Name: JOSEPH B. MANINANG
Address: BLK ** Rambutan St. Samagta Floodway Taytay,Rizal (PHIL)
Mobile No. +639*********, +639*********
Email: adh4a5@r.postjobfree.com
POSITION DESIRE :RIGGER
Work Experiences:
Company: LEIGHTON QATAR
Address: Doha Qatar
Project: MEGA RESERVOIR (KHARAMAA PROJECT)
Period Covered: Dec. 28, 2017 To Nov. 11, 2019
Position: Rigger foreman
Job Description:
1.Work permit receiver.
2. Safety tool box meeting.
3. Check the levelness on ground and solid before set up the crane.
4. Check the working area and barricade or put signage in the lifting area.
5. Piping work; erection of pipe 2.2 mtr. Size, erection of blind pass elbow and gate valve.
6. Structural work, erection colum, beam and trusses.
7. Civil work, Erection and dismantling shatter steel colum, steel rebar and lifting other materials.
Company: Samsung Company
Address: Saudi K.S.A
Project: Refinery
Period Covered: July 12, 2014 To August 10, 2017
Position: Rigger III
Job Description:
1. Check permit before start working.
2. Safety tool box meeting.
3. Check the levelness on ground and solid before set up the crane.
4. Check the working area and barricade or put signage in the lifting area.
5. • Erection of pipe in pipe rack • Erection of bollard post and barrier
• Erection of pipe support • Erection of shatter and colum
• Erection of beem and trassess • Erection of manhole cover
Company: DAEWOO
Address: Papua New Guinea
Project: L.N.G
Period Covered: Feb, 13 2013. Up to Nov, 3 2013.
Position: Rigger
Job Description:
1. Check the working area and the levelness of the solid ground before
Setting of the crane.
2. Put the barricade and warning device in the working lifting area.
3. Check the lifting gear of all used Rigging material and check W.L.L
Or used color coding.
4. Tool Box meeting. Supervisor, Crane Operator, and Rigger, About the lifting
Working procedure before start working.
5. • Erection of pipe in pipe rack • Erection of Filter House
• Erection of Valve • Erection of Pipe Support
• Erection of Lube Oil Tank
Company: H.L.G; Al-Habtoor, LEIGHTON Group.
Address: NadheeRayyan St. Old Rayyan Doha Qatar P.O BOX 32316.
Project: Al Shaqab Equestrian Centre and North Gate Mall.
Period Covered: Oct, 11, 2007 to Dec, 16, 2012
Position: Rigger Chard hand and Operator Forklift, Man lift and Tele handler.
Job Description:
1.Erection of Chilled pipe
2.Erection of StracturalTrasses and Beam
3.Erection A.H.V Generator, Panel Board and Motor pump
4.Erection and Dismantling shatter and Colum
5.Unloading and Loading all Heavy equipment material and Cable drum wire
6.Has a Chardhand Rigger, Good Communication to all staff, Superior and to my Co-worker and Safety first before lifting materials
Company: E.E.I Phil.
Address: Libis, Quezon City (PHIL)
Project: Shangrila Twin tower, Quezon City
Period Covered: Nov. 23 2006 to Oct. 12 2007
Position: Rigger
Job Description:
1.Fly out Table form and Erection of Table form
2.Erection of Shatter and Colum
3.Erection of Platform and Steel Colum
4.Erection of StracturalTrasses and Beam
5.Erection and Dismantling Tower crane
6.Unloading and Loading all Heavy delivery materials
Educational Background:
High School: SEGRIO OSMEÑA HIGH SCHOOL
Date Graduated: 1983 to 1988
Elementary: MAY PAJO ELEMENATARY SCHOOL
Date Graduated: 1978 to 1983
Personal Data:
Date of Birth: June 20, 1972 Pag-IBIG No: 121*-****-****
Place of Birth: Caloocan City PhilHealth No: 19-026456380-5
Civil Status: Married NBI: M555FJTH27-MA941851
Religion: Catholic
Height: 5’ 6”
Weight: 140lbs.
Name of Spouse: Corazon Aguirre Maninang
No. of Children: Four
Passport: EC8461717
SSS: 331-***-****
I hereby certify that all information stated here are true and correct to the best of my knowledge and Belief.
Joseph B. Maninang