Post Job Free
Sign in

Power Plant Electrical Engineer

Location:
Indore, Madhya Pradesh, India
Posted:
October 11, 2020

Contact this candidate

Resume:

OBJECTIVE :

I would like to work in an environment where, I would get a chance to enhance my capabilities, where my skills would be properly utilized for the betterment of the organization.

PROFILE :

Motivated & Smart engineering professional with meritorious education background and a successful track record of planning and executing project site. Diplomatic and Tactful Nature with professionals and non-professionals at all levels. Accustomed to handling sensitive issues & keep all confidential records. Thrive in working in a deadline-driven environment with excellent team-building skills.

CORE COMPETENCIES :

** Devising cost saving measures & modifications to achieve substantial reduction in terms of man days, erection cost, raw material & energy consumption . ** Executing cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget.

** Coordinating with all related departments for timely actions like scheduled maintenance to ensure the reliability of the equipment.

** Monitoring implementation & documentation of quality systems. ** Identifying assignable and chronic causes by the use of latest analysis techniques.

** Managing the safety in the plant and minimizing accidents/ losses. ** Maintaining a high level of quality & discipline amongst the workforce across the department.

ORGANISATIONAL EXPERIENCE :

A.Working as Head (E&M) in Technoblast Mining Corporation at (a) RCCPL Chhindwara M.P. from October 2018 to Jan 2020.

(b) Presently working at ACL Raigarh Coal Mine.

B.Worked as Electrical Incharge from feb-2018 to October 2018 in LARSEN & TOUBRO LTD. (WATER & EFFLUENT TREATMENT DIVISION) at Sri Ganganagar (Rajasthan) for 20 MLD (New) water treatment Plant + Rehabilitation of Existing 23 MLD, 10 MLD, 6.75 MLD and 2.25 MLD Water treatment Project.

C.Worked as Deputy Manager (Electrical) from march 2016 to march 2017 in BGR Energy Systems Limited in Power Project Division at Raigarh (C.G.) for 2X300 MW of TRN Energy Private Limited.

D.I. Worked as Assistant Manager Electrical from january 2014 to February 2016 in Larsen & Toubro Ltd.

II. From January 2011 to December 2013 Worked as Sr. Engineer Electrical in Larsen & Toubro Ltd.

E. I. Worked as an Electrical Engineer II in BSBK Engineers Pvt. Ltd. Beekay House,L-8, Green Park Extension New Delhi ( sister concern company of Macawber Beekay Pvt. Ltd.) from October 2009 to Dec 2010.

II.Worked as an Electrical Engineer I in Macawber Beekay Pvt. Ltd. Beekay House,L-8, Green Park Extension New Delhi from May 2008 to September 2009.

F. Working experience as a G.E.T. (Electrical) to Electrical Engineer at Monnet Ispat& Energy Ltd., Raigarh (C.G.) from 12th July 2005 to 25 th April 2008.

Project Completed :

1.2X300 MW of TRN Energy Private Limited Raigarh (C.G.)

2.CHP of 3X660 MW PPGCL Bara (Allahabad).

3.Coal Handling System of 6X150 MW CPP for MAHAN PROJECT of Hindalco Industries Ltd. at Bargawan, Singrauli (M.P.)

4.Ash Handling System of 300 MW JSW Energy Limited Power Plant at Torrangallu Bellary ( Karnatka)

5.MSEB Koradi Nagpur site as a Maintenance Engineer for Ash Handling & Mill Reject System of (3X210) MW power Plant.

6.Ash Handling System of120 MW Power Plant of Tata Power Company Limited Jojobera Jamshedpur ( Jharkhand)

Key Result Areas as Head (O&M) :

Whole responsibility of Operation and Maintenance of E&M Machinery of mines (LHD, SDL,Pumps etc).

Installation of belt Conveyor and Interlocking/sequencing of belts.

End to End responsibility of 33kV substation installation, Testing and Charging.

Safe Operation of Panels with all interlocks.

Accountable for Material Management, Manpower Management and resources.

Accountable for Contractor arrangement and Electrical approval from DGMS.

Accountable for handling overall administration for Incline 3 Project.

Key Result Areas as Deputy Manager :

** Worked as Electrical incharge CHP of 2X300 MW Thermal Power Plant since last 1 year.

** Carried out the erection,testing and commissioning of Transformers, Motors, Switch Gears,VFD,PLC.

** Handled the works related to stacker Reclaimer and conveyors and Utilities of CHP .

** Accountable for handling overall administration for erection,commissioning, planning & material management for CHP.

Operation & Maintenance of whole CHP equipments, Substations and auxiliary systems.

Preventive Maintenance, Daily route checking & Smooth operation all equipments.

Key Result Areas as Assistant Manager :

** Installation, Testing& commissioning of 6.6 kv HT panels,PMCC panels,MLDB,ACDB,VFD panel, Local control panels etc .

** Fixing of cable trays & earthling of all electrical equipments.

** Lying and Termination of all size cables as per cable schedule/Termination detail.

** Testing & commissioning of Transformers,HT motors.

** Testing,commissioning and operation of Stacker Reclaimer,Wagon Trippler and Travelling Tripper.

** Installation,Testing& Commissioning of Ventilation system,DEsystem,DFDS& sprinkling system, Metal detector, Coal Sampling system,SM,ILMS & Hoist of CHP.

** Operation and Maintenance of all CHP.

** Coordinating with consultants(DCPL) and client (Hindalco Industries Limited).

** Plan and review site planning at micro levels with sub-contarctors to deliver targets on time.

** Material Management.

** Maintaining Highest Standards of Safety & Quality for entire work force with peace & harmony.

** Keeping all records updated for Client Billing.

Key Result Areas as Sr. Electrical Engineer:

** Erection,Testing& commissioning of MCC,Transformer,MLDB,ACDB,VFD panel, Local control panels etc .

** Fixing of cable trays & earthling of all electrical equipments.

** Lying and Termination of all size cables as per cable schedule/Termination detail.

** Testing,commissioning and operation of AHP and Mill Reject System.

** Project Coordination and Planning.

PM & Routine Maintenance of all AHP Electrical,C&I equipments, Panels, Substations.

Key Result Areas as an Engineer(E&I) :

** Operation & Maintenance of Mining Machines (SDL, LHD,Compressor & Drill machines).

** Preventive and running maintenance of DG sets,ACB,Transformer,TSU,Ventilation fans.

** Operation & Maintenance of LT Panels-MCC,Area lighting .

** Installation,O&M and extension of Conveyors,Dewatering pumps.

** Safety of equipments & workmen.

** Planning & coordination with other concern departments.

** Quality and availability of equipments.

Equipment / Plant Handled :

** HT Panels/Transformers/Substations

** Air Circuit breakers/ Vacuum Circuit Breakers/Oil circuit breakers

** PCC’s, MCC’s,PLC.

** Motors & its auxiliaries

** VFD’s

** Lighting

** Accountable for Commissioning of WT/SCR/TTR/Crushers

Breakdown maintenance of :

** Wagon Trippler,Stacker Cum Reclaimer, Travelling Tripper and Conveyors.

** All Auxiliaries of CHP & its MCC.

** HT panel, VCB’s, Transformer, ACB’s, VFD’s & Motors upto 560 KW (6600 Volt, 3 phase)

Maintenance of PLC and C&I Equipments.

ACHEIVEMENTS:

Was selected as the Best Quality Engineer& Best Safety Engineer in Electrical Department for the year 2012 & 2014 in L&T Construction.

Undergone 5 Days Supervisor Development Programme In L&T Construction Limited on various topics of Safety Mnagement, Plant & Machinery, Contracts Management, Material Management,Time Management& Quality Management at Ahemadabad(Gujrat).

Has received the training training for ‘Safety in Construction Industry.

Has received the training for Testing & Protection procedure for Industrial power distribution at Chennai(Tamilnadu).

TRAINING :

Accomplished Two weeks Vocational training at Bhilai Steel Plant,Bhilai (C.G.) in the year 2001{in Wire & Rod Mill and Rail Mill.

EDUCATION : (A)

B.E. in Electrical Engg. From M.P.C.C.E. & T. Bhilai of Pt. Ravishankar Shukla University, Raipur (C.G.) Aggregate :68% Passing of year 2004.

Passed Higher Secondary School Certificate Examination in the year 1998 with 66% form M.P. Board, Bhopal.

Passed High School Certificate Examination in the yeasr1996 with 80% from M.P. Board, Bhopal.

(B)

Master of Buisness Administration’ in Marketing Management from Punjab Technical University with 70% marks in 2014.

PERSONAL DETAILS:

Father’s Name: Late Shri Bihari Saw

DOB: 25/01/1980

Languages Known:Hindi,English

Martial Status: Married



Contact this candidate