintain a positive attitude and strong work ethic while solving problem’s under extreme pressures

Organizes the safety and day to day operation to maximize efficiency

Oversee the entire phases of the start-up and shut down of different system to ensure they operate within parameters

Supervise and coordinate daily activities of 10 to 15 pipefitter’s and lead man

Proficiency in blue print reading, pipe lay-out subcontractor scheduling, material procurement safety policies implementation, and lock-out tag-out procedures

Demonstrate expertise in utilizing various hands tool’s along with power tools

Handle safety job analysis to ensure completeness of resource’s, including information, tools and equipment, material’s needed by staff to complete assigned tasks safety

Implemented hydro static test on system to ensure they will function under the design pressure and temperatures

Reporting-attend scheduled project meeting’s present management with status update’s, potential issues and project risk

Coordinating with Q.C. department and client, subcontractors, inspector to carry out inspection

Coordinating with fabrications of pipe’s shop drawing & construction.

2. Position: Piping Supervisor

Duration: September 2012 – September 2013 (1 year)

Company: ARCC/EEI ALRUSHAID CONSTRUCTION CO. LTD

Company Industry: Energy (Electrical Power & Petroleum)

Location: YANBU K.S.A

Country: YANBU K.S.A

Department: Piping

Job Description:

Received drawing and instruction from the superiorfor the construction and assembly of piping activities

Inspect documents, check available assembly materials and delegate work to employee. *define assembly welding jobs, identifying the parts to be fabricated at the work shop and field job to FERFORM of upon assembly.

Ordinate and check the carried out by the personnel directly acting during more difficult stage ( piping routes, check of depths, lifting operation.)

Prepare as built drawing with all variation made during works giving the superior all data for correct accounting.

Control the execution of work GUARATING quality, ensure the operative programmed is complied with and check that applicable safety and standard are observed.

completion as per test package

3. Position: Piping Supervisor

Duration: July 2011 – Aug 2012 (1.1 years)

Company: ARCC/EEI ALRUSHAID CONSTRUCTION CO. LTD

Company Industry: Energy (Electrical Power & Petroleum)

Location: JUBAIL K.S.A

Country: JUBAIL K.S.A

Department: A/G Piping

Job Description:

Received drawing and instruction from the superior

Inspect approved documents for construction. Check available materials and make for request

Pipe layout preparation, tools and equipment.

Pipe erection and installation of piping activities

Observed house keeping and follow all safety rules and regulations.

Attend construction coordinating meeting

Completion as per test package

4. Position: Piping Foreman

Duration: Jul 2010 - Jul 2011 (1 years)

Company: ARCC/EEI ALRUSHAID CONSTRUCTION CO. LTD

Company Industry: Oil / Gas

Location: Chevron NCP/ north plot project ( SABIC )

Country: Chevron NCP/ north plot project ( SABIC )

Department: Piping A/G

Job Description:

Received drawing and instruction from the superior the construction and assembly of piping works and activities

inspect approved documents drawing for construction

comply with detailed program for the use of personnel and equipment made available, promptly report any interference with and or variation to the work of other parties

5. Position: Piping Foreman

Duration: Jan 2009 - Jan 2010 (1 years)

Company: ARCC/EEI ALRUSHAID CONSTRUCTION CO. LTD

Company Industry: Energy (Electrical Power & Petroleum)

Location: SHUQAIQ K.S.A

Country:

Department: A/G piping

Job Description:

Received drawing and instruction from the superior for the construction and assembly of piping works and activities.

preparing as built isometric as per site conditions.

preparing isometric by referring general ARANGEMENT.

FABRECATION and installation of above ground and underground piping works at different area.

coordinating works assignments with subordinates and superior.

attending construction coordinating meeting.

6. Position: Piping Foreman

Duration: Apr 2007 - Oct 2008 (1.5 years)

Company: GAMA INDUSTRY ARABIA CO.LTD

Company Industry: Polymer / Plastic / Rubber / Tyres

Location: RABIGH K.S.A

Country:

Department: A/G piping

Job Description:

Received drawing and instruction from the superior for the construction and assembly of piping activities

coordinating works team directly in order to maintain high standard of performance quality and safety.

checking all isometric drawing and GA piping field installation and established the necessary logistic.

attend weekly and monthly meeting analysis work progress.

motivate workers to attain the production schedule.

attending construction coordinating meeting.

7. Position: Piping Foreman

Duration: Feb 2006 - Apr 2007 (1.2 years)

Company: GAMA INDUSTRY ARABIA CO.LTD

Company Industry: Oil / Gas

Location: HAWIYAH K.S.A

Country:

Department: A/G piping

Job Description:

Received drawing and instruction from the superior for the construction and assembly of piping works activities

preparing approved drawing for construction

monitoring progress and distribution of daily task necessary tools and materials needed with particular emphasize on compliance with specific safety rules and quality standards.

ensuring the necessary logistic for each of team.

attending construction coordinating meeting.

8. Position: Piping Foreman

Duration: Jun 2004 - Jul 2005 (1.1 years)

Company: ALI M. AL NASFAN EST.

Company Industry: Energy (Electrical Power & Petroleum)

Location: JUBAIL K.S.A

Country:

Department: A/G piping

Job Description:

Received drawing and instruction from the superior for the construction and assembly of piping works and activities.

preparing approved drawing for construction

preparation of construction materials

FABRECATION and installation of above ground and underground piping works at different area.

coordinating works assignments with subordinates and superior

attending construction coordinating meeting

9. Position: Piping Foreman

Duration: Dec 2003 - Jan 2004 (0.1 years)

Company: MID EAST CONSTRUCTOR

Company Industry: Construction / Building / Engineering

Location: DOHA QATAR

Country:

Department: piping

Job Description:

RECEIVED instruction from the superior for the ASSYMBLY and construction of piping works activities.

Preparing approved drawing for construction

Preparing and monitoring of FABRICATION activities as per sequencing codes and standard during FABRICATION works is PERFORMED in accordance with the approved procedure.

Arranging for qc inspection and third party inspector according to approved it

Attend daily weekly monthly progress report.

10. Position: Piping Foreman

Duration: Mar 2003 - Nov 2003 (0.7 years)

Company: JMJ sale and constructor

Company Industry: Construction / Building / Engineering

Location: BACOLOD CITY NEG. OCC PHIL

Country:

Department: piping/ mechanical

Job Description:

RECEIVED instruction from the superior for the construction of piping works activities.

Participating and preparing of task risk ASSESMENT for the job to CATIGORIZED AND MEASURE the precaution for the task to carry out job safely and with Out lost time injury.

PERFORM the job according to site installation and FABRICATION.

Monitoring group of pipefitters daily production and FIT-UP FULLWELDING report.

Attend daily production meeting.

11. Position: Piping Foreman

Duration: Aug 2002 - Dec 2002 (0.3 years)

Company: MIESCOR IND. ENG.SERVICES CORP.

Company Industry: Energy (Electrical Power & Petroleum)

Location: MANILA PHIL.

Country:

Department: mechanical /piping

Job Description:

RECEIVED instruction from the superior for construction of structural and piping works activities

12. Position: Charge hand

Duration: Dec 2000- Jun 2002 (2 years)

Company: Hitachi plant Co.LTD

Company Industry: Steel PLANT

Location: Ain Sukhna

Country: Egypt Afreca

Department: piping

Job Description:

RECEIVED instruction from the superior for the construction of piping works activities

13. Position: Steelworker

Duration: Jul 1999 –Oct 2000 (1.3 years)

Company: Mohammad Al Mojil group

Company Industry: Energy (electrical power& petroleum)

Location: Jubail K.S.A

Country:

Department: piping

Job Description:

RECEIVED instruction from the superior for the construction of piping works activities

EDUCATION

Highest Education Second Highest Education

Education Level: Post Graduate Diploma/ Mater’s Degree High School Diploma

Education Field: Engineering (Petroleum/Oil/Gas) Engineering (Mechanical)

Course: Associate in Industrial Technology High School Grad

School/University: CHMSC D.M.L.M.H.S

Location: TALISAY CITY NEG OCC Bacolod City Neg. Occ

Date: June 1991 – Nov 1993 May 1987 – April 1990

SKILLS

Skill Level of Proficiency Remarks

1 piping supervisor can perform both piping and mechanical works

2 piping foreman can perform piping works, and also structural works.

Structural foreman,

Mechanical foreman

3 PDS/PDMS, isometric general arrangement

TRAININGS/SEMINARS

Date Topic/Course Title

Nov 5, 2010 – Nov 25, 2010 Foremanship Course TUV NORD Germany

Noel S. Remonde

ARCC/EEI Construction Co. LTD

Permit to work Training

First Aid Course

HS Induction Training

H2S Training and sea survival

Confined spaced Training Course

LANGUAGES SPOKEN

Proficiency

Level

Language (5=Excellent;

1=Poor)

1. English, Tagalog 3

Arabic

AVAILABLE DOCUMENTS

Passport

Number: EC 4543737 Expiry Date: June 28, 2020

Place of Issue: DGA Bacolod City Date of Issue: June 29, 2015

REFERENCES

Joseph JalinoOctoso Piping Foreman

AL RUSHAID CONSTRUCTION CO. LTD.

Tel. No. (03) 8980028-(03)8674049

Email: adh6nj@r.postjobfree.com

Relationship: employer

Joseph JalinoOctoso Group Leader

GAMA Almoushegah Arabia Ltd.

Tel. No.: 038981972-024250782

Email: adh6nj@r.postjobfree.com

Relationship: employer



Contact this candidate