CURRICULAM VITAE
TRINADHARAO.M
Chinamushidiwada, Pendurthi,
Visakhapatnam -530051 (A.P). Mail: adh3e6@r.postjobfree.com
Cell no: 091********,
Aspiring for an exciting and challenging career in an organization that exploits my skills and would help me to contribute maximum
ACADAMIC QUALIFICATION
2008-B.Tech. (Electrical & Electronics Engineering) from J.N.T.U Kakinada, Al-Ameer College of Engineering and IT, Visakhapatnam.
2005-Diploma (Electrical and Electronics Engineering) from State Board of Technical Education and Training, T.P.Polytechnic, Bobbili.
2002-S.S.C from Board of Secondary Education, Mahathi Model High School, Gopalapatnam, Visakhapatnam.
2015-33KV Electrical supervisor’s certificate from Govt of A.P Electrical board.
COMPUTER PROFICIENCY:
Well versed in MS-Office, good understanding of internet tools.
EXPERIENCE PROFILE
1. Company Name : SUN INFRATECH
Project : Utilities
Duration : 1st June 2018 to Till to Date.
Designation : Sr.Electrical Engineer.
2. Company Name : SAKKUJA MALLICK & ASSOCIATES
Project : DRDO
Duration : 1st Jan 2017 to 31st May 2018 (1.5 Year).
Designation : Sr.Electrical Engineer.
3. Company Name : BSCPL INFRASTRUCTURE LIMITED
Project : Simhapuri Express Way limited, NH-16, Prakasam, A.P.
Duration : 1st Feb2011 to31st Dec 2017 (6+ Years)
Designation : Asst.Electrical Engineer.
4. Company Name : BSCPL INFRASTRUCTURE LIMITED
Project : XL Group India, SH-31, Madhya Pradesh.
Duration : 26th June’2008 to 1st Feb 2011 (2+ Years)
Designation : Jr. Electrical Engineer.
RESPONSIBILITIES
Internal and external electrification works.
Operation and maintenance of desalination and STP plants.
Road tunnels electrification works.
Installation testing commissioning of fire fighting and pressure testing works.
Operation & Maintenance of 33KV/440 v,11KV/440 v by using 3.15 mva,500KVA,315kva,100 KVA,63 KVA,25 KVA,16 KVA Transformers.
Testing, Operation & Maintenance of 11 KV/440 v Package substations (PSS).
Periodical maintenance of transformers and batteries (U.P.S).
Maintaining the log sheets for load details of all incoming and outgoing lines.
Installation, Testing, Commissioning, Maintenance of plants total Electrification works as per drawings (crusher plants, wmmplants, cp-30 concrete plants, D&G Plants).
Installation, operation & maintenance of toll-plaza electrification work’s are as per approved SLD.
Installation, operation & maintenance of street lighting and high mast lighting electrification works.
Installation, Testing, Commissioning, Operation and Maintenance of Generator sets (Up to 500KVA).
Synchronizing operation of two similar Generators sets.
Installation, Testing, Commissioning, Maintenance troubleshooting of Power Control Centre (PCC), Motor Control Centre (MCC) and their associated switchgears and starters. 415V PMCC and MCC switch boards.
Testing of motors (earth test, insulation, and continuity, efficiency under no-load and full-load).
Installation of electrical equipments ( Motors, Generators, Transformers, Meters, Relays, Panels like MPCB,MCB, Control, Distribution, Instrumentation and lighting panels ).
Installation of cable tray, conduit (PVC), cable glanding, junction boxes, push button, home runs for lighting and distribution boards.
Laying of power, control, and instrument, fire-alarm cables by cable trays, trenches, conduits and underground.
Instrumental in laying, glanding, crimping and termination of L.T & H.T Cables.
Earthings of Generators, Motors, L.T Panels and Lighting panels.
Industrial lighting and aviation lamps installation.
Planning and scheduling of site activities and preparation of the reports.
Executing works and coordination with management follow up all safety aspects in every moment of works for company in achieving its goals.
Preparation of estimates analysis and purchase orders.
Developed and updated planning studies and maintained master plans for utility improvements
Coordinated interconnection issues with other utilities for distribution level wheeling
Reviewed submitted engineering designs for conformance with adopted master plans
Established engineering design guidelines for staff.
Developed and maintained material specifications and construction standards.
Supported and directed substation technicians in testing, troubleshooting, maintaining, and upgrading systems and RMU's.
Coordination with consultant, client and sub-contractors for timely completion of all project activities
SUMMARY:
Planning and scheduling of site activities and preparation of the reports.
Coordination with consultant, client and sub-contractors for timely completion of all project activities.
Executing works and coordination with management follow up all safety aspects in every moment of works for company in achieving its goals.
Preparation of estimates analysis and purchase orders.
Review of Drawings and specifications of High voltage protection equipment’s.
Supervision of Electrical construction and pre commissioning.
.
PERSONAL DETAILS
Name : Trinadha Rao. Mukka
S/O : Paradesi.M
Date of birth : 05th August’1987
Gender : Male
Nationality : Indian
Marital status : Married
Passport no : Z3166607
Languages Known : English, Telugu &Hindi
DECLARATION
I, the undersigned certify that to the best of my knowledge and belief these data correctly describe my qualification.
M.Trinadha Rao.