Curriculum Vitae of Raja MANICKAM Page * of *
CURRICULUM VITAE
ERSONAL DATA
PERSONAL DATA
PERSONAL DATA
Name : Rajamanickam.M
Address : S/o. K.Muthusamy
Kalanivasal Village,
Labbaikudukadu Post,
Kunnam Taluk, Perambalur Dist. Tamilnadu. India.
Post Code-621 108
Phone / Mobile : (IND) +91-638*******, 938-***-****
Email : adh0kk@r.postjobfree.com adh0kk@r.postjobfree.com Date of Birth : 20th of May 1980
Marital Status : M+2
Nationality : India
Passport Number : L0058247 (date of expiry 06rd of April 2023) Education : Diploma Holder (3 Years) in Computer Technology (DCT) from Dhanalakshmi Srinivasan Polytechnic Perambalur, Tamilnadu, India with Distinction. (1998~2001)
Higher Secondary School
S.S.L.C
J-Plus - Integrated System for Electronic Documentation
ADEPT - Electronic Document Management Software
O365 - Office 365 (Document SharePoint)
TOMS - Turnover Management System for Commissioning
ICAPS - Integrated Commissioning and Progress System
- Operating Systems Worked: MS-Dos, Windows 2000 family, Windows 2003 Server, Windows XP & Windows7
- SQL Server 2005 / 2008
- MS-Access, MS-Excel, MS-Word
- General computer software and some skill on computer troubleshooting
- Can Speak, Read and Write English and Tamil
- Proficiency in Document Management System
- Conversant with the operation of MS Office and Database Management System. Personal Detail
Applications & Software’ s Handled
Comput
er Kno
wledge
Other qualification
Proficiency
Curriculum Vitae of Raja MANICKAM Page 2 of 8
- Specialized in handling Completions software.
The Largest Textiles Company & Garments Coimbatore,Tamilnadu, India in M/s The Chennai Silks.
Rasgas Shutdown Train-6 Ras Laffan, Qatar in M/s Qatar Engineering & Construction Company.
Barzan Onshore Project Ras Laffan in M/s Qatar Engineering & Construction Company.
EPIC for Provision of Drain in U35 Dryer Regeneration Gas to recycle to dryer feed (MOC- 1031) Ras Laffan in M/s Qatar Engineering & Construction Company.
EPIC for Provision of Drain in U30 Was & HC Condensate Reflux Line (MOC-626) Ras Laffan in M/s Qatar Engineering & Construction Company.
Waste Water Treatment Plant (WWTP) – QG1 Ras Laffan, Qatar in M/s Qatar Engineering & Construction Company.
EPC Services for Replacement of Two Exchangers (BAHX) in Train 6 During QG3 & QG4 Ras Laffan, Qatar in M/s Qatar Engineering & Construction Company.
EPC Services for Modification of Pass Partition Plates of Exchanger E0621 in QG1 Train QG1, QG2 & QG3 Ras Laffan, Qatar in M/s Qatar Engineering & Construction Company.
EPC Works for Industrial Water Management Project-Dolphin (IWMP) Ras Laffan, Qatar in M/s Qatar Engineering & Construction Company.
EPC Works for Treated Industrial & Process Water (TIPW) Project – Qatargas Ras Laffan, Qatar in M/s Qatar Engineering & Construction Company.
EPC for Brownfield Tie-Ins of RL Looping, RLSS, RGESS and QG2SS – Qatargas Offshore, Qatar in M/s Qatar Engineering & Construction Company.
Experience in handling Project documentation and Final Handover Documentation.
Experience in handling Vendor documentation and Sub contractor documentation.
Handling Commissioning & Pre-commissioning Documentation.
Project QC Documentation.
Maintaining Project System/Sub-System Progress Database.
Database management for generating various reports.
Project Handover/Turnover system.
1. August 2019 to June 2020:
Company : QATARGAS Qatar
Position held : Document Controller
Location : Qatargas, Ras Laffan Industrial City and QG Offshore. Qatar in M/s Qatar Engineering & Construction Company.
Project : EPC BROWNFIELD TIE-INS OF RL LOOPING, RLSS, RGESS AND QG2S- (NFPS) PROJECT – QATARGAS
Duties and Responsibilities:
- Controlling project document register (Engineering, Vendor & Construction)
- Coordination with sub-contractor for the document submission. Experi
ences
Projec
t Work
Projec
t Docu
mentat
ion Kn
owledg
e
Curriculum Vitae of Raja MANICKAM Page 3 of 8
- Issuance of Controlled Copy drawings for fabrication and maintaining the control status of AFC drawings internally
- Coordination with client for issues related to documentation.
- Managing and filing of Master copy of the deliverables.
- Generating Daily/Weekly/Monthly document status reports
- Handling Pre-commissioning/Commissioning & Handover Documentation.
- Preparation of RFC, RFSU, MAC & Final handover dossiers.
- Administrator for Turnover Management System (TOMS).
- Monitoring & Reporting Commissioning inspection activities.
- Supporting QC team Punch list controlling.
- RFI Co-Ordination.
2. June 2018 to July 2019 :
Company : RASGAS Qatar
Position held : Document Controller
Location : Rasgas (Qatargas), Ras Laffan Industrial City.Qatar in M/s Qatar Engineering & Construction Company.
Project : EPC WORKS FOR TREATED INDUSTRIAL & PROCESS WATER (TIPW) PROJECT – RASGAS (QATARGAS)
Duties and Responsibilities:
- Preparation and Controlling of Overall Engineering/Vendor document register.
- Supporting Engineering team for the smooth running of Engineering/Vendor documents flow.
- Ensuring project document work flow as per approved document matrix in Adept (EDMS)
- Coordination with client for issues related to documentation.
- Managing and filing of Master copy of the deliverables.
- Issuance/controlling Approved drawings to Site
- Generating Daily/Weekly/Monthly document status reports
- Handling Pre-commissioning/Commissioning & Handover Documentation.
- Preparation of DCC, SAC, MAC & Final handover dossiers.
- Administrator for Turnover Management System (TOMS).
- Monitoring & Reporting Commissioning inspection activities.
- Supporting QC team Punch list controlling.
- Weekly documentation meeting with client.
3. November 2016 ~ June 2018 :
Company : DOLPHIN ENERGE LIMITED Qatar
Position held : Document Controller
Location : Dolphin, Ras Laffan Industrial City.Qatar in M/s Qatar Engineering & Construction Company
Project : EPC WORKS FOR INDUSTRIAL WATER MANAGEMENT PROJECT-DOLPHIN
(IWMP)
Curriculum Vitae of Raja MANICKAM Page 4 of 8
Duties and Responsibilities:
- Controlling project document register (Engineering, Vendor & Construction)
- Coordination with sub-contractor for the document submission.
- Issuance of Controlled Copy drawings for fabrication and maintaining the control status of AFC drawings internally
- Issuance of Approved drawings to Site.
- Classification and Submission of Vendor documents to Clients
- Safekeeping of transmittals and recording for easy location of Drawing / Documents.
- Project Commissioning administrator (ICAPS)
- Handling Pre-commissioning/Commissioning & Handover Documentation.
- Preparation of RFC, AOC & TOM dossiers.
- Punch list coordinator.
- Test package preparation.
- Monitoring & Reporting Commissioning inspection activities.
- Controlling & Developing of Project Commissioning database.
- Provided all the necessary support for all of the OPERCOM database issues.
- Entering the punch list items in the database for each discipline and giving Punch list clearance form.
- Supervise entry and clearance of Punch list items in ICAPS.
- Preparing weekly and monthly report and passing out to the management. Preparing daily report and informing to the management.
- Preparation and population of the Pre-commissioning & Commissioning ICAPS database
- To ensure and update ICAPS database according to engineering progress
- In charge of the preparation of the completion dossiers 4. November 2015 ~ November 2016 :
Company : QATARGAS Qatar
Position held : Document Controller
Location : Qatargas, Ras Laffan Industrial City.Qatar in M/s Qatar Engineering & Construction Company.
Project : WASTE WATER TREATMENT PLANT FACILITY – QG1 Duties and Responsibilities:
- Preparation and Controlling of Overall Engineering/Vendor document register.
- Registration, filing and processing of inspection reports issued by the Plant Inspector and the assessment records issued by the Reliability Engineer.
- Maintain project site documentation, including technical data, engineering drawings, technical specifications and other project- related documents.
- Coordination with sub-contractor for the document submission.
- Issuance of Controlled Copy drawings for fabrication and maintaining the control status of AFC drawings internally
- Issuance of Approved drawings to Site.
- Classification and Submission of Vendor documents to Clients
- Test package preparation.
- Handling Pre-commissioning/Commissioning & Handover Documentation.
- Preparation of RFC & RFSU dossiers.
Curriculum Vitae of Raja MANICKAM Page 5 of 8
- Monitoring & Reporting Commissioning inspection activities.
- Punch list coordinator.
- Controlling & Developing of Project Commissioning database. 5. May 2015 ~ November 2015:
Company : QATARGAS Qatar
Position held : Document Controller
Location : Qatargas, Ras Laffan Industrial City.Qatar in M/s Qatar Engineering & Construction Company.
Project : EPC FOR SERVICES FOR MODIFICATION OF PASS PARTITION OF EXCHANGER E0621 IN QG1 TRAIN QG1, QG2 & QG3, AND REPLACEMENT OF TWO EXCHANGERS (BAHX) IN TRAIN 6 DURING QG3 & QG4
Duties and Responsibilities:
- Preparation and maintaining of Tracking register database for effective controlling of Technical and Non-Technical documents.
- Maintaining of Tracking Register Database for Outgoing / Incoming Technical Documents.
- Classification, filing, submission and distribution of documents with client / Subcontractors.
- Issuance of Controlled Copy drawings for fabrication and maintaining the control status of AFC drawings internally.
- Generating the Daily, Weekly & Monthly document status reports.
- Classification and Submission of Vendor documents to Clients
- Overlook of QC Documentation.
- Safekeeping of transmittals and recording for easy location of Drawing / Documents.
- Supersede document are destroyed are file separately for future reference.
- Compiles hand over Documents for the certificates section for final handover to client
- Doing all QC formatting, Preparation of Hydro test package, Maintaining NDT Record, WPS, Welder Qualification Record, Welders certificates etc. with proper matrix and filing system.
- Preparation of Final Project Documentation including QC Dossier. 6. February 2014 ~ May 2015 :
Company : ORYX GTL LIMITED Qatar
Position held : Document Controller
Location : Oryx GTL, Ras Laffan Industrial City.Qatar in M/s Qatar Engineering & Construction Company.
Project : EPIC FOR DRAIN IN U35 DRYER REGENERATION GAS TO RECYCLE TO DRYER FEED-MOC1031 & U30 WAS & HC CONDENSATE REFLUX LINE – MOC-626
Duties and Responsibilities:
- Preparation and maintaining of Vendor & Construction Tracking register database for effective controlling of drawings and non-drawing documents.
- Maintaining of Tracking Register Database for Outgoing / Incoming Technical Documents.
- Classification, filing, submission and distribution of documents with client / Subcontractors. Curriculum Vitae of Raja MANICKAM Page 6 of 8
- Issuance of Controlled Copy drawings for fabrication and maintaining the control status of AFC drawings internally.
- Generating the Weekly & Monthly document status reports.
- Test package Preparation.
- Overlook of QC Documentation.
- Preparation and Maintaining of MAP system Dossier.
- Maintaining of System and Subsystem progress status database.
- Punch List Co-Ordination.
- Pre-commissioning & Commissioning Documentation.
- Preparation and submission of Project Handover Dossier.
- Establish tracking and distribution systems for controlling precommissioning / commissioning documentation / certification / Punch listing activities. 7. December 2012 ~ January 2014 :
Company : BARZAN GAS, Qatar
Position held : Document Controller Asst.
Location : Barzangas, Ras Laffan Industrial City.Qatar in M/s Qatar Engineering & Construction Company.
Project : BARZAN ONSHORE PROJECT
Duties and Responsibilities:
- Preparing and maintaining the register of engineering documents.
- Controlling & Distributing Project drawings to site and fabrication shop.
- Maintaining of Tracking Register Database for Outgoing / Incoming Technical Documents.
- Classification, filing, submission and distribution of documents with client / Subcontractors.
- Issuance of Controlled Copy drawings for fabrication and maintaining the control status of AFC drawings internally.
- RFI Co-Ordination.
- Weld Summary Recording in CMS.
- Uploading ITR’ s in TMS Database Management.
- Co Ordination with Client / Customer DHT / DFO.
- Co Ordination for the preparation of Fabrication Record Book.
- Test package Preparation.
- Preparation of completion dossier and certificate status for company archive dept.
- Preparation & Co-coordinating for monthly Project Discipline and Quality audit from Client.
- Co-ordination for Project Final Handover Documentation 8. April 2008 ~ September 2009 :
Company : RASGAS, Qatar
Position held : Access Clerk
Location : Rasgas (Qatargas), Ras Laffan Industrial City.Qatar in M/s Qatar Engineering & Construction Company.
Project : RASGAS SHUTDOWN TRAIN-6. (SHUTDOWN WORK) Duties and Responsibilities:
- Handling the Access hut team.
- Taking daily morning attendance.
- Motivating people for work and Training people for access clerk. Curriculum Vitae of Raja MANICKAM Page 7 of 8
- Looking after emergency on plant area people.
- Reporting safety team about emergency head count of people in plant area.
- Making event logo report for safety team. Promoted to access clerk team leader. SI.NO Employer Customer
Main
Client
Location Nature of Job Project
1
TCS Textiles Pvt
Ltd.,
2002 June
to
2012 June
TCS
Groups
The
Chennai
Silks
Coimbatore
India
EDP Operator,
Accounts,
Time Keeper,
Store Incharge.
Textiles and
Garments
2
Qatar
Construction
Company
2020 June
QCON Rasgas Qatar
Access Clerk
(Commissioning)
Rasgas Shutdown
Work
JGC Rasgas Qatar
Asst. Document
Controller
BARZAN Onshore
Project
QCON
Oryx GTL
Limited
Qatar
Document
Controller
(Commissioning)
U35 Dryer
Regeneration Gas to
recycle to dryer feed
Project MOC-1031
(EPIC)
QCON
Oryx GTL
Limited
Qatar
Document
Controller
U30 Was & HC
Condensate Reflux
Line Project
(MOC-626)
QCON Qatar Gas Qatar
Document
Controller
Waste Water
Treatment Plant
Facility (QG1)
QCON Qatar Gas Qatar
Document
Controller
Replacement of Two
Exchangers (BAHX)
in Train 6 during QG3
& QG4 (EPC)
QCON Qatar Gas Qatar
Document
Controller
Modification of Pass
Partition Plates of
Exchanger E0621
QG1 Train QG1, QG2
& QG3
QCON Dolphin Qatar
Commissioning
Administrator
(ICAPS)
EPC Works for
Industrial Water
Management Project-
Dolphin (IWMP)
QCON
Rasgas
Gas
(Qatargas)
Qatar
Document
Controller
EPC Works for
Treated Industrial &
Process Water (TIPW)
Project – Qatargas,
Raslaffan, State of
Profes
sional
Exper
ience
Curriculum Vitae of Raja MANICKAM Page 8 of 8
Qatar
QCON Qatar Gas Qatar
Document
Controller
EPC Brownfield Tie-
ins of RL Looping,
RLSS, RGESS and
QG2SS-Qatargas.
DECLARATION
All the information that I have supplied in my data sheets is true to the best of my knowledge. Prepared by,
Raja MANICKAM