Post Job Free

Resume

Sign in

Electrical Engineer Design

Location:
Dubai, United Arab Emirates
Posted:
November 22, 2020

Contact this candidate

Resume:

CRRICULAM VITAE

FARHAN GHAZI

+971*********

+971*********

adh1xn@r.postjobfree.com

adh1xn@r.postjobfree.com

OBJECTIVE:

To find a challenging position where my technical skills & potential with hard work be fully utilized, personal enhancement and professional satisfaction.

CAREER PROFILE

1Graduate Electrical Engineer approved by Department of Civil Aviation Dubai.

(DCA) UAE.

2. Professional Training: Obtained training in London with M/S Avionic Services Ltd in Air Field Lighting.

3. More than 22 years’ experience of working as Electrical Engineering different projects of Airports(Airfield), Hospitals, Schools, Commercial Buildings and Road Lighting as well.

4. Direct supervision in the execution of large infrastructure, Roads lighting, and industrial projects.

5. Coordinate the construction work with the local Authorities and Contractor.

6. Observe the safety procedures followed by the contractor. Issued instructions as necessary to correct safety violation.

7. Review the contractor’s progress at all the times. Monitor the work performed, the material incorporated in the work, the material stored at the site and the contractors man power and equipment.

8. Ensure the correctness and completeness of as-built drawings.

9. Assist in the final inspection of the works. Review the adequacy and accuracy of the punch lists. Monitor the final completion of the work. Assist in the handover of the completed facilities.

EDUCATIONAL PROFILE:

Bachelor of Science in Electrical Engineering (1994)

Registered PEC Certificate No: 12579

Feb 2017 to Jan 2018

Client: Dubai Airport Expansion Projects (DAEP, DAES).

Company: Dar Al Handasah Consultants (Shair and Partners)

Designation: Electrical Engineer Airfield Lighting

Project: Al Maktoum International Airport –Passenger Terminal Building (PTB)-Airfield Works

Upgradation of New and Existing Apron works for West Apron -04, North Apron-4,

North Apron -03, East Apron-04, and New Crossovers Taxiways works for Zulu-5&6

Taxiway Zulu-7&8 and Parallel Taxiway Zulu-09 &10.

Job Responsibilities:

Terminal Building. Responsible to check all ELV works

Fire Alarm system addressable with approved Shop drawings, check all the installations of Fire detectors, Fire Bell, interface with passenger lifts, and Fire Alarm Control Panels. Installation of Fire rated cables.

Public Address System, And, Passenger Announcement System, Control Mike & Desk.

Substation Room works:

Responsible to check installation of RMU with Transformers and Main Distribution Board (MDB), including Cable laying and connections with transformers and MDB.complete scope of works with testing and commissioning as per the approved specifications and documents submittal approved by the Consultants.

Responsible to check internal Lighting system types with approved Shop drawings installations and Material Submittal. Complete all the circuit wiring and connections with lighting and Power control distribution panels.

Responsible to check all the external lighting systems of the terminal buildings and it’s controls with external lighting control panels with complete testing and commissioning as per the approved specifications and document submitted by the contractor.

Airfield Lighting

Responsible to check all relevant documents for AFL(Airfield Lighting) Shop drawings, Lighting layout, 6 Nos New Primary Circuit & Extension of existing Circuits Layout, CCR Layout in ESU (Electrical Substation Unit) Wiring Arrangement layout, Taxiway Guidance Sign Layouts with as per IFC(Issued for Construction) drawings, Method Statements, SCR (Site clarification Requests),Final Inspection Test Reports, AFL Testing Reports for Secondary Cable testing(Insulation Resistance Test up to 500V) and Primary Cable Testing(Insulation Resistance Test up to 5KV) with relevant Check list sign out with Client DAES for Approvals. Each Aprons Lights OCEM make Omni directional lights required Single Lamp Control & Monitoring System required Software update include new Aprons and Taxiways in CMS System provided by the AFL Contractor to Dubai Airport Engineering Services (DAEP) coordination with Consultant.

Responsible to attend weekly progress meeting with AFL Contractors and discuss site issues and progress emphasis on Quality of work and completion as per target date given by the Client (DAEP).

Responsible to monitor the Contractor Honeywell AFL daily site activities especially Installations of LED Lights in Aprons and Taxiways and its Secondary cable termination with Isolating Transformers and with ASD, and connection with AFL Manholes with approved type of Components like Isolating transformers, ASD (Addressable Switching device) V3, for AFL Lights control with CMS (Control & Monitoring System), as per approved specifications provided by the Client and approvals. Testing of CCR (Constant Current Regulators) where AFL lighting circuit controls connected with primary cable through AFL manholes in ESU-1,2,3 (Electrical Substation Unit).

May 2014 to Feb 2017

Client: Dubai Airport Expansion Projects (DAEP, DAES).

Company: Dar Al Handasah Consultants (Shair and Partners)

Designation: Electrical Engineer (Airfield Lighting)

Project: Dubai International Airport Expansion Projects (AFL Works around Concourse-4

Charlie Apron) Upgradation of Taxiways and Runway Lighting from Halogen to

LED Lights.

Job Responsibilities:

Responsible to check all relevant documents for AFL(Airfield Lighting) Shop drawings, Lighting layout, Primary Circuit Layout, CCR Layout in ESU (Electrical Substation Unit) Wiring Arrangement layout, Taxiway Guidance Sign Layouts, Method Statements, SCR (Site clarification Requests),Final Inspection Test Reports, AFL Testing Reports with relevant Check list and approvals.

Responsible to attend weekly progress meeting with AFL Contractors and discuss site issues and progress emphasis on Quality of work and completion as per target date given by the Client (DAEP, DAES).

Responsible to monitor contractor site AFL works especially Installations of Lighting, and connection with AFL Manholes with approved type of Components like Isolating transformers, ASD (Addressable Switching device) for AFL Lights control with CMS (Control & Monitoring System), as per approved specifications provided by the Client and approvals. Testing of CCR (Constant Current Regulators) where AFL lighting circuit controls connected with primary cable through AFL manholes in ESU (Electrical Substation Unit).

Arranging coordination meeting with MEP, AFL & Civil Contractors to ensure the work satisfactory progress and maintaining the quality of work at site as per the Consultants and Client requirements with in time frame provided.

Responsible to Check ELV Systems like Addressable type Fire Alarm System in Concourse 4 building with all relevant documents,Shop drawings, Material Submittals, Single line diagram, Samples for Smoke detectors, Heat Detectors, Sounders, Fire Bell, Fire Rated Cables, Structure Cabling system IDF,MDF, Fiber Optic cables, CAT 6 Cables, patch panel for Data and Voice. CCTV Systems PTZ Cameras external, Doom Cameras internals, CCTV Monitors in Control Room and Panel with CAT 6 cable connections, Public Address System, in Building.

Responsible to check LV System from main supply to C4 from ESU 2 & 3 Electrical Sub-station Unit works to Building, Transformer Room, Generator Room, LV Cables connected to MDB in LV Room, with SMDB to Final DBS. Lighting System and Power System, Single Line Diagram shop Drawings submitted by the Contractor for reviewing and comments as per the contract specification and drawings.

Client: Al Zorah Development Private Company Ltd P.S.C, Ajman UAE

Designation: Senior Electrical Engineer

Project: Design and Construction Infrastructure Road Lighting, Pumping Stations Works

Company: Dar Al Handasah Consultants (Shair and Partners).

Job Responsibilities:

Reviewing shop drawings as per the tender drawings submitted by the contractor for approvals for Lighting. Power, Low Current system like Fire Alarm System, Structure Cabling Works.

Reviewing Material submittals as per the specification and approved manufacturing list approved by the client, for LV works and low current systems.

Attend technical meetings with Client and contractors discuss site issues and explain how to manage.

Attend technical meetings with Authorities FEWA to get approvals of Electrical Design NOC and follow up the Approvals and Contractors Electrical Shop Drawings approvals for apply FEWA connection to Project.

Closely monitor site activities to ensure quality of works is in compliance with shop drawings, and report to Senior Resident Engineer.

Make sure that all Materials used comply with the approved Material Approval Request (MAR).

Carryout all planned site inspections as per the intervention points marked in the relevant ITP.

Responsible to coordinate Contractors to ensure time line of testing and commissioning of the Feeder Pillars of 8 Meters and 14 Meters Lighting Poles, Fire Hydrants System RTU (Remote Telemetry Unit), MCC Panels of the Fire Irrigation Pumping Station and Sewerage Pumping Stations.

Client: M/S ADNOC Abu Dhabi

Designation: Electrical Engineer

Project: Design and Construction of Temporary Guest House in Ruwais

Company: Dar Al Handasah Consultants (Shair and Partners)

Job Responsibilities:

Reviewing shop drawings as per the tender drawings submitted by the contractor for approvals for Lighting. Power, Low Current system like Fire Alarm System, CCTV System (MS) Method statement as per Quality Control Procedure(QCP) and

Inspection Test Plan (ITP) and that latest Version of the applicable document is available

Carryout all planned site inspections as per the intervention points marked in the relevant ITP.

At site inspection shall be carried out vide and official Inspection and Test Request (ITR) Submitted by the Contractor through the proper Channels.

Inspection status shall be recorded in the ITR and relevant and any check sheet as per the approved QCP. Any outstanding items shall be verified prior to closing the ITR. In the event that Contractor excludes an item from an ITR, the item will be dealt with/inspected utilizing the ITR from which item was excluded.

Closely monitor site activities to ensure quality of works is in compliance with shop drawings, and report to Senior Construction Manager.

Make sure that all Materials used comply with the approved Material Approval Request (MAR).

Make sure that the Contractor’s personnel are using the latest edition of the approved shop drawings, MS, QCP, and ITP as per the master index.

August 2012 to April 2014

Client: Civil Aviation Authority Pakistan

Company: Louis Berger Group (PMC)

Designation: Resident Engineer Package7A (AFL) and 8B (Power Telecommunication) CAT II

Interface Management (Testing and Commissioning of Airport Systems).

Project: New Benazir Bhutto International Airport Islamabad Pakistan

Job Responsibilities:

Reviewing shop drawings as per the tender drawings submitted by the contractor for approvals for Lighting. Power, Low Current system like Fire Alarm System, Securities System

Reviewing Material submittals as per the specification and approved manufacturing list approved by the client CAA, for LV works and low current systems.

Attend technical meetings with Client CAA and contractors discuss site issues and explain how to manage.

Attend site meetings with contractors and discuss issues and solve as per the contract and specification.

Follow up all AFL works at site with Site Engineers coordinate with contractor with site issues and check ITR and give approvals if according to the requirements.

Interface Management

Responsible to ensure the teams and parties are meeting all working deadlines.

Primary role include ensuring the works get done as well as progress reports they

Pertain to the scope of operations.

Attend regular interface meetings to discuss and analyze the progress of all interfaces towards work goals while producing monthly reports for client CAA.

Utilize weekly or general collaborative interface reports with monitoring tools that provide overall snapshots of work progress to client CAA.

Communicate with Contractors regarding issues, who then must ensure problem resolution among subcontractors, and who document any and all progress.

Ensure proper communication among Subcontractors between, handle when they might be short staffed, anticipating such problems, outlining them ahead of time and developing reactive protocol ensures that all parties know exactly what is expected.

Responsible to coordinate Contractors to ensure time line of testing and commissioning of interfacing the AFLCMS (Airfield Control and Monitoring Systems) systems with ATC according to the ICAO regulations and CAA requirements.

Sep 2009 to Jan 2012:

Company: Al Torath Engineering Consultants

Designation: Senior Electrical Engineer

Project: Al Jawahiri School Al Marfa Western Region Abu Dhabi

Job Responsibilities:

Reviewing shop drawings as per the tender drawings submitted by the contractor for approvals for Lighting. Power, Low Current system like Fire Alarm System, Public Address System, School Bell System.

Reviewing Material submittals as per the specification and approved manufacturing list approved by the client, for LV works and low current systems.

Attend technical meetings with Client and contractors discuss site issues and explain how to manage.

Attend site meetings with contractors and discuss issues and solve as per the contract and specification.

Check all the Substation works, the installation of 1000 KVA Transformer and connection of HV cable supplied by ADDC (Abu Dhabi Distribution Company), LV panel installation and LV cable connections.

Responsible for checking testing & commissioning of Fire Alarm System, Public Address System and SMATV System.

Responsible to check all the inspections related to Electrical works at site and coordinate with Resident Engineer if required.

Responsible to check Electrical design if any discompercies and coordinate with designer

To rectify and issue design immediately for implementation.

Responsible to check installation of A/C Package units with its power connection to sub-main distribution board in Electrical Room in main school building.

Responsible to check installation of A/C Chillers works and its connection to MCC (motor control center) room and pumps installation for chilled water supply to A/C chillers and its control panel in pump room.

August 2007 to October 2008

CLIENT: Sharjah Airport Authority Sharjah UAE

COMPANY: Halcrow International Partnership (Consultants)

PROJECT: Sharjah Airport Expansion Projects (Construction of new Passenger Apron, General

Aviation Apron and Cargo Apron)

DESIGNATION: Assistant Resident Engineer (Airfield Ground Lighting)

Job Responsibilities:

Responsible for all AGL works for the Expansion of Cargo Apron, General Aviation Apron & Passenger Apron for CAT II operation.

Execution of Airfield Lighting installation works and up grading the Control System of Siemens ADB with new Air Field ground lighting installations.

Installation of new High Masts with (ABACUS) Manufacturers flood lighting as per requirement of Cat II operations.

Responsible for reviewing all Technical Submittals & method statements submitted by Contractor for approvals.

Arranging the technical meeting (Electrical) with Client Sharjah Airport Authority and Contractor, discuss with different site issues and updated the status to Client.

Responsible for checking execution AGL works with ICAO Standards, at site as per approved shop drawings and specification.

November 2002 to July 2007:

CLIENT: Department of Civil Aviation Dubai UAE

COMPANY: Dar Al Handasah (Consultants) Dubai UAE

DESIGNATION: General Electrical Engineer

PROJECT: Royal Air Wing Apron/AX11A/South Runway (AX95)/Apron Works/AGL AX-055(Honey Well)

Job Responsibilities:

Responsible for the AGL & Electrical works of Royal Air Wing development of Hangers for Boeing 777, 777-300,747Airbus – 380 & Apron works.

Execution of Air field lighting Installation of centerline lights (curve & straight), edge lights stop bar lights controlled by CCR (Constant current regulators) Honeywell make in ESU (Electrical substation unit).

Responsible for the Installation of Tulip Lights & stand holding position lights in Charlie Apron with single lamp control & monitoring in Substation.

Substations:

Responsible to check the Installation of Main Distribution Board in Substation as per specification and approved shop drawings.

Responsible to check MDB connection with SF6 Ring Main Unit as per approved shop drawing submittals and drawings.

Responsible to check & installation of 100 KVA Transformer as per approved shop drawing and Client (DCA) requirements.

Responsible to check & installation of (VDGS) Visual Docking Guidance Signs and control system at site.

Responsible for the installation of Heat detector & smoke detector for fire Alarm System in substation.

Witnessed the installation of High Mast Flood lightings on high mast ring check the timing & mechanism of raising and lowering,

Witnessed the Luminance lux level measurement for high mast flood lighting as per CAT III B operation.

MAY 1999 TO JAN 2002

PROJECT: H.H. Sheikh Zayed International School Islamabad

COMPANY: Technical Associates (pvt) Pakistan (Contractors)

CLIENT: Department of Private Affairs of H.H Sheikh Zayed Bin Sultan Al Nahyan Karachi Pakistan

DESIGNATION: Electrical Engineer

DUTIES AND RESPONSIBILITIES:

ELECTRICAL WORKS:

Execution of Internal and External Electrification Including Preparation

Of circuits and layout Shop drawings.

Responsible & check the Installation of LV Panels & termination with LV Cables as per specification.

Witness the testing and commissioning of LV equipment in substation.

Installation of Feeder Pillars for External Lighting poles.

Installation of Street Lighting Pole & Flood Lights as per approved drawing and specification.

Coordinate with Consultant daily bases & any site issues.

Responsible and check & control of site supervisor and coordinate if any site issues.

Responsible to check the entire required load in substation as per approved shop drawing and specification.

MEP WORKS:

Installation of Split Air-Conditioning units with Compressor & Copper Piping.

Entire Plumbing work as per design & drawings from Consultants, Supplies through Tube-Well / U.G. Tank, Pumping System & Disposal & to Septic tank.

OCT 1998 -1999

PROJECT: Road Lighting From Airport to Abu Dhabi Palace Rahim Yar

Khan. Pakistan.

COMPANY: Technical Associates Pakistan (pvt) Ltd (Contractors)

CLIENT: Department of Private Affairs of H. H Sheikh Zayed Bin Sultan Al

Nahyan Karachi Pakistan.

ASSIGNMENT:

Stringing of LT conductor (GNAT) with LT Assembly i/e spool insulator & D Strip.

Installation of 25 KVA Pole Mounted Transformer.

of street Lights Philips Type HRC – 511 with 250 watts sodium Lamps with Brackets.

Respons Installation ible for the Erection of Tubular Poles

Stringing of 11 KV conductors (Dog) with HT Assembly i/e Pin & disc Insulator.

Installation of Distribution Panel Pole Mounted for Auto ON/OFF Street Lights.

SEP 1996 TO 1998

PROJECT: His Highness Sheikh Khalifa Bin Zayed Medical Complex Quetta Baluchistan Pakistan.

COMPANY: Technical Associates Pakistan (pvt) Ltd (Contractors)

CLIENT: M/S Crown Prince Private Limited Management Abu Dhabi

ASSIGNMENTS:

(A)ELECTRICAL WORKS:

Execution of internal & External Electrification including Laying of Conduit & wiring connection of DBs.

Installation of Electrical Fittings & Light Fixtures with Dampa False Ceiling.

Installation including Testing & Commissioning of complete system in block A, B, C& D, connected with each, Main Distribution Panel installed in Block - A (Ground Floor) where the system is controlled.

Radio Paging System

Fire Alarm System

Nurse Call System (Supplier M/S Philips)

Sub-station consisting of LT Panels & Emergency supply with 750- KVA Generator.

Operation Theater consisting of X- Ray machine ECG

(Electronic Cardio Graphic machine

Installation of 750 KVA Generator/C Testing and Commissioning.

Installation of MATV System.

1995 TO 1996:

Worked with M/S International Engineering Electrical LTD (Consultants). Lahore as a Building Electrification Design Engineer. Responsible of all Electrification design works for Housing projects.

1994 TO 1995:

Worked with M/S Unicon International LTD (Consultants) Lahore as a Building Electrification Engineer on various projects including Arts Council Okara & Residential Houses in Lahore. Responsible for all Electrification design works required by the Client.

COMPUTER SKILLS:

Windows, MS Word, MS Excel, Basic AutoCAD

(FARHAN GHAZI)



Contact this candidate