AMIT CHADHA
Mobile 302-***-****
adgvc6@r.postjobfree.com
LinkedIn : https://www.linkedin.com/in/amit-chadha-5ba717140/
Professional Summary
I have over 16 years of experience in the field of Infrastructure Architecture, Cloud Architecture, Infrastructure Engineering, datacenter consolidation and migration, design and implementing Disaster Recovery Management.
Provided Cloud Architecture and Design consulting service for various customers.
Worked on different RFP’s from the Presales and Technical standpoint.
Successfully designed, deployed, and delivered secure Cloud Solutions for major organizations.
Performed roles of Solution Architect, technical lead, System Admin, System Integrator, Presales, and subject matter expert for variety projects.
Several years of experience in using, operating, and developing on top of cloud infrastructures and services therein, e.g. with Amazon Web Services, Microsoft Azure, or IBM Cloud Platform
Good understanding on Migrating applications to cloud infrastructures and services like Amazon Web Services, Microsoft Azure, IBM Cloud Platform or multi cloud deployments
Education Summary:
Master’s in science. Form Annamalai University, India
Master’s in computer application Form Annamalai University, India
Bachelor of Commerce from Delhi University, India
Certifications:
Pursuing AWS Certified Solution Architect Professional
AWS Certified Sysops Administrator Associate
AWS Certified Solution Architect Associate
IBM Cloud Solutions Architect v3
Oracle Cloud Infrastructure Certified Architect Associate
Oracle Cloud Infrastructure Foundations Certified Associate
Microsoft Certified Azure Administrator Associate
Microsoft Certified Azure Fundamentals
HP-UX Certified System Administrator (CSA)
HP-UX Certified Advance System Administrator
NPP-Nutanix certified Professional
SCSA (Sun Certified Systems Administrator)
SCNA (Sun Certified Network Administrator)
MCSE (Microsoft Certified System Engineer)
Two-year Diploma in Software Management from Aptech Computers Ltd.
Technical Skills:
Infrastructure Architecture
Develop Architecture and Designs that align to technology strategy and business requirements.
Design and implementing Disaster Recovery Management for Critical Servers
Collaboration with different architects and business teams to establish controls, procedures, and governance model.
Investigate new technologies. Perform proof of concepts to evaluate various products, designs and help make decisions.
Network Operating Systems
UNIX (SCO UNIX V/SUN Solaris 7.0/8.0/HP-UX 11.x)
Different Linux Distribution (RHEL/SUSE/Oracle Linux)
Windows NT 4.0/2000/2012 R2/2016
Storage
Good knowledge of NetApp (Network Appliances) Filer storage (NAS).
Implemented NIS, NFS, Quota, Windows, UNIX user drive sharing, ACL and capacity upgrade on NetApp F740 Filer
Experience with SAN device HP XP512
Virtualization: HP integrity virtual machines, VMware ESX 6.x/5.x
Converged/Hyperconverged: Nutanix, SimpliVity
Cluster Solutions: MC Service Guard, VERITAS Cluster Server
Public Cloud: Amazon Web Services /Microsoft Azure/IBM Cloud/GCP
Orchestration Tools: Ansible, Terraform, chef, Kubernetes
Cloud Management Tools: AWS Cloud Formation
Containers: HP9000, Docker
Scripting/ Languages HTML, DHTML, Shell Scripting, C, C++
EXPERIENCE SUMMARY
Duration : October 2012 – Till Date
Position Held : Senior Consultant.
Organization : HCL America INC.
Duration : April 2011 – October 2012
Position Held : Consultant.
Organization : HCL Technologies LTD.
Duration : March 2008 – April 2011
Position Held : Technical Solutions Consultant
Organization : Hewlett Packard Pvt. Ltd.
Duration : Feb 2004 – March 2008
Position Held : Senior System Administrator
Organization : ST Microelectronics India Pvt. Ltd.
VISA Status: GC(EAD)
Projects during working for above organizations:
Procter & Gamble (Remote) Nov 2018 – Till Date
Role: Infrastructure and Cloud Architect
Performed roles of Presale and Solution Architect
Solution Designing of SaaS offering for four User Experience Application.
Solution is Multi Availability Zone.
Designed the solution on (AWS/ Microsoft Azure /IBM Cloud).
The application to be deployed are Click2Connect, OptiBot, Work Blaze, My Ownership.
Evaluated CSP for the offering (Like Services, Security, Compliance, Cost).
Creating BOM for each application.
Presenting the solution to P&G Architecture board for their approval.
Setting up the landing Zone.
Setup of VM which are running mix of Windows and Linux workloads
Active Directory deployment for MS SQL 2016 Cluster.
The Applications are running out of 3 Region (USA, EMEA, APAC) .
Designed runbooks, HLD and LLD
Sempra Energy (San Diego) August 2018 – August 2020
Role: Infrastructure and Implementation Architect
One of the biggest Nutanix deployment for an Energy company in San Diego.
Leveraged Nutanix on Dell-EMC for HCI & VMware 6.5+SRM for DC Virtualization & Disaster Recovery.
Leverage VMware NSX as Software Defined Network Solution
Leverage Secondary DC for Planned Maintenance & Disaster Recovery capabilities
Migrated 6000+ workloads from exiting HW to Nutanix on Dell-EMC using VMware converter.
Workloads included Web Servers, Apps Servers, and Database Servers.
Active-Active, Active-Standby & Active-Failover solutions depending on application requirements between Primary DC & Secondary DC
Nutanix HCI & Discrete – Targeted Recovery Point Objective – 1 hour (To be tested)
Cross-vCenter in Enhanced Linked Mode for NSX
Dedicated network bandwidth for NSX Edge Gateway Traffic (V2P)
Minimum of 3-Nodes, Maximum of 10-Nodes per Nutanix Cluster
HYCU backup for Nutanix HCI
Enabled Patching using Nutanix Prism Element, VMware ESXCLI
Monitoring using Prism Central, vROPS, Integrate with Splunk
Automated configuration management and deployments using Ansible playbooks. Creating roles and updating Playbooks to provision servers by using Ansible.
Written Ansible Playbooks to deploy 400+ Oracle RAC nodes.
Creating runbooks, HLD and LLD.
Reverse KT for operation team
POC for C2M 3 tire application stack on AWS.
Services leveraged in AWS were EC2/S3/EFS/Route53/ELB
Creating and uploading AWS AMIs
Setting up AWS Autoscaling group for EC2 workloads.
Using AWS CloudFormation to build application stack
Engaged in DevOps architectures for automation of using industry standards and tooling and Infrastructure As Code (IaC)) to deploy to AWS cloud and on-prem, which helped establish and maintain DevOps culture in the organization and serve our customers better.
Estee Lauder (Remote) Jan 2018 – August 2018
Role: DR Architect
Discovery, Designing and Deployment of DR solution on Microsoft Azure for C2M application stack.
RTO and RPO was 4 x 8.
Creating BOM for the environment.
Presenting the solution to Estee Lauder Architecture board for their approval.
The OS images getting replicated from ON- on-premise using Rack Ware RMM Enterprise Hybrid Cloud Management.
Setup the landing zone.
Workloads running in Azure are mix of Windows and Linux.
The environment is 3-Tier Architecture. (Web-Tier/Application Tier/DB Tier)
Workload sharing is done using Load Balances.
Security traffic is managed using Palo-Alto Firewall between the Vnets.
Authentication is Managed by the AD running on Azure.
Setting up performance alarms using Azure Monitor.
Participate in application releases, testing and deployment into production
Azure virtual networks, networking services, DNS, DHCP, and IP addressing configuration
Review and analyze the effectiveness and efficiency of existing systems and develop strategies for improving or further leveraging these systems
Provide orientation and training to end users for all modified and new systems
Services used in Vnets, NSG, Azure Application Gateway, Azure Load Balancer, Azure Active Directory, Virtual Machine, Blob Storage
Configured Azure CLI for Terraform
Used Terraform to build application and Infra stack
Designed runbooks, HLD and LLD.
NXP Semiconductor Manufacturing (Netherlands and Texas) Nov 2016 – Dec 2017
Role: Lead Architect for NXP
Requirements study
Solution and BOM designing
Designing SOW from the technical standpoint and taking Sign-off from customer
DR solution designing
Designing new Consolidated projects solutions
Designed LLD and HLD for the Central Management System
Oversaw Infrastructure design and solutions being proposed and review them prior to
Implementation
Participate in meetings to understand customer requirements, Due Diligence and Proposal presentation sessions
Responsible for the delivery of engineering solutions to improve cost, quality and productivity of client infrastructure.
Architecting, designing, implementing and supporting of AWS Cloud-based Applications, infrastructure and its solution architecture.
Services leveraged in AWS were EC2/S3/EFS/Route53/ELB, SNS
Setting up workload for LSF Grid Computing Environment On AWS.
Creating and uploading AWS AMIs
Setting up AWS Autoscaling group for EC2 workloads.
Setting up performance alarms using CloudWatch.
Using AWS CloudFormation to build LSF stack
Rogers Communications Canada Inc. (Remote) March 2016-Oct 2016
Role: Implementation Architect
Solution designing and BOM designing.
Solution of DR designing and Implementation.
The requirement study, design and Implementation.
Solution designing for Lift and shift and Implementation.
Migrated the VM’s using VMware converter/Plate spin /Storage Replication
Doing P2V, V2V migration of all different Linux environments.
Configuring and Administration of HANFS and troubleshooting
Analyzing Systems for Critical Patches, applying them and upgrading drivers
Creation/Migration SAP cluster packages.
HA environment is VCS/MCSG /CSF/CVM
Pepsi Co. (Texas) Apr 2014 –September 2016
Role: Solution and Implementation Architect
Datacenters consolidation across globally, migration planning
Presentation of technical migration plan to customer.
Solution designing and BOM designing.
Solution of DR designing and Implementation.
The requirement study, design and Implementation.
Migration of all different environment running in different sector’s (LAR/NA/ASIA/EUROPE)
Data center consolidation for Virtualization, consists of 300 ESXi hosts and 2000 VMs to a two data center in North America
Migrated the VM’s using VMware converter/Plate spin /Storage Replication
Implementation of new Consolidated projects
Interfaced directly with client executives.
Configuring and Administration of HANFS and troubleshooting
Analyzing Systems for Critical Patches, applying them and upgrading drivers
Creation/Migration SAP cluster packages.
Storage Migration from XP 12K / EVA 4400 / EVA 8400 to EMC VPLEX.
Migration platform involves HP-UX 11.v1/11.v2/11.v3/AIX/ SUSE 11.1/3.
HA environment is VCS/MCSG.
Configured and Managed DNS and AD in Isolated Zone.
Automated the Server deployment and migration using shell scripting.
Designed runbooks, HLD and LLD.
Reverse KT for operation team.
Clorox Services Company (California) July 2013 - March 2014
Role: Solution and Implementation Architect
Migrating DC from HP DC to HCL DC
Solution designing and BOM designing.
Solution of DR designing and Implementation.
The requirement study, design and Implementation.
The Change management and Problem Management Process.
Implementation of new Consolidated projects
Storage Virtualization using Hitachi VSP
Reconfigure HA environment after migration which was using HP MCSG.
Configuring and Administration of HANFS and troubleshooting for SAP.
Storage Migration from XP 12K / EVA 4400 / EVA 8400 to Hitachi VSP. Appx Data for 100 TB.
Designed runbooks, HLD and LLD.
Reverse KT for operation team.
AstraZeneca (Delaware) Jan 2012-July 2013
Role: Solution and Implementation Architect
Migrating DC from IBM DC to HCL DC
Solution designing and BOM designing.
Solution of DR designing and Implementation.
The requirement study, design and Implementation.
The Change management and Problem Management Process.
Implementation of new Consolidated projects
Storage Virtualization using Hitachi VSP.
Configuring and Administration of HANFS and troubleshooting for SAP.
Coordinating with vendors such as HP, IBM for fixing unresolved issues
Analyzing Systems for Critical Patches, applying them and upgrading drivers
Creation/Migration SAP cluster packages.
Storage Migration from XP 12K / EVA 4400 / EVA 8400 to Hitachi VSP. Appx Data for 5 PB.
Designed runbooks, HLD and LLD.
Reverse KT for operation team.
Johnson & Johnson (Remote) March 2008- Jan 2012
Role: Solution and Implementation Architect
Solution designing and BOM designing.
Solution of DR designing and Implementation.
The requirement study, design and Implementation.
The Change management and Problem Management Process.
Implementation of new Consolidated projects
Coordinating with vendors such as HP, IBM for fixing unresolved issues
Analyzing Systems for Critical Patches, applying them and upgrading drivers
Hewlett Packard Pvt. Ltd March 2008 – March 2011
Managing and leading teams working on OS technologies like Redhat Linux, Suse, HP-UX, Solaris
Escalation Management- Collaborate and work closely with other cross functional teams to drive timely resolution of customer issues
Work closely with HPE Engineering teams for product delivery & product quality issues.
Lead the key projects which were targeted lowering resolution time & improving customer experience.
Leading the knowledge management efforts on HPE products – Knowledge creation/transfer/tech talks
Drive Crit-sit calls and Root cause analysis for
ST Microelectronics India Private Ltd. Feb 2004 – March 2008
STMicroelectronics is a French-Italian multinational electronics and semiconductor manufacturer headquartered in Geneva, Switzerland. It is commonly called ST, and it is Europe's largest semiconductor chip maker based on revenue
Role: System Engineer
(HP-UX to Linux Migration)
Mission was to migrate Development, QA and Production environment from HP-UX to RedHat Enterprise Linux. Applications and environments migrated to Linux included:
The entire project was divided in different phases starting from Proof of Concept (POC), to beta deployment, soft opening and final deployment.
Achievement of maintaining 200 days of up-time of Linux system.
Migrating the data from DAS to NAS (Netapp Filer F740).
Role: Implementation Engineer
(HP-UX High Availability using Veritas Cluster Server)
Mission was to migrate EDI Application environment to High availability environment which was running standalone server.
Two node cluster with one package running on Primary Node.
The Cluster Runs in Active/Passive mode.
The entire project was divided in different phases starting from Proof of Concept (POC), to beta deployment, soft opening and final deployment.
Storage: HP XP-1024
Role: Implementation Engineer
(HP-UX High Availability using MC/Service guard)
Mission was to migrate Development, QA and Production environment from all HP-UX servers which were running standalone servers to cluster environment
Two-node cluster with one package each running on all the nodes.
Other Node act’s as a fail over node for the other node.
The entire project was divided in different phases starting from Proof of Concept (POC), to beta deployment, soft opening, and final deployment.
Role: Implementation Engineer
(Citrix Farm Migration)
Citrix farm migration from Citrix Metaframe 1.8 to Metaframe XPe, and further to Metaframe Presentation server 3.
This server farm included 16 Windows 2000 Advanced Server serving to more than 1500 Users. The architecture of the farm is designed to load balance among servers and high availability.