Post Job Free

Resume

Sign in

QC INSPECTOR.

Location:
Sharjah, United Arab Emirates
Salary:
8000
Posted:
November 26, 2020

Contact this candidate

Resume:

SENIOR QC INSPECTOR

Full Name: SHADAB KHAN

Address: Mobile Number: Arabian 054*******,international 055******* company. P O Box 6256 Email: Career s.Objective: adh5rw@r.postjobfree.com, adh5rw@r.postjobfree.com Working as SENIOR QC INSPECTOR since September 2009 and gained better knowledge in Welding, Fabrication, Surface treatment, Galvanized and site Erection inspection of structural steel and useful usage of codes

Conduct Key Skills. quality inspection in the Welding section

conduct Conduct Prepare Maintain Visual inspection NDE project welder welder test WPS qualification documents of and welded as prepare per project profile and report test continuity as specification. per codes: report Conduct quality inspection in surface preparation and painting section

Visual inspection Inspection inspection of of dry blasted film of sand surface thickness blasted using using material Testex Elcometer press and ensure –o-456 film project requirement

Conduct salt test by Elcometer 138 Bresel Salt Kit

Inspection of atmospheric condition using Elcometer 319 Conduct Visual quality inspection inspection of painting in fabrication Area

Inspection of steel structure using assembly drawing

Inspection of miscellaneous items like ladder, handrail. Education Preparation & Training of traceability report From-UAE To Course/Grade Institute/University

B.GAS-CSWIP GRADE 2

TWI

INDIA

Diploma in mechanical engineer.

KCT Polytechnic College

INDIA

UAE One-year Diploma in quality control Rastriya Technical Institute. Level II (RT, UT, MPT&LPT

ASNT NDT

Work Experience

From-INDIA To Job Position Company Name

Sep2009toOct2011

Qc inspector

Barauni Petrochemical & Oil Refinery

Ltd

Main Preparation Material Monitoring Prepare documentation. Attending ordination Comprehensive ASME, Preparation Inspection Ensure Maintaining Verification Inspection Supervise Maintaining Updating Reviewing Preparation Duties ASTM, that Inspection detailed weld completeness tool and with Performed: storage and and of approved of of and daily the etc. DPR monitor pipe box Quality and the verifying clearance knowledge calibration reviewing record weld of documents and client NDE meetings supports materials. Procedure Test Plans, the control of and summary for NDT of Piping-about NDE Certificates of technical reports fit report and as Inspection and test reports. up summary per and System and maintaining engineering monthly and packages. of of and approved PWHT discrepancies. test ITP all weld Verification. and ensuring and inspections packages. and are progress activities visual conform quality used visual Test inspection drawings. the of Plans, construction. review inspection records. it piping conducted as calibration according per codes, Work as meetings ITP per reports. Instructions standards at and to of ISO. site P testing & client with ID and and & specification. equipment’s. higher maintain specifications and Isometric formats. officials the Drawing. Quality by and Co- control RAK (UAE)

DEC’ 11 till date

SENIOR QC INSPECTOR

ARABIAN

INTERNATIONAL COMPANY

Main Duties Performed:

Preparation Pre Check Updating Daily Day coordination Responsible out Coordinate technique All Perform ensure kind as job to inspection per and proper day Evaluation of material with international quality record planning all of to and the storage PQP(ensure the to witnessing atmospheric documentations latest receiving Tests maintain project NDT and and that standards. revising for coordinating team material quality the Painting high inspection the conditions quality operations inspection of quality and Plan)Project preservation Systems its QA/work of,ITP(jobs prior maintenance. plates, Specifications QC with including Inspection and and activities, to Customer. is compatibility starting quality beams, complied preparation and preparing or deliverables channels, painting Client’s test with to Plan) project Specifications operation revising Inspection of angles, of procedure, structural specifications. flanges, reports, requirement’ selection activities bolts NDE and reports are of nuts, suitable carried etc.and, Welder qualification, WPS preparation.

Start the Control approved out All Perform Responsible kind client. as to per of end of material for quality quality monitoring to construction ensure of documentations receiving structural that of drawings piping the inspection fabrication quality and and structural its work of maintenance. such plates, and as works fit-beams, quality up, and visual deliverables channels, its documentation and dimensional angles, of structural flanges, and inspection getting activities bolts and approval conforming are nuts, carried from etc.to, ensure proper storage and material preservation is complied with project specifications. Welder qualification, WPS preparation.

Start the Control approved Visual insulation Prepare Action client. to for inspection of end Non-for every quality monitoring construction Conformance violation of of structural welded of and drawings. piping Reports joints out fabrication and of and standard (structural NCR)its such, NDE. Preventive of as construction works Coordinate fit-up, and visual Action its activities. inspection documentation and Request dimensional of (PAR) Heat and inspection and treatment getting initiate approval conforming,coating Corrective from and to PROJECT DETAILS

Abu Carbon Riyadh Kuwait Dhabi Metro National Black International & Project Delayed Petroleum Airport Coker –Clean Project Midfield Fuels Project. Terminal Building (MTB),UAE Socar National SHAH BARAZAN Ammonia GAS Bank ONSHORE DEVELOPMENT of & Kuwait Urea PROJECT- Complex PROGRAM PACKAGE Project -AZERBAIJAN 4. BAHRAIN ALUQLAH AIRCRAFT TADAWEL ADNOC DUQM Sakhalin refinery crude energy NATL CENTRAL MAINTENANCE TOWER-flexibility project. OPF GAS SAMSUNG PROCESSING COMPANY comp project project. HANGARS FACILTY JEDDAH PROJECT Personal Date of Birth: Information 5th June 1988

Gender: Nationality: License Passport Languages Number Known English male Indian UNITED T9121228 (Read, ARAB Write, EMIRATES & Speak) (LMV Hindi LICENCE) (Read, Write, & INDIAN & Speak) LICENCE Civil Declaration Status: MARRIED

I Solemnly declare that all the above information is correct to the best of my knowledge and belief. Date: Signature:



Contact this candidate