Post Job Free

Resume

Sign in

Engineer Electrical

Location:
Chennai, Tamil Nadu, India
Posted:
November 26, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

ABDUL KALEEL AKBAR

No.*, Shantipuram

2nd Street, Thirumullaivoyal, Chennai

Mobile: +91-735*******/ 988-***-****

Email: adh5g4@r.postjobfree.com

Professional Summary

●Leading team in a multi-discipline task.

●300 /132/33/11KV MV/HV Construction of Substation Projects.

●Supervising Testing and Commissioning of substation Equipments.

●Decisiveness, Interpersonal to maintain effective schedule of working teams.

●Electrical study and calculations to offer guarantee period for Substation Equipment.

●Demonstrative skill building & leading multi-disciplinary teams

●Contract document review & management of Sub-station Project schedules.

●Project planning & ability to maintain men,material and workmanship standards.

●Maintain Quality,Integrity and standards in project management.

Skills

Materials Management Microsoft XL,Word,Office Site Management

Prot.settings Problem Solving Project Handling

Power calculations

Experienced to lead small teams in a multi-discipline task force-based engineering environments,

Proven expertise in FEED and EPC including Field Engineering in Project execution

Detailed knowledge in the Electrical discipline towards the following technical aspects of projects

Electrical principles Codes of standards and their application Transmission & Distribution in Electrical network.Safety systems, protection and control. Classification of Areas Electrical studies and calculations

Plant design and equipment layout Preparation of BOM, as per Specification, evaluation to procure the power equipment, spare materials and accessories. Coordinate with vendors for the procurement and with all terms of payment and period of supply.Review and approve supplier documentation

Factory acceptance testing, construction and commissioning support to Facilitate work share project execution with associated offices.

Fully conversed with Company procedures, technical work practices, working policies.

Updating the latest tech. advancements and best practices within the electrical,specifiation.

Continuation of the professional development adopted in Technical Training Program.

Education

High School Certificate, Rama Samy Mudaliar Higher Sec.School,Chennai,India. April,1971.

Pre University Course,The New College, University Of Madras, Chennai, India. April,1972..

B.E Bachelor of Engineering, CIT, Coimbatore, India, University of Madras. April,1977.

Affiliations

Member of Kuwait Society of Engineers.

Member of International Association of Engineers.

Certifications

MEW/Kuwait Switching Authority Test Cleared & qualified for Switching Operations of live EHV Substations and Equipments in Aug 1998.

ARAMCO, K.S.A, Safety Test cleared to take up Hot & Cold Permits May.1979.

Work History

Ministry of Electricity & Water, Kuwait . Dec 1997 to June 2014

Senior Consultant / Transmission and Electrical Networks.

Responsible for Erection, Testing and Commissioning of 300/132/11 KV

GIS, S/Stns. with Power Trs.SF6-Swgrs.andchemes.

Familiar in Cont.& Prot. Batteries, Chargers, Relays.

●Power Trafos. Main Protection Differential Relays : P631-Alsthom, 7UT61-Siemens,

●Restricted Earth Fault Relays. : MCA614-Alsthom, 7SJ602-Siemens,

●O/C & E/F Relays (Directional). : P127-Alsthom, 7SJ62- Siemens,

●O /C & E/F Relays (Non-Directional). : P121-Alsthom,7SJ600 & 602- Siemens,

●Bus-Bar Protection Relays. : INX2,INX5 & REB500(New)ABB

MBCZ10/20-AREVA.

●Pilot wire UG-Cable Differential Protection Relays. : Solkor R / RF-Rayroll,

●Distance Relays(OHL Protection) : 7SA52-Siemens,RELL-511&LZ-96A-ABB

●Familiar in Contract payments terms.waranty Maintenances.

●Monitoring all activities of the project as per schedule.

●Preparation of Project Flow charts, Progress Reports. and time schedule.

●Overseeing entire Project work at ongoing sites for Quality management.

●Planning for budget with all aspects of Project.

●Coordination with management, interaction, Initiation, planning, execution, monitoring, and control.

●Maintaining Quality on all relating to projects, from initial cost.

●Conducting feasibility studies to estimate materials, time and labour costs.

●Tender and Contract negotiations.

●Evaluation and check measurement of all completed projects.

●Preparation of project including details of quantities of materials

●Feasibility studies of client requests.

●Analysing completed works and Contract payment process.

●Allocating work to contractors site visits, assessments and projections for future work

●Estimating the value of project.

●Negotiations with suppliers on both technical and cost aspects of product.

●Maintaining ISO documentation, Manufacturers Data Bank records.

●Review materials for Quality& quantities.

●Advising in compiling of tenders making Pre-Qualification documents, both standards and project quest.

Tamil Nadu Electricity Board, Madras, India August 1979 to December 1997

1.Asst. Engineer Operation & Maintenance (LT Distribution). (August 1979 to May 1982)

●Responsible for Erectn.Testing & Comm.of substation projects.

●Monitoring site & responsible for power equipment Erection and Testing.

●Responsible for O & M Pri.SubStation,Transmission Electrical Networks.

●Providing Training for Engrs. and Technicians.

●To carryout periodic QC check on all electrical units of ongoing projects.

●Evaluate to validate all procured materials for new Substation project for QA.

2.Engineer / Sr. Instructor / Tech. Training Centre (June 1982 to February 1990)

●Responsible for providing Training to Engineers and Supervisors.

●Responsible for finding hazards of electricity and need for electrical safe work.

●Detection of Electrical System faults due to overload earth faults etc.

●Excellent technical and analytical skills

●Decisiveness, independence, good judgment, ability to work under pressure

●Ability to guide Project Management Team

●Good manager of people and resources to obtain best results

●Demonstrated skills in building, mobilizing, and leading multi-disciplinary teams

●Ability to guide the Project in implementing and achieving it’s QA/QC

●To Present and promote the Quality Assured Substation project at national and international meetings.

●Reliable in delivering own parts of the work as part of a team effort

●Demonstrates excellent project planning skills to manage complex, ever-changing environments developing, implementing and monitoring projects in the energy and environment sector

●Demonstrates integrity and ethical standards;Promotes the vision, mission, and strategic goal achievements. Line Diagrams Measurements checking current and Voltage levels

3.Sr. Construction Engineer / Electrical,

EHV S/Stn. construction Department. (February 1990 to October 1997)

Responsible for Erection, Testing and Commissioning of 110/33/11 kV Sub/Stn. including Power

Trfos, Switchgears protection.

●Planning, coordination and implementation of the activities of relevant projects;

●Responsible for Staff Training in control & trip wiring fault detection and rectifications. Further

● SF6 – GIS Breaker Operation and Maintenances Earthing Interlocks, Light Voltage and Primary Injection of Busbar Systems CT/VTs, NER.

●Monitoring effectively and closely to track work plan and take corrective action any time lags.

●To develop and finalize Terms of references to undertake project activities

●Commissioning activities like research studies, state level assessments, training workshops etc. and manage the operational aspects of procurements.

●Manage to follow contracts with Contractors if any potential risks suggest its mitigation measures.

●Ensure contract management and interim payments to contractors against invoices.

●Taking corrective action whenever required to meet target.

●Ensure effective financial management and folowed as per the contractual financial guidelines

●Facilitate and participate in the periodic review meetings and discussions related to project implementation, monitoring,follow-up and to supervise the work of team members

●Supporting development of strategies.

ARAMCO, Abqaiq-KSA, Jan 1979 – Jun 1979 Engineer (Basic Operator)

●Responsible for new installation,Maint & replacement of any defective units in refinery,naptha,Log

And gas plants.

●Electrical Distribution Powerlines and equipments Installation, Erection, Testing & Commissioning, Substation in Oil Gathering Centers, HV/LV Trs & Switchs with Distribution.

●Installation, Erection, Commissioning, Testing of low voltage & high voltage induction motors.

Tamil Nadu Electricity Board, Madras, India, Dec 1977 – Dec 1978

As Graduate Apprentice

●Trained & gained practical experience in Erection, Testing & Maintenance.

●Sub-station equipments, HV/LV Switch gear, Trafo's & CB's of different ratings along with control & Protection circuits.

●Testing & Commissioning of Substation, Power transformers, Circuit breakers, Protective Relays.

Additional Informations:

Date of Birth: 5th Feb.1953

Driving Licences: Valid Kuwaiti and Indian Licences.

Languages: English,Tamil, Arabic, Malayalam, Hindi and Urudu.

Hobbies: Reading, Listening music, and Travel.

Passport: Indian Passport No.R0937479/valid up to 02/07/2027.

Declaration:

I hereby declare that the above particulars furnished by me are true to the best of my knowledge and belief.

ABDUL KALEEL AKBAR



Contact this candidate