CURRICULUM VITAE
LANKA AVINASH Mobile No: 779-***-****,703-***-****
Email : ********@*****.***
Skype: lankaavi
Candidate Name : L. AVINASH
Date of Birth : 27-APRIL-1989
Total work experiance : 10 YEARS & 03 MONTHS
Nationality : INDIAN
Known languages : TELUGU, ENGLISH, TAMIL & HINDI
Marital Status : MARRIED
Permanent Address : L.AVINASH,
S/O. L. RAMA MOHANA RAO,
DOOR. NO : 1-1-76, AKKIREDDYPALEM,
B.H.P.V. POST, VISAKHAPATNAM – 530012,
ANDHRA PRADESH ., INDIA.
Passport Details
Passport No : Z4105019
Issue on : 07/04/2017
Expiry on : 06/04/2027
EDUCATIONAL QUALIFICATION
DIPLOMA ELECTRONICS & COMMUNICATION ENGG
COMPUTER KNOWLEDGE
MS OFFICE.
AUTOCAD.
AWARENESS OF NATIONAL & INTERNATIONAL CODE
SAES (Saudi ARAMCO Engineering Standards)
NFPA 70(National Fire Protection Association)
NEC (National Electrical Code)
NEMA (National Electrical Manufacturers Association)
IEC(International Electro Technical Commission) Codes
ANSI (American National Standard Institute)
ISO (International Standards organization)
EXPERIENCE:
Around 10 Years, Electrical QC Inspector in 1.3 Years & Electrical Supervisor in 09 Years, in all type of Electrical Inspections, and Electrical Erection and Testing activates in Oil and Gas and Power Projects. Able to understand the project drawings logic circuit diagrams. Familiarization and understanding of industry code, Familiar with Engineering standards and procedure for Electrical system.
EXPERIENCE IN INDIA & ABROAD:
Electrical QA/QC Inspector
PROJECT : FADHILI GAS PROJECT(SRU)
CLIENT : PETROFAC SAUDI ARABIA LIMITED(ARAMCO)
POSITION : ELECTRICAL QA/QC INSPECTOR (ARAMCO APPROVED)
DURATION : JUL 2018 TO NOV 2019(1.3 YEARS)
ORGANIZATION : NASEER S. AL HAJIRI CORPORATION
DUTIES AND RESPONSIBILITIES:
Responsible for assuring and controlling the work quality as per the approved Procedure, QCP, ITP, and Project Standard, & specifications.
Conduct inspection for electrical work phase based on approved ITP & relevant client standards & specification. These covers Grounding, Conduit, Duct Bank Cable trays, lighting, LV/MV cables, Panels, Transformers, installations
Material receiving inspection as per Material Approved Request and Review of Material test certificates.
Responsible for Preparing and verification of the document like RFIs & test reports on daily basis which are raised by construction team.
Perform site surveillance inspection to ensure all electrical installations conform to latest Drawing and relevant standards &specifications.
Perform LV/MV cable testing before and after installation (continuity, insulation resistance testing &high potential testing, etc….)
Power Transformer Installation and Testing
(Insulation resistance, winding resistance test, turns ratio test, CT polarity test, etc…..)
Motors Erection and Testing (IR Test, WR Test, Polarization Index test, Vibration, etc...)
Switchgears Erection and testing(IR Test, Hi-Pot Test, Contact Resistance Test, Torqueing checking, etc….)
Responsible for the preparation of Quality control procedure & ITP.
For issuing the Non-conformance (NCR) wherever not as per project specification and standards.
Monitor work for compliance to applicable codes, accepted engineering practices.
Checking for Elements of Electrical systems, and acceptance criteria & Issues and cable raceways and power systems units, and Electrical cable tests etc…….
I am maintained all types of QAP, MP, FATs, scope and drawings
Electrical Supervisor & Engineer:
PROJECT : HINDUSTAN PETROLIUM CORPRATION LTD, VIZAG
POSITION : ELECTRICAL ENGINEER
DURATION : FROM DEC 2014 TO MAY 2018(3.6 YEARS)
ORGANIZATION : INDUSTRIAL INSPECTION SERVICES
PROJECT : RAFHA POWER PLANT & BISHA SUBSTATION
CLIENT : SAUDI ELECTRICITY COMPANY (SEC)
POSITION : ELECTRICAL SUPERVISOR
PERIOD : FROM JUN 2012 TO SEP 2014(2.3 YEARS)
ORGANIZATION : SAUDI SERVICES ELECTROMECHNICAL WORKS, SAUDI ARAB
PROJECT : NEW DOHA INTERNATIONAL AIRPORT
CLIENT : MUHIBBAH ENGINEERING (M) BHD
POSITION : ELECTRICAL CHARGEHAND
PERIOD : FROM JAN 2011 TO JULY 2011(6 MONTHS)
ORGANIZATION : CIMAC, QATAR
PROJECT : VIZAG STELL PLANT
POSITION : ELECTRICAL SUPERVISOR
DURATION : FROM DEC 2009 TO DEC 2010(1 YEAR)
ORGANIZATION : M/S SUNRISE INDUSTRIES
PROJECT : B.H.P.V. MUMBAI 2X100 TPH STEAM GENERATING BOILER
POSITION : ERECTION AND COMMISSIONING ENGINEER-
APPRENTICESHIP
DURATION : FROM DEC 2008 TO NOV 2009(1 YEAR)
ORGANIZATION : M/S BHARAT HEAVY PLATE & VESSELS LTD.
PROJECT : HINDUSTAN PETROLIUM CORPRATION LTD, VIZAG
POSITION : ELECTRICAL SUPERVISOR MAINTENANCE
DURATION : FROM NOV 2007 TO JULY 2008(9 MONTHS)
ORGANIZATION : M/S GOPAL ENGINEERING WORKS
DUTIES AND RESPONSIBILITIES:
GIS installation and Testing of 380/132KVA ( ABB, HYOSUNG )
70 MGWTS Power Plant Erection and testing the Gas Turbine Activities.
11kv Substation Erection and testing Activities(Schneider Electric)
Installation, Testing Switchgears, Distribution Panel, Primary Cabinets SMDB and DB’s.
Installation and Testing of power transformers.
Installation, Testing of LCC, MCC, CCR, PCC Rooms and Panels.
Installation of control panels, switchgear panels, ATS panels, capacitor banks, with bus bars, ACBs, VCBs, MCBs, relays, contactors, PCBs, etc……
Installation, Testing and Commissioning of Small power, Lighting Circuits
Installation of Various types of substation, plant, internal and external lighting fixtures.
Installation, Testing of UPS and Batteries.
Installation of grounding and Earthing Lightning Protection Systems.
Installation of cable raceway and containment of Electrical system.
Installation and Testing of AHU and HVAC System and panels.
Installation of fire alarm system & devices.
Glanding & Termination of LCC Panels to Breakers, CT, PT, Earthling switches etc…..
Installation activates of Panel Boards, Cable Schedule for Trench and Duct Bank
HV,MV,LV and Control & Power cable pulling and Glanding, terminations
All type of Electrical Construction activates.
Installation and Testing of Electrical Equipment’s and Sensors.
Maintained the all type of electrical and electronics machines and equipment’s.
Boiler erection and testing activities in BFW pumps, Heaters, Field instruments.
PROJECTS HANDLED
Construction in the extension for Vizag H.P.C.L.
Acquainted with Boiler Erection Activities in MUMBAI.
Construction in the extension for Vizag Steel Plant.
Automation the 11kv Substation CLIENT: BECHTEL NDIA QATAR
AL BISHA 380/132KVA BSP SUBSTATION CLIENT: SUADI ELETRICITY COMPANY (SEC) WESTERN REGION, AL BISHAH, SAUDI ARABIA.
RHAFA 70 mgwts POWER PLANT (SEIMENS & GE UNITS) AND 132KV SUBSTATION CLIENT: SUADI ELETRICITY COMPANY (SEC) EASTERM REGION, RAFHA, SAUDI ARABIA.
SULFUR RECOVERY UNIT PACKAGE-3, ARAMCO Project, Jubail,SAUDI ARABIA
DECLARATION:
I hereby declare that the above furnished details are correct to the best of my knowledge and integrity.
LANKA AVINASH
DATE: