Post Job Free
Sign in

Manager production

Location:
Ballwin, MO
Posted:
November 25, 2020

Contact this candidate

Resume:

Curriculum Vitae

Name Abdelhamid Farrag Hammad

Nationality Egyptian

Address ** * ** ******* **. Elrawda Cairo

Tel 002*-******** Egypt

Mobile 002***********

Last position Vice President Operation – SESAB International for Industry & Contracting Co. Jeddah - KSA

Qualification:

Bachelor degree in metal work – Helwan University –

Faculty of applied Arts 1964 (very good) Metal works

Training course in CHZCOSLOVAKIA 1972 in planning & factories management

Experience: -

More than 30 year experience in the field of Projects management, fabrication and installation of steel constructions, oil & gas projects, storage tanks,. . . etc, Supervise on-site scheduling, material control and day to day direction on site administrative staff, Ensures all project staff and subcontractors to execute construction tasks conform to rules, safety, and in accordance with the designed budget and schedule, cost control and analysis, long and short plan

Mmajor positions occupied: -

-Sales & Marketing general manager, Factories sector director ( Engineering enterprises for steel works STEEL.CO ) Egypt

=Strategic Planning & Cost control manager ( ENERGYA – AL Sewedi Egypt & KSA)

-VP Operation ( Planning, Cost estimation, Cost & Budget control, Production. Maintenance & Material handling) HIDADA - KSA

-Project manager ( Al Hadjar Steel complex with ATKENS group– Algeria )

- Vice President Operation at SESAB International for industries & Contracting – K.S.A

Detailed experiencies

1 – The Engineering Enterprises for Steel Work Co. (STEELCO) –

One of the leading governmental companies in Egypt in the steel structure fabrication & Erection, high rise steel building towers, storage tanks, factories equipment fabrication . . . etc for 23 years as follows: -

Planning Manager (5 years)

Production Manager (5 years)

Sales & Marketing general manager (4 years )

Head of Project Management for the construction of Ameriya cement project & Aluminum Complex - Egypt

From 1994 to 1996 as Factories Sector Director, responsible for running 4 factories (ALMAZA, HELMYA, EGYMET, TANTA) from all aspects. Technical, Finance, Costing …reporting directly to the chairman

2– Working in Algeria from 1976 to 1979 with the following companies: -

* Society National De Construction Metalique S.N.Metal as production & planning manager for 2 Years

* Society National De Siderurgie S.N.S in projects management division for 2 years (through ATKENS group) supervising & follow up the construction of blast furnace 2, rolling mill achieving agreed targets, long and short term scheduling, material control, monitoring and preparing progress reports and follow up subcontractors

3 – Hidada LTD in Saudi Arabia (Steel structure fabrication, Storage tanks, Port cranes, Petrochemical projects, Industrial buildings, Gas & Oil structures, Refineries, Grating, Heat exchangers, Pipe racks for gas projects, maintenance. . . etc 13 years) from 1988 to 1993 and from 1996 to April 2004 occupying the following positions Successively

Cost estimation manager

Planning & Material handling manager, Business plan

Preparation of projects budget & Budget cost control, planning and scheduling

Control and supervising of galvanizing plant

Senior operation manager for all Hidada plants

(Towers, Poles, Structure steel, Storage tanks, Grating &

Galvanizing )

3 Sesab International for Industries & Contracting Co. Saudi Arabia From September 2004 to September 2005 and from 2007 to 2009 for Fabrication & Installation of industrial buildings, Refineries, Oil & Gas projects, Pipe racks, Power stations, Grating, Turnkey projects

4Business plan preparation, develop standard operating procedures for the production process and adhering to them, co-ordinate with maintenance department for keeping the machinery in running condition at all times, control the wastages, train the local staff, preparation of Long & Short term plans, Estimation, Sales & Marketing, Production. Projects management and follow up contracts & subcontractors

Back again to SESAB Nov 2011 / 2013 as Vice President Operation

5 – Arabian International company For Steel Structure A.I.C Ras El khaiyma Factory UAE 2006 as Operation manager responsible for Factory structures & machinery installation, business plan preparation, manpower plan and training, running Production to meet the targeted plan. Preparation of production reports, Treatment, Long & Short Planning schedules, Maintenance, From January 2006 up to December 2006

6- Energya Steel -Hesham Helal Elsewedi Egypt / KSA

From Sept.2009 to October 2011 as:

a)Strategic Planning & Cost control Manager 10th Ramadan factory, develop quality and workmanship standards, ensure projects are executed within the contract budget and agreed time schedule

b) Relocated as Deputy G.M. Operation, for Energya complex at Rabigh KSA. Managing all operation activities as long & short term plan, projects budgets and cost control, Production, Galvanizing

Abdelhamid Farrag Hammad

adh4wb@r.postjobfree.com

Mob No : 002***********

November 2015



Contact this candidate