S. SUDHARSAN
Arni palayam
Arni-632301 Contact No: 063******** Email: *************@*****.***
OBJECTIVE:
To pursue a career in a firm which fulfill my objectives in life, which include professional excellence and value addition to my career through dedicated work, innovative, perseverance with good team effort and render my best to the organization.
PROFESSIONAL SNAP HOT:
An Associate with over 12 years of experience in supporting manufacturing operations by recommending methods for improvements by conducting Work study, Time study, Implementing standard operating procedures (SOP),proven ability to determine and establish the most efficient methods for Maximum utilization of production facilities and personnel; Line Balancing and Line Management in the development and implementation of New product development (NPD).Improving the process with production facilities and personnel by productivity Improvement tools. Improving Material handling layouts to reduce the lead time of the product,Making current capacity calculations.
EXPERIENCE:
Currently working as an ASSISTANT MANAGER INDUSTRIAL ENGINEERING DEPT in LEATHER CRAFT INDIA PVT LTD at Chennai (13 th Feb 2017 to till date).
PAST EXPERIENCE:
ASSISTANT MANAGER INDUSTRIAL ENGINEERING DEPT in CONSUL NEOWATT SOLUTION PVT LTD at Chennai.
RISING STARS MOBILE INDIA PVT LTD(FOXCONN) at SRICITY (A.P) SENIOR ENGINEER INDUSTRIAL ENGINEERING .
SENIOR ENGINEER -INDUSTRIAL ENGINEERING in YAZAKI WIRING TECHNOLOGY PVT LTD (Wiring Harness) at Chennai.
RABIA INDUSTRIES PVT LTD (KH GROUP) at Chennai (ASSISTANT INDUSTRIAL ENGINEER).
PROFESSIONAL TOOLS KNOWN:
5S
SMED
4M
VALUE STREAM MAPING(VSM)
WHY-WHY ANALYSIS
POKA-YOKE
LEAN MANUFACTURING
RESPONSIBILITIES:
To take time study of the product each and every operation (Labour
Operation time)
To analyze Work study of product in sub assembly & assembly stage part by
Part.
To give equal work to labour with line balancing and increase productivity and
Achieve target, prepare I.E file (Line balancing file)
To design Layout (Product line) of the product
To set Pilot line of the product, Analyze and identify of problem.
To analyze RE ENGINEERING new technique reduce SAH(standard
Allotted hour) of product (Time reduce)
To analyze skill level of product ( SKILL MATRIX), MACHINE
requirement of product
To calculate man power require (Direct & Indirect)for production.
Make capacity calculation and decide the machines for projects
Reduce of cycle time in production line
To find out Bottle neck in line & solve it, Increase productivity of the
conveyor or line
To analyze Kaizen smallest improvement of the product (jig & fixture
prepare)
To analyze Motion study of product (Movement time analysis)
To identify & analyze NVA(Non value added), VA(Value added) in the operations and implementing the cycle time process flow.
To calculate down time & availability of machines
Make Run at rate for assembly lines from PROTO and monitoring at various builds till SOP
Studying customer Engineering drawing & deriving the product requirement
Making PLANT LAYOUT for new projects and layout changes for existing projects
Drafted and designed layout of equipment, materials, and workspace within facilities to maximize efficiency by using Auto-Cad
Reduce waste motion through the proper design of the work environment.
Recommended revision of methods of operation and material handling,alterations in equipment layout to improve productivity.
To make Assembly board Drawing,sub assembly board drawing
Now
Working with JAPANESE KAIZEN PRODUCTION Team and implemented TWO WAY PRODUCTION IN CONVEYOR LINE (Lean Manufacturing)and to get two way out put with single conveyor line
Improve material handling in the plants
Deep ability to define problems, collect data, establishes facts
To analyze process & information flow of the product( VSM)
Eliminate waste through the application of lean practices.
Preparing operating procedure for ( Men,Materials,Machine,Method)
Implementing productivity principles in GEMBA with Workers ergonomics.
Developed and implemented performance standards for Manufacturing operations.
Established production rates and time standards for existing operations.
ACHIEVEMENTS:
Handled and successfully launched SOP for Ford FIGO- DOMESTIC & EXPORTS & Ford Eco sports.
Line balancing for the increased volume of 30% of FIGO Assembly lines without Capital investment.
Improved Ergonomics and reduced work motions in assembly lines.
Introduction of Single piece flow in End of Line.
ACDAMIC PROFILE:
EXAMINATIONS
BOARD/
UNIVERSITY
INSTITUTION
YEAR OF PASSING
PERCENTAGE
%
B.E production Engineering
Anna university
St.peter s Engg college Chennai.
2008
80.33
XII
State Board Tamilnadu
S.S.Hr.Sec School, Arni.
2004
87.2
X
State Board Tamilnadu
S.S.Hr.Sec School, Arni.
2001
92
ACADEMIC ACHIVEMENTS:
Secured 4th place in 6th semester with 84% in Anna university
Secured school 3rd in 10th state board examination
TECHNICAL SKILLS:
M.S office, AUTO CAD
STRENGTHS:
Hard work
Team work
PERSONAL PROFILE:
Name : S.SUDHARSAN
Father s name : R.Srinivasan
Mother s name : S.Pari Mala
Date of Birth : 25.7.1986
Age :33
Gender : Male
Marital Status :Single
Nationality :Indian
Permanent address :59, Arumugam street,
Arni Palayam, Arni-632301
Contact number :063********
E-mail :*************@*****.***
Passport no : Z20064611
Languages known :English, Tamil.
DECLARATION:
I hereby declare that all the above furnished information are true and correct to the best of my knowledge (S.SUDHARSAN)