A dynamic professional with total 7 Years & 9 month of Experience in the areas of Plant Electrical
Maintenance, Project Execution & Commissioning,
Team Management, Quantity Surveying & Material
Management.
Expertise in EHV, HT, LT, DG & UPS Systems handling.
Good understanding of Electrical Drawings, Maintenance of Electrical Equipments, commissioning, erection & execution of projects & Quality assurance.
Both practical as well as theoretical knowledge of Different Electrical Instruments.
A leader with abilities in leading motivated teams towards achievements of organization’s goals.
Abilities in diagnosing the faults, rectifying, planning and scheduling effective maintenance schedule for
enhancing systems.
Working more efficiently and productively so that maximum output comes.
Myself be
To work in an organization as a team member, and to be a person of character with sound reputation.
TEAM – UNITE – SUCCESS
Manoj Bojarajan
Electrical Engineer – Asst. Manager
(Dept. Engineering & Maintenance)
Experience
Electrical Incharge looking after Plant maintance activities & production assistance.
Proficient in handling process operations, developing method improvement techniques and implementing
various systems in the organization.
Tracking maintenance materials on a daily, weekly and monthly basis to maintain optimum stock ensuring no delay in production incase of any breakdowns.
Ensure lesser electrical downtime breakdowns.
Overall incharge for Electrical Activities in Project and successfully executed & commissioned all the electrical works in the project. Which involves
Maintenance & Troubleshooting of Switchyard (132 KV), HT, LT transformers, Switchgears, UPS, motors &
VFD’s.
UPS system: Maintenance & troubleshooting activities
Looking after plant reliability and Maintenance activities of the plant, which has a load of 5.5 MW.
Troubleshooting of PLC mode manufacturing process equipment’s and ensuring the lesser downtime of process equipment’s.
STL
Project +
Maintenance
Engineer (SAP
PR, PO,
Services)
Trouble
Shooting,
Ensure lesser
downtime
Quality
assurance,
Assurance of
Compliance
procedure.
Improvement
Projects
Work Done :
Worked on Glass Preform Preparation, Soaking & Cladding machines and carried out maintenance activities (Preventive & Condition monitoring activities)
Overall responsible for start to end equipment’s installation which have actively involved along with User department and Quality team personnel regarding FAT, SAT, IQ, OQ along with its proper documentation
(protocol and reports).
Handled documentation of Engineering like SOP preparation / revision (as per routine frequency), Protocol and report preparation regarding qualification of equipment’s & instruments.
Full knowledge about the Air-Handling Unit system operation and Clean room requirements criteria.
HVAC Operation Handling:
Total 71 AHU’s with VFD control operation, capacity of 42,000 CFM.
Chillers (Centrifugal & Screw) operation handling (1100 Tr, 350 Tr).
Full knowledge on operation & handling whole HVAC system in BMS (Schneider).
Operational knowledge in Clean Room criteria (Class Classifications) & parameters maintaining in HVAC & Electrical operational requirements.
Safely executed Improvement projects:
Project: Glass Plant – Shendra, Aurangabad
1. Erection & Commissioning of 132 KV Switchyard (LILO). 2. Installation & Commissioning of Distribution system. (33 KV & 415 V) 3. Commissioning of 15 MVA Power & 2.5 MVA Distribution transformers. 4. Installation and commissioning of UPS system (Schneider & Emerson UPS – 400 KVA, 600 KVA
& 250 KVA).
5. Earthing Grid System for Overall plant.
Other Improvement Projects
Replacement of old electrical panel in external plant for improved reliability.
Completed the project of Overhauling LT & HT transformer.
Successfully completed replacement of old LT breaker (ACB) in PCC panel with new ABB LT breaker.
Initiated and completed the process of converting ONAN of LT transformer to ONAF.
Associated with DuPont for improving Safety, Reliability of Systems & building safety culture.
Worked as Electrical Engineer in World’s 2
nd
Largest Para-
Xylene Process Plant.
Successfully commissioned Reliance Largest Substation 196 Mtrs, which has connected load of 100 MW and continuous load of 78 MW.
Commissioning of Substation and Plant activities.
Co-ordination with engineering team for technical validation and drawings approval.
Excellent in drawings and layouts
Work Done:
Ensuring that all works are carried out as per approved methods & drawings.
Preparation of testing & commissioning method statements.
Conducted PSSR audits for electrical system before handing over.
Preparing ITP’s and getting approval for completed jobs.
Inspection & Testing activities of equipment/materials as per approved ITP.
Erection of 33/11/0.415 KV Indoor substations having capacity of 250 MVA.
Commissioning of 33/11/6.6 KV power transformers up to 45 MVA and 6.6/0.415 KV Distribution Transformers up to 2.5 MVA.
Commissioning of 33/11/6.6/0.415 KV Switch gears and Control Panels like HT Panels, PCC, MCC, PMCC, VFD and Lighting Distribution Panels.
Plant Earthing of all the equipment and Lighting Protection.
Prepared lessons learned document through project & close out report to ensure preventive measures are deployed.
RIL
Project J3 (PR, PO, MS
Project & Document
Verification)
Erection &
Installation (ITP, FAT,
Inspection))
Testing (Quality
Check)
Commisssioning
Project Handover &
Working with
Maintenance Team
initially for smooth
operation (SAP -PM)
Closure Report &
Leasson Learnt
Responsibilities:
Looking after maintenance of DB’s, UPS, LT Panels and Transformer.
Involved in Energy Conservation audits.
Day to day maintenance activities.
Power dashboard updating & maintaining load factor for benefits from Electricity Board.
Other Exposure on Industrial Criteria
Completed 12 days training from SIEMENS on MV Switchgears, LV Switchgears & Motors and Certified.
Inspected 600 KVA UPS system at Vertiv (Emerson) Energy Pvt Ltd, Mumbai.
Completed 6 days training and coaching of Operating and working procedures of Schneider MV Panels (6.6 KV) at Vadodara.
Inspected LT Cables (1.1 KV) at KEC International Ltd, Mysore for Procurement Goods.
Inspected EHT Panels for Procurement (EHT Panels) at Flameproof Control Gears Pvt Ltd, Daman. Strengths
Willingness to learn and update in terms of job responsibility requirements.
Proactive approach in terms of planning and execution.
Hard working team player with positive attitude and self-confidence.
Good communication and proper status reporting to superiors. Achievement
Received Spot Performance award for Overhauling Power Transformers in STL.
Completed: Yellow Belt in Lean Six Sigma.
Received Best Performer Award for the year 2016-2017 at RIL.
Received Safety Award for safe completion of Electrical Works in PX-4, RIL. Software Skills
SAP - Intermediate Level. (PR, PO, PM, MM)
Proficiency in entire MS-Office & Project
Good understanding of Internet tools
Declaration
I hereby declare that above details are true to the best of my knowledge. Manoj Bojarajan