Post Job Free
Sign in

Engineer Machine

Location:
Vasant Nagar, Karnataka, India
Posted:
November 24, 2020

Contact this candidate

Resume:

RESUME

N Nikhil

S/O N G Naik

Sri Basaveshwara Nilaya mail ID: **********@*****.***

2nd main road

Rangatha nagara mobile – 776*******

Harohalli (T) 701-***-****

Dist- Ramanagara (D)

Karnataka

OBJECTIVE:

Looking forward for a Challenging and Significant Career, to Work in Professional Environment Where I can enrich my Skills and Work towards the Organizational goals.

STRENGTHS:

Have good analytical and decision making ability. Dedicated to Profession and highly motivated towards success & achievement. Have the ability to complete given task. Positive attitude, friendliness and flexibility to achieve success in job.

Summary:

Industrial engineer with +2 year experience in developing new assembly lines for new products by planning new jigs & fixtures, planning man power by doing cycle time study & method study, preparing work instruction & training the operators, preparing layouts, process flow charts & ramping up the production based on the requirement. Reducing assembly cost & increasing productivity by implementing automations or semi automations, improving the process by altering jigs and fixtures & Improving material handling techniques and operator ergonomics.

Skill Sets:

MOST Analysis: With respect to Cycle time reduction, Cycle time improvement, Productivity Improvement.

Standard data development and conducting time studies

Cost analysis, return on investment, and cost estimating skills for analyzing alternative solutions

Methods improvement skills

Proficiency in doing investigations and root cause analysis

Leadership - managed team of 5 five agents for system implementation.

Computer skills- Good with MS Excel, MS word for general data updates and layout preparations.

Process optimization- Show willingness to learn new procedures and encourage others to undergo training on new procedures.

Problem Solving - improved workflow to increase productivity by 10%.

Lean manufacturing- Built plant lean culture by influencing, collaborating and communicating with all levels of employees . of employees

Project Management.

Educational Profile:

Aug 2013 - Jan 2017

Vishveswarayya Institute of Technology,

KVGCE, Sullia

June 2011 -May 2013

PUC in PCMB, RTES PU college, Ranebennur.

1st class with 62.6 %.

Pre-university oard

Apr 2010 – Apr 2011

10th, Rotary English Medium School, Ranebennur.

1st class with 80.64%.

Karnataka State Board

Experience:

2017- Present

Industrial Engineer

Micro Plastics Pvt Ltd

Project 1

Designed & developed the assembly production line for the volume of 20k assembly per shift.

Prepared work instructions, process flow chart and assembly line layout and trained the respective operations.

Reduced 10% of cycle time & work stations by integrating operations with the help of fixture.

Implemented semi-automatic screw assembly machine and reduced cycle time by 63% which reduced the assembly cost by 9% per product.

Implemented semi-automatic laser etching machine for the purpose of date coding instead of manual punching which reduced the cycle time by 85% which reduced the assembly cost by 6% per product.

Implemented semi-automatic inkjet printing machine instead of manual stamping & label application which reduced the cycle time by 80% which reduced the assembly cost by 2%.

By implementing various other materials handling techniques, reduced the assembly cost by 19% per product & increased the productivity by 20%.

KANBAN Project

Successfully Implemented Kanban system for the product including assembly & moulding production.

Made the bin standards for all the parts of the product as per the production per shift from the moulding.

Made the layouts for the storage of parts with location identified for each part.

Designed the KANBAN cards for the respective parts.

Trained the operators about the system.

Simultaneously handled both projects at a time.

Mega Motostryke Project

Developed the assembly process according to the requirement.

Highlighted the quality requirements like CTQ & CTS for the products.

Did method study for the product, identified critical operations & developed the fixtures for assembly operations.

Made the work instructions for each operations with respect to the quality requirement.

Took the cycle time of each operation & set the standard time with respect to takt time.

Calculated the man power requirement & assembly cost based on the requirement of customer.

Identified & marked the supermarket for storage of A- Class, B- class & C- Class materials for the daily production.

Designed the layout according to the production requirement as per the process flow of the product.

Identified & cleared the bottle necks & attacked on the problems regarding process, quality & operation.

Identified critical operations which can be automated & implemented screw assembly automation.

Based on the availability of the machine, planned for the shift wise production.

Optimized all the operations & handed over the line to production.

Grenade launcher Project

Designed & developed the assembly line layout with respect to the production numbers.

Developed a launching fixture as per the customer requirement.

Developed fixtures & jigs and redused 10% of cycle time by implementing the efficient assembly method.

HOBBIES: Playing Cricket, Chess, Badminton, Listening Music, Social Works.

PERSONAL PROFILE

Name : N Nikhil

Father Name : N G Naik

DOB : 26-01-1995

Sex : Male

Marital Status : Single

Mother Tongue : Kannada

Language Known : English, Hindi

Religion : Hindu

Nationality : Indian

DECLARATION

I am very Much Confident of my Skills to work in a Team.

I Hereby Declare, that all the above given Information are True to the Best of my knowledge.

PLACE: BANGALORE. Yours faithfully

DATE : 07/10/2020 (N Nikhil)



Contact this candidate