Post Job Free
Sign in

Engineer Assistant

Location:
Chennai, Tamil Nadu, India
Posted:
November 26, 2020

Contact this candidate

Resume:

S. SUDHARSAN

**,******** ******,

Arni palayam

Arni-632301 Contact No: 063******** Email: *************@*****.***

OBJECTIVE:

To pursue a career in a firm which fulfill my objectives in life, which include professional excellence and value addition to my career through dedicated work, innovative, perseverance with good team effort and render my best to the organization.

PROFESSIONAL SNAP HOT:

An Associate with over 12 years of experience in supporting manufacturing operations by recommending methods for improvements by conducting Work study, Time study, Implementing standard operating procedures (SOP),proven ability to determine and establish the most efficient methods for Maximum utilization of production facilities and personnel; Line Balancing and Line Management in the development and implementation of New product development (NPD).Improving the process with production facilities and personnel by productivity Improvement tools. Improving Material handling layouts to reduce the lead time of the product,Making current capacity calculations.

EXPERIENCE:

Currently working as an ASSISTANT MANAGER INDUSTRIAL ENGINEERING DEPT in LEATHER CRAFT INDIA PVT LTD at Chennai (13 th Feb 2017 to till date).

PAST EXPERIENCE:

ASSISTANT MANAGER INDUSTRIAL ENGINEERING DEPT in CONSUL NEOWATT SOLUTION PVT LTD at Chennai.

RISING STARS MOBILE INDIA PVT LTD(FOXCONN) at SRICITY (A.P) SENIOR ENGINEER INDUSTRIAL ENGINEERING .

SENIOR ENGINEER -INDUSTRIAL ENGINEERING in YAZAKI WIRING TECHNOLOGY PVT LTD (Wiring Harness) at Chennai.

RABIA INDUSTRIES PVT LTD (KH GROUP) at Chennai (ASSISTANT INDUSTRIAL ENGINEER).

PROFESSIONAL TOOLS KNOWN:

5S

SMED

4M

VALUE STREAM MAPING(VSM)

WHY-WHY ANALYSIS

POKA-YOKE

LEAN MANUFACTURING

RESPONSIBILITIES:

To take time study of the product each and every operation (Labour

Operation time)

To analyze Work study of product in sub assembly & assembly stage part by

Part.

To give equal work to labour with line balancing and increase productivity and

Achieve target, prepare I.E file (Line balancing file)

To design Layout (Product line) of the product

To set Pilot line of the product, Analyze and identify of problem.

To analyze RE ENGINEERING new technique reduce SAH(standard

Allotted hour) of product (Time reduce)

To analyze skill level of product ( SKILL MATRIX), MACHINE

requirement of product

To calculate man power require (Direct & Indirect)for production.

Make capacity calculation and decide the machines for projects

Reduce of cycle time in production line

To find out Bottle neck in line & solve it, Increase productivity of the

conveyor or line

To analyze Kaizen smallest improvement of the product (jig & fixture

prepare)

To analyze Motion study of product (Movement time analysis)

To identify & analyze NVA(Non value added), VA(Value added) in the operations and implementing the cycle time process flow.

To calculate down time & availability of machines

Make Run at rate for assembly lines from PROTO and monitoring at various builds till SOP

Studying customer Engineering drawing & deriving the product requirement

Making PLANT LAYOUT for new projects and layout changes for existing projects

Drafted and designed layout of equipment, materials, and workspace within facilities to maximize efficiency by using Auto-Cad

Reduce waste motion through the proper design of the work environment.

Recommended revision of methods of operation and material handling,alterations in equipment layout to improve productivity.

To make Assembly board Drawing,sub assembly board drawing

Now

Working with JAPANESE KAIZEN PRODUCTION Team and implemented TWO WAY PRODUCTION IN CONVEYOR LINE (Lean Manufacturing)and to get two way out put with single conveyor line

Improve material handling in the plants

Deep ability to define problems, collect data, establishes facts

To analyze process & information flow of the product( VSM)

Eliminate waste through the application of lean practices.

Preparing operating procedure for ( Men,Materials,Machine,Method)

Implementing productivity principles in GEMBA with Workers ergonomics.

Developed and implemented performance standards for Manufacturing operations.

Established production rates and time standards for existing operations.

ACHIEVEMENTS:

Handled and successfully launched SOP for Ford FIGO- DOMESTIC & EXPORTS & Ford Eco sports.

Line balancing for the increased volume of 30% of FIGO Assembly lines without Capital investment.

Improved Ergonomics and reduced work motions in assembly lines.

Introduction of Single piece flow in End of Line.

ACDAMIC PROFILE:

EXAMINATIONS

BOARD/

UNIVERSITY

INSTITUTION

YEAR OF PASSING

PERCENTAGE

%

B.E production Engineering

Anna university

St.peter s Engg college Chennai.

2008

80.33

XII

State Board Tamilnadu

S.S.Hr.Sec School, Arni.

2004

87.2

X

State Board Tamilnadu

S.S.Hr.Sec School, Arni.

2001

92

ACADEMIC ACHIVEMENTS:

Secured 4th place in 6th semester with 84% in Anna university

Secured school 3rd in 10th state board examination

TECHNICAL SKILLS:

M.S office, AUTO CAD

STRENGTHS:

Hard work

Team work

PERSONAL PROFILE:

Name : S.SUDHARSAN

Father s name : R.Srinivasan

Mother s name : S.Pari Mala

Date of Birth : 25.7.1986

Age :33

Gender : Male

Marital Status :Single

Nationality :Indian

Permanent address :59, Arumugam street,

Arni Palayam, Arni-632301

Contact number :063********

E-mail :*************@*****.***

Passport no : Z20064611

Languages known :English, Tamil.

DECLARATION:

I hereby declare that all the above furnished information are true and correct to the best of my knowledge (S.SUDHARSAN)



Contact this candidate