Yacine Koliai Phone: + (974-****-**** Email: *******@*****.*** 1 P a g e
Yacine A. Koliai – French Master in Architecture.
Doha, QATAR
Phone: + (974-****-****
Email: *******@*****.***
LinkedIn: https://qa.linkedin.com/in/yacine-a-koliai-a3142021 Architecture, Design & Construction Manager
Experienced Architect with over 22 years’ in diverse construction type, such as: Sports Facilities, Residential, Hotels, High-Rise Offices, Housings, Airport & Education ranging from $5 million to $700 million Project Cost. I have worked with reputed international organizations in Algeria, France and Qatar: Architecture Studio, Société de Conception d’Architecture et d’Urbanisme (SCAU), Atelier Tom Sheehan & Partners (ATSP), Aéroport de Paris Ingénierie (ADPI), BECHTEL Overseas; and currently with ASTAD Project Management.
During my first period with ASTAD Project Management in Doha, Qatar, I worked as a Senior Architect within Construction Management Services (CM) on two Major Projects: Qatar Foundation Headquarters and Qatar Faculty of Islamic Studies (QFIS). During this period, my duties covered all aspects of CM services: Review of Technical Documentation, Validation of Construction activities in accordance with the Contract documents, and the Interface coordination between the Contractors, Designers, and the Client.
In my second period, I worked as as Senior Architect part of Technical & Design Management Team on FIFA 2022 World Cup - Education City Stadium, leading the Architectural review and compliance checking of all Architectural matters to FIFA Compliance and Local Organizing Committee requirements as well as performing interface coordination with other disciplines. Highly skilled in navigating complex situations and with a solid knowledge of the practical application of Construction in general and of Architecture particularly, I have proven the ability to fully manage very complex projects whether in Design and/or in Construction Management to meet critical deadlines and assigned project goals. Currently I am Design Manager as well as leading the supervision team of the project plus Qatar Foundation Future Schools. CORE COMPETENCIES
Construction Management.
Design & Technical Management.
Architectural Practices.
Contract implementation.
Codes interpretation and optimization.
Familiar with International Standards and regulations.
Development of procedures related to practices.
Tender Evaluation and Final assessments
CAREER HISTORY
ASTAD Project Management, Doha, Qatar. 2019 – Present Design Construction Manager
My role in Design Management are to ensure:
1. Closing all pending Design Comments.
2. Finalizing all the Design related Matters.
My role in Construction Management are:
1. Managing supervision team.
2. Construction and Technical problem resolving.
3. Facility preparation to the Operator (Works Handover). 4. Tender evaluation and Contractor Proposal assessments. ASTAD Project Management, Doha, Qatar. 2011 – 2019 Design Management & Technical Services – Sr. Architect As Senior Architect, part of Design Management Team, my involvements are to ensure that: 1. The design fulfills the Design criteria and Client expectations. 2. Coordination is done with other disciplines (Life and Fire Safety, MEP, Structure, Civil, and Landscape). 3. The construction is in accordance with the Approved Design and to monitor the works progress. Yacine Koliai Phone: + (974-****-**** Email: *******@*****.*** 2 P a g e Duties
Design review of all documents prepared by the designers.
Validation of the RFIs responded by the designers.
Document review of Submittals prepared by the contractors (Technical documentations, Pre-qualifications,…etc).
Coordination of multidisciplinary construction activities and the project progress and supporting Upper Management in achieving the overall project goal.
Assessment of Technical Variations.
Direct activities and check the work of the contractors that it is in accordance with approved Shop drawings and Construction practices.
Achievements
Improved the work procedures and construction.
Checked the design development from the Contractors (Design & Build projects) without any deviation from the original design and without any financial impact.
Established a control tool, a log is submitted twice a week to the reviewers in order to reduce the average time of the review cycle by 25%.
Instructed the construction supervisors to report and to raise the issue on the spot to the contractor for possible deficiencies with a proactive supervision of works and coordination with the contractor, this has resulted the optimization of the quality and has reduced the issuance of NCR's and SDR's.
AEROPORT DE PARIS INGENIERIE (ADP-I) with BECHTEL, Doha, Qatar 2007 – 2011 Senior Architect
Reporting to the project director for the overall works of the design & Build projects, my main tasks were: During the Design Development: Acting as Design manager, I was engaged to ensure that, the Architecture, MEP, Life Safety, Civil, Structure and Special Systems design developed by the contractor are following our design intent, client requirements, and solving all design related issues. During the Construction: I had to review all architectural documents (Material and Samples, Shop Drawings, Test reports) to approve the Mock-Ups, to manage and to coordinate with other disciplines (MEP, Structure and Civil Engineers) to ensure that their review and approval are in accordance with the approved design. Duties
Evaluation of Contractor's proposals on the design and/or on the construction.
Answering to RFIs raised by Contractors.
Managing technical and coordination meetings with Engineers, and ADPi’s Experts and subconsultants.
Preparing Monthly progress reports to the Project Manager with respect to the Architectural activities.
Checking the preparation of contract documents: drawings, details, and bill of quantities are in accordance to the client’s requirements.
In charge of the design & build projects, preparing the projects concept and design development (until Preliminary design) as per the client’s requirements, and in compliance with the design criteria, and approved specifications.
Managing technical meetings with Engineers and implementing their requirements in the design.
Coordinating with the specification writer regarding the updates of the specifications with the drawings. OGER INTERNATIONAL, Saint-Ouen - France 2007 – 2007 Project Architect
Preparing construction drawings (plans, sections, elevations, enlarged plans & details).
Managing technical coordination meetings, ensure that all discrepancies are resolved and implementing their requirements on documents.
ATELIER TOM SHEEHAN & Partners (ATSP), Paris - France 2005 – 2007 Architect
Part of consultant team, I was in charge of the Architectural and Envelope Activities and to follow up on quality control of the activities in order to ensure that:
1. The design is being developed in accordance with the Client expectations as well as per applicable Standards and local authorities.
2. The design of the stadiums is respecting the federation regulations (Confederation of African Football) 3. Coordination is done with other disciplines (Life and Fire Safety, MEP, Structure, Acoustic, Civil, and Landscape). 4. The design is being developed within the time and the budget allocated to the projects. Yacine Koliai Phone: + (974-****-**** Email: *******@*****.*** 3 P a g e Duties
Checking the contract requirements, assisting the Chief Architect and developing the design.
Preparing the drawings (concepts, plans, sections, elevations, and presentations), from concept design to the tender and all related documentations.
Coordinating with the specification writer in order to prepare all the specifications and the scope of work for the tender.
Leading technical meetings and coordinating with Engineers & Specialists. MARINA & PHILLIPICK ASSOCIATES ARCHITECTS PRACTICE, Paris - France 2004 – 2005 Junior Architect
Preparing and developing the design from the concept to the tender documents for official submissions.
Leading the technical meetings and coordinating with Engineers &Specialists.
Preparing the snagging list and checking that all the snags are released. EARLIER CAREER
Site Architect SFICA, Paris, France 2003 – 2004
Graduate Architect Architecture Studio, Paris, France 2001 – 2002 Architect Designer Cabinet Archi-Koliai, Algiers, Algeria 1998 – 2000 Trainee Architect Foyer d’Architecture et d’Urbanisme, Algeirs, Algeria 1996 – 1997 Student Architect MAMACHE – BOUHELASSA Architects, Algiers, Algeria 1995 – 1996 EDUCATION & PROFESSIONAL QUALIFICATIONS
Master’s in Architecture 2007
Ecole d’Architecture de Paris – La villette, Paris, France Final Project: New Design of Algiers Stadium (Capacity: 60000 people) Bachelor in Architecture 1999
Ecole Polytechnique d’Architecture et d’Urbanisme, Algiers, Algeria Final Project: Urban design of the old city of Algiers Certification in Health, Occupational Safety and Environmental 2015
The Institution of Occupational Safety and Health (IOSH), Doha, Qatar Project Management Professional courses 2010
FOCAL, Doha, Qatar
PERSONAL INFORMATION
Date of Birth: 18th June, 1976 Nationality: French Marital Status: Married (3 children) Languages: Fluent in English, French and Arabic Yacine Koliai Phone: + (974-****-**** Email: *******@*****.*** 4 P a g e List OF KEY PROJECTS
PROJECT
GFA /
CAPACITY
LOCATION COMPANY ESTIMATIONS
SPORT
FACILITIES
Education City Stadium 40.000 Seats Qatar ASTAD 2200 M QAR Oran stadium 40.000 Seats ALGERIA ATSP 50 M Euros
East-Algiers Baraki stadium 40.000 Seats ALGERIA ATSP 65 M Euros West-Algiers Douera stadium 38.000 Seats ALGERIA ATSP 65 M Euros Ben-Aknoun Arena 5120 m2 ALGERIA ATSP 18 M Euros
EDUCATION
Qatar Academy of Science and Technology 6000 m2 QATAR ASTAD 100 M QAR Academyati Future School 13000 m2 QATAR ASTAD 200 M QAR Qatar Faculty of Islamic Studies 45000 m2 QATAR ASTAD 850 M QAR High School of Tourism 25000 m2 ALGERIA ATSP 20 M Euros OFFICES
Qatar Foundation Headquarters 35000 m2 QATAR ASTAD 650 M QAR Strategic Studies Center 4500 m2 QATAR ASTAD 150 M QAR Main Office of Religious Affairs Ministry 18000 m2 ALGERIA ATSP 18 M Euros Main Office of Foreign Affairs Ministry 25000 m2 ALGERIA ATSP 20 M Euros Sheikh Mohammed Office Fit-out 200 m2 QATAR ASTAD 6 M QAR AIRPORT
Emiri Terminal 15000 m2 QATAR
ADPI with
BECHTEL 950 M QAR
Emiri Ramp Facilities 4500 m2 QATAR ADPI with
BECHTEL
135 M QAR
Emiri Ramp Tunnel 500 ml QATAR ADPI with
BECHTEL 60 M QAR
Screening Baggage Building 500 m2 QATAR ADPI With
BECHTEL
90 M QAR
Ceremonial podium 5000 m2 QATAR
ADPI with
BECHTEL
80 M QAR
VVIP checkpoint 1000 m2 QATAR ADPI with
BECHTEL
50 M QAR
SIGNAGE Al-Shaqab Internal & External Signage
Upgrade
45000 m2 QATAR ASTAD
RESIDENTIAL
Luxury appartements and Duplex 38 Housing FRANCE Marina & Phillipick 10 M Euros
Residantial Housing 121 Housing FRANCE
Marina &
Phillipick 35 M Euros
Senior’s rest house 145 rooms FRANCE Marina &
Phillipick 25 M Euros
HOTEL
Guests Palace Hotel and Symposium 450 rooms SAUDI ARABIA OGER
INTERNATIONAL 350 M Euros
Hotel de Sers 127 rooms FRANCE SFICA 50 M Euros
RESEARCH Danone Vitapole research centre,
Development and Quality. 30000 m2 FRANCE
Architecture
Studio 35 M Euros
URBAN
DESIGN
Redesign of the place Mohammed V.
Arabic world Institute
2000 m2 FRANCE Architecture
Studio
15 M Euros
Site Development and Landscaping 65000 m2 QATAR
ADPI with
BECHTEL 80 M QAR
Mixed-Used Feasibility Studies UGC 5500 m2 FRANCE
Architecture
Studio 30 M Euros
MUSEUM ONASSIS Cultural Centre 18000 m2 GREECE Architecture Studio 50 M Euros