CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 1 of 14

1

CURRICULUM VITAE

A. PERSONAL PARTICULARS:

Name : PARTHA DEBNATH

Present Designation : Senior Project Manager

Present Address : Flat No 702B, Fereez Abdul Aziz

Complex, Building No. 10,

Al Zubair Street, Doha,

State of Qatar

Telephone No. : 00974 – 55617834 (Mobile)

Email No : adgube@r.postjobfree.com

Date of Birth : 01 - 01 – 1969

Number of years of experience : 29 Years

Nationality : Indian

Passport No. : U0620990 valid till 03.12.2029

GCC Driving License : 70095335 valid till 27.03.2026 B. EDUCATIONAL QUALIFICATIONS:

i. B. E. (Bachelor of Engineering) in Civil Engineering from National Institute of Technology, Calicut, Kerala (India) in 1991. ii. Master’s in Business Administration (MBA) (Specialization in Marketing Management) from ‘Indian Institute of Social Welfare & Business Management, Kolkata, India in 1998.

CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 2 of 14

2

C. KEY QUALIFICATIONS:

Over 29 years of experience in Project Management, Design, Proposal Preparation and Operation and Maintenance of water supply system and Sewerage system, Water and Wastewater treatment plants, Wastewater Recycle Plants, Reverse osmosis Plants and Ultra filtration systems and Pumping Stations for Sewage and Treated Effluent. Familiar with the Contract condition of World Bank and Asian Development Bank funded projects, FIDIC, IChemE and Oman Condition of Contract. Also familiar with the standard conditions of Contracts prevailing in all GCC countries. Worked with very stringent techno-commercial contract prepared by M/s Metcalf and Eddy, M/s Parsons International of USA and NJS Consultants of Japan. Completed and commissioned 56,000 m3/day Sewage Treatment Plant based on Membrane Bioreactor Technology for Muscat Waste Water Treatment Scheme as Senior Project Manager which is one of the largest MBR based STP in the world and Operation and maintenance of the same plant for 6 months.

Completed and commissioned 80,000 m3/day Sewage Treatment Plant at A’Seeb, Muscat based on Sequential Batch Reactor (SBR) followed by Ultra-filtration (UF) Technology for Muscat Waste Water Treatment Scheme which is biggest so far in Oman. Completed and commissioned Wastewater Treatment scheme for Eastern part of the Muscat city (Al Amerat) of Sultanate of Oman which includes very large 3 nos Sewer Network Projects including House connections and 1 no Sewage Treatment Plant of capacity 18,000 m3/day with Pumping stations and Treated Effluent utilization system. Involved in Design of Infrastructure Projects like Water supply, Drainage, Sewerage, Solid Waste Management etc. for large Cities and Industrial Townships. Major projects handled are in the areas of Effluent Treatment, Sewage Treatment, Raw Water Treatment, Drinking Water etc. Designed and executed various plants based on processes like Physico-chemical process, Heavy metal removal, Effluent Pretreatment, various clarification system like Inclined plate, Tube settler, Solids Contact clarifier etc., Activated sludge process, attached growth process, Desalination plants (RO) for Brackish water and Seawater, Ultra filtration process for Industrial wastewater and Sewage Treatment. Industries served by installing and commissioning wastewater treatment plants are large leather complex, Distilleries, Food Processing Industries, Agro based Industry, Steel Plant, Semi-conductor Industries, Picture Tube Manufacturing Industry, Power Plant, Aluminum Smelter plant, Wire-rope manufacturing plant, Paper manufacturing Plant, Chromium Mines, Soap Manufacturing Industry, Dairy Plant etc.

CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 3 of 14

3

Responsible for the provision of a proactive cost management service, Procurement of Process Equipment, and internal financial reporting as required and ensured the delivery & quality of cost & estimating databases.

D. ACHIEVEMENTS DURING PROFESIONAL CAREER

Project Management: Successfully executed, Commissioned and handed over 3 nos plant 56,000 m3/day, 80,000 m3/day and 18,000 m3/day Sewage Treatment plants based on Membrane Bio-Reactor technology and SBR Technology at Muscat, Sultanate of Oman under Muscat Wastewater Treatment Scheme. Worked as Project Manager for the projects. The projects consists of Civil and Electro-mechanical and Instruments and Control system. Operation and maintenance of the plants. Successfully completed 3 nos Sewer network projects in Al Amerat, Muscat, Oman for Haya Water having total sewer length of 550 Km and 10,000 nos House Connections and 550 Km Fibre Optic Duct work.

Designed and executed 200 m3/day Effluent Recycle plant based on Ultrafiltration followed by Reverse Osmosis Plant for Hindustan Lever Ltd (Part of Unilever PLc, UK)

Drinking Water Project: Successfully secured order and executed Drinking Water Treatment Plant for Kolkata Metropolitan Development Authority with Inclined Plate Settler which was one of the first few plants in India for this application. I have done business development, proposal preparation, frontline sales activity, basic engineering, project management, procurement and commissioning of the plant. The plant has become trend setter in the country. White Water recycle Plant: Successfully secured and commissioned White Water Recycle Plant for ITC Tribeni Tissue which is opposite to the conventional process. I have used High Rate Solids Contact Clarifier followed by Dynasand Filter against conventional concept of Floatation process. My involvement was to do the business development, frontline sales activity, Project Management and commissioning of the plant.

Water Injection Project: Implementation of Inclined Plate settler for Water Injection Project for ONGC, Sibsagar. My job was to sell the concept during pre- tendering stage, process design and detailed engineering, proposal preparation, frontline sales activity and Project co-ordination during execution of the project. Industrial Water Treatment plant in Bhutan: Successfully secured order for Ion Exchange in Bhutan for Inclined Plate Settler for Bhutan Ferro Alloys Ltd. My job was to sell the concept during enquiry stage, process design, proposal preparation, frontline sales activity and Project management of the project. CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 4 of 14

4

BOOT Project: Worked for Proposal preparation for BOOT (Build, Own, Operate and Transfer) tender for Chennai Petroleum Corporation Limited, Chennai for Sea Water Desalination Plant consisting of Sea water Intake, Desalination plant (RO), Power plant and Pipeline. Worked as proposal leader doing process design, estimation, risk analysis, co-ordination between Client, VA TECH Wabag GmbH, Vienna, VA TECH Finance, Vienna & Delhi, IVRCL Ltd

(Consortium partner), Wartsila (Power plant vendor) etc. and also had the exposure of complex financial BOOT model for arriving product water tariff. E. PRESENT JOB RESPONSIBILITIES:

1. KEO International Consultants working as Senior Project Manager for Public Works Authority (Ashghal), Doha, Qatar from 1st January 2020 to till date.

Responsible to deliver various Sewage Pumping stations, Rising Main and Gravity Sewer Network projects in Doha. Looking after tender finalization of various upcoming projects for both Construction Contracts and Professional Services Contracts.

F. PREVIOUS JOB RESPONSIBILITIES:

A. Haya Water – Oman Wastewater Services Company, Muscat, Sultanate of Oman as Project Manager – (October 2011 to 31st December 2019)

Worked as Project Manager and successfully completed and commissioned the following Projects:

a. 80,000 m3/day Sewage Treatment Plant at A’Seeb, Muscat which consists of 3 nos Main Sewage Pumping Stations, 24 Km Gravity Sewer Trunk main, the fully covered Plant consists of Pretreatment, Sequential Batch reactor followed by Fine Screening and Membrane Bio-reactor, Electro-Chlorinator, TE reservoir with TE Pumping Station and pipelines, Dewatering System and Odor Control System with Electronic Nose system. The project also includes Sea Outfall of total 9.4Km wherein total off-shore length of 1.8 Km was laid at maximum water depth of 11m. Also 2 Nos off site TE storage Reservoirs with Pumping Stations were constructed and commissioned for total value of Rial Omani 88 Million (US $ 228 Million). The Project also consists of 8Km Laying of HV cable, 33/11 KV Transformers, 11KV/0.415 KV

Transformers, 11KV Switchgear, MCCs, 100% capacity DG Sets with Auxilliaries. The Plant is controlled by Distributed Control System (DCS) and Field PLCs with Fibre Optic Network. CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 5 of 14

5

b. Design, Construction and commissioning of 9000 m3 Water Reservoir with Pumping Station for Royal Palace at Muscat c. 18 MLD Sewage Treatment plant with Extended Aeration system followed by Membrane Bio-reactor system

- Plant consists of Inlet Pumping Station, Flow measurement, Screening, Fat, Oil & grease Removal, Odor Control System, Chemical Dosing System, anoxic and Aeration Tanks, Ultra-filtration (MBR), TE Storage and Pumping system, Disinfection system, Sludge Dewatering System, Polymer Dosing Systems,

- 11KV and LV Switchgear, 11KV/415V Transformers, Capacitor banks, Electrical SCADA, MCCs, Local Operating Panel, Variable Frequency Drive, DG Sets etc.

- DCS for the whole plant and integration with Central Control Room, Field Instrument systems, CC TV, fire Alarm system, Integration with network distribution system.

- 2 Main Sewage Pumping Stations

- TE Storage and Pumping system and Transmission main

- Operation and maintenance for 2 years

d. 3 Nos Sewage Network projects which include Trunk Sewer, Rider and Lateral Sewer (550 Km), Manhole chambers (21,000 nos), House connections (10,000 nos) and Fibre Optic network (470 Km).

The work responsibility consists of the following:

• Ensure the Business plan targets are met in terms of Value of Work Done

(VOWD), HSE and QA/QC Targets

• Review and ensure effective implementation of Project management plan and take action to meet changing needs and requirements.

• Review, Monitor and Control Project Working programme and implementation of recovery programme

• Analyse and monitor Project Risks and Issues which impact adversely on the progress and take action for Mitigation

• Ensure implementation of Project Quality Plan, Project HSE Plan, HEMP and effective Control

• Ensure Cost Control and proper management of Project Budget, Variations to contract and Claim Management

• Review and finalise of various reports like Progress Reports, Shortfall reports, Look ahead schedule, Design and procurement plan, Testing and Commissioning plan

CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 6 of 14

6

• Attend various project review meetings with Consultant and Contractor.

• Manages day-to-day operational aspects of a project and scope.

• Effective implementation of work methodology and enforces project standards.

• Ensure project documents are complete, current, and stored appropriately.

• Review and ensure proper allocation of resources i.e. right people on the right job

• Ensure project legal documents are completed and signed by the appropriate authority

• Ensure proper NOC and Approval are in place before start of the work and ensure revalidation before the certificates expire

• Hold regular meetings with Project team and keep them informed of changes within the organization and external business environment, legal and statutory changes.

• Attend Quality certification audits and ensure compliance

• Conducts effective performance evaluations and mentors colleagues with less experience

• Consistently acknowledges and appreciates each team member's contributions and mitigate team conflict and communication problems. B. Galfar Engineering & Contracting SAOG, Muscat, Sultanate of Oman as Senior Project Manager – (May 2005 to September’2011) Project: Construction, Installation, Testing and Commissioning of 56 MLD Sewage Treatment Plant based on Membrane Bioreactor System under Muscat Waste Water Treatment Scheme at Muscat.

The plant consists of the following:

Pretreatment : Drum Screen, Pre-aeration Blower, Coarse Bubble Diffuser, Grit and Grease removal system, Grit Washer system, Scum removal system, Odour Control System, Chemical Dosing system

Biological Treatment: Aeration Blower System, Anoxic Mixer, Fine Bubble Diffuser, Mixed Liquor Submersible Pumps, Scum and Drain pumping system, Membrane Bio-reactor system, Waste Sludge Pumping System

Tertiary Treatment : Post Chlorination, Permeate Pumping system, Treated Effluent Tank and Treated Water pumping system

Electrical System : 33KV Sub-station, 6.6 KV substation including Capacitor Bank, MV Switchgear, Battery Charger system, 2 nos. 3.2 MVA, 1 no. 2.5 MVA and 1 no. 1.4 MVA Diesel Generators, Electrical SCADA, MCCs, PLCs and Local Control Panels, Variable frequency Drives, Lightening Protection etc.

CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 7 of 14

7

Instrumentation and Control :Distributed Control System (DCS), Field Instrumentation, Fibre Optic Cable Network, Fire Alarm System, Plant Paging system, CC TV system and Security Gate Barrier System

• Responsible for overall Project Management of all the disciplines like Civil, Mechanical,

• Electrical, Instrumentation and Control. Lead the testing and commissioning team while Commissioning of the plant.

• Monitor the physical progress of work and against planned work. Take action to mitigate the delay.

• Ensure Business Plan commitments are met.

• Remove the constraints for all the interdisciplinary / interface work. Risk Management and taking mitigating action.

• Ensure Project Cash flow and claims settlement

• Procurement of Process and Non-process Equipment for the plant

• Liaise with the specialist equipment supplier (Process Equipment & piping and instrumentation controls) and Membrane supplier on activities related to process design, procurement of equipments and timely completion of various activities.

• Resolve technical issues with client and consultants

• Monitor and control material procurement, Site safety, worker’s deployment, storage and logistics

• Ensure implementation of Safety work procedures and encourage employees and subcontractor to report accidents / injuries / potential hazards

• Manage Work Orders, Variation Orders and insurance requirements and various bonds and bank guarantees.

• Manage the technical and commercial audits of the company.

• Prepares MIS and various progress reports like weekly and 3 weekly reports, monthly reports to client etc.

• Participates in Commercial and Progress meetings.

• Review Milestone Payment Certificates and Contractor Invoices, VOWD

• Prepare Cost of completion quarterly and monitor the variances

• Prepare Final Project Close out report.

C. Feedback Turnkey Engineers Pvt. Limited, New Delhi as Manager – Design and Business Development – (April 2004 to April’2005) Involved in securing the following projects:

Consultancy in the field of Public Health Engineering projects like Water Supply, Drainage, Sewerage System, Solid Waste Management for large urban infrastructure projects: Development of 2000 Acre Industrial Estate for Delhi State Industrial Development Corporation at Bawana / Narela, Delh Phase – II, India. CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 8 of 14

8

Survey, Design and Detailed Engineering of Water Supply, Drainage, Sewerage and Road for 3 Urban Local Bodies for Municipal Administration Department, Hyderabad (World bank Funded)

Capital Investment Plan for Karnataka Urban Infrastructure Development and Finance Corporation for 7 Urban Local Bodies (World Bank funded). Bulandshahr and Khurja, Cities of Uttar Pradesh Water Supply & Sewerage Projects Activities Performed:

Consultancy in the field of Public Health Engineering projects like Water Supply, Drainage, Sewerage System, Solid Waste management for large urban infrastructure projects. The work involves the following:

• Business Development

• Enquiry generation, giving presentation, tender /offer preparation, attending technical discussion, follow up, contract closing

• Process Design and Detailed Engineering

• Project Management

• Preparation of business development tools

• Looking for International Tie Ups

• Develop and upgrade vendor data bank

Development of 2000 Acre Industrial Estate for Delhi State Industrial Development Corporation at Bawana / Narela, Delh Phase – II, India. Master Planning, Design and Engineering of Infrastructure Services like Water supply, Drainage, Sewerage, Roads and Electrical substation and distribution, preparation of Detailed Project Report.

Survey, Design and Detailed Engineering of water supply, Drainage, Sewerage and Road for 3 Urban local bodies for Municipal Administration department, Hyderabad (World Bank Funded)

Preparation of Detailed Project Report and Tender document. Capital Investment plan for Karnataka Urban Infrastructure Development and Finance Corporation for 7 Urban Local Bodies (World Bank Funded) The job consists of identifying infrastructure needs, calculating the project cost, Financial operating plan and preparation of capital investment plan CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 9 of 14

9

Bulandshahr and Khurja Cities of Uttar Pradesh Water supply and Sewerage projects Preparation of Detailed project Report for Infrastructure services like water supply, Drainage, Sewerage, Solid Waste management etc.

D. VA Tech Wabag Limited, Chennai, India as Deputy Manager – Design and Business Development – (August 2001 to March ’2004) Involved in securing the executing the following projects: 62.5 MLD Sewage Treatment Plant for Rajasthan Urban Infrastructure Development Projects at Jaipur, India

22.5 MLD Drinking Water treatment Plant for Kolkata Municipal Corporation 2 MLD CETP for Perundurai Leather complex for Council of Leather Exports, India

200 m3/day Reverse Osmosis plant for Drinking water for Chennai Metropolitan Development Authority.

The work involves the following:

Þ To achieve the annual sales target as agreed.

Þ Work as Proposal Leader to look after process design, estimation, co- ordination with discipline engineers to ensure proper submission of offer in time.

Þ To look after business development in Water and Wastewater business. Major thrust is in entering into new areas where VA Tech Wabag’s presence is not there like Rajasthan, Andhra Pradesh, Gujarat, Chandigarh, Madhya Pradesh and Chattisgarh etc..

Þ Monitor and review the activities of regional sales officers and providing inputs like techno-commercial datas, competitor’s information, technical specifications etc.

Þ Implementation and monitoring of sales and marketing plan. Þ Upgrading competitor’s data base and doing SWOT analysis for possible competitors

Major work done:

i. Rajasthan Urban Infrastructure Development Projects - 62.5 MLD STP Preparation of process design, prepare the proposal for tender submission, attending the technical discussions, preparation of techno-commercial clarifications, and attending negotiation meeting to finalise the contract CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 10 of 14

10

ii. Kolkata Municipal Corporation - 22.5 MLD Drinking Water Plant Preparation of process design, prepare the proposal for tender submission, attending the technical discussions, preparation of techno-commercial clarifications, and attending negotiation meeting to finalise the contract iii. Council of Leather exports, Chennai - 2 MLD CETP for Perundurai Leather complex at Perundurai, Erode

Preparation of process design, prepare the proposal for tender submission, attending the technical discussions, preparation of techno-commercial clarifications, and attending negotiation meeting to finalise the contract. iv. Channai Metropolitan Development Authority – 200 m3/d Reverse Osmosis based Drinking Water Treatment Plant for a very large Bus Stand

Preparation of process design, prepare the proposal for tender submission, attending the technical discussions, preparation of techno-commercial clarifications, and attending negotiation meeting to finalise the contract. E. Ion Exchange (I) Limited as ‘Deputy Manager – Tendering & Proposal’ to look after Tendering & Proposal preparation of Water and Wastewater Treatment Plants.

The works involve enquiry generation, offering techno-economically viable solutions to client by process optimization, freezing technical specifications with the consultants before the tender publishes, technical presentations, negotiation for order finalisation. Co-ordination with the project execution team during erection and commissioning. Responsibility of key customers as per single window concept for all of their water and wastewater requirements. Worked as Eastern regional in-charge for Wastewater Management Division, Head of Proposal Engineering at Mumbai and looked after Infrastructure Business Development.

Major work done:

1.1 TISCO, Jamshedpur (Steel Plant) - 370 m3/h capacity Waste Water Treatment Plant for TISCO, Cold Rolling Mill, Jamshedpur. CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 11 of 14

11

Preparation of process design, discussion with TISCO and M. N. Dastur to finalise the process parameters, prepare the proposal for submission to the client, attending the technical discussions, preparation of techno-commercial clarifications, presentation of seminars and attending negotiation meeting to finalise the contract.

Involved in the basic engineering and drawing approval from the consultant. To look after Project Management to ensure smooth execution of the water water treatment plant. Helping commissioning the plant.

1.2 Indian Oil Corporation, Digboi (Oil Refinery) - 200 m3/h Drinking Water Treatment Plant for Township:

Commissioning of the plant and conducting performance test run for hand over of the plant to IOCL.

1.3 ITC LTD, Tribeni Tissue Division, WB (Tissue Paper Manufacturing) - 460 m3/h White Water Recycle Plant:

Studying the problem related to Optical Brightening Agent present in white water of the paper mill. Feasibility study of various treatment schemes to decide the technically best process. Preparation of process design, discussion with ITC to finalise the process parameters with respect to site conditions, prepare the proposal for submission to the client, attending the technical discussions, preparation of techno-commercial clarifications, presentation of seminars and attending negotiation meeting to finalise the contract. Project co-ordination with the project management group to sort out the various problems at site and taking measures to complete the project. Helping commissioning the plant and performance tests. Generate performance data of the plant by monitoring various technical parameters. 1.4 NALCO, Angul, Orissa (Aluminum Smelter Plant) - 150 m3/h Surface Water Treatment Plant for Fluoride removal.

Studying the problem related to Contamination of plant wastewater by addition of Fluoride which is being discharged into the natural drain. Given lot of site inputs to developed resin based fluoride removal process which is being implemented for the first time in India. Attending the lab scale pilot plant studies to show the performance of the resin. Preparation of process design, discussion with NALCO to finalise the process parameters with respect to site conditions, prepare the proposal and tender submission. Attending the technical discussions, preparation of techno-commercial clarifications, presentation of seminars and attending negotiation meeting to finalise the contract.

CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 12 of 14

12

Project Management to monitor the site activities and sort out problems related to site, vendor follow up, client co-ordination. Helping commissioning the plant. 1.5 Calcutta Metropolitan Development Authority - 190 m3/h Drinking Water Treatment Plant for Chandannagar, Hooghly (City Water Plant for Drinking).

Studying the problem related to shortages of space available at site at CMDA Chandannagar site. Suggested Inclined Plate settler in place of Clari-flocculator to fit in the place. Preparation of process design, discussion with CMDA to finalise the plant layout with respect to site conditions, prepare the proposal for tender submission, attending the technical discussions, preparation of techno- commercial clarifications, presentation of seminars and attending negotiation meeting to finalise the contract.

Looked after project execution, drawing approval, site mobilization, procurement of equipments, co-ordinate with contractors and CMDA to ensure timely completion of plant. Helping commissioning the plant and performance tests.

1.6 Usha Martin Limited, Ranchi - 55 m3/h capacity Waste Water Treatment Plant for Pickling Waste.(Wire Rope Manufacturing Industry): Studying the problem related to Wastewater disposal which highly acidic in nature. Discussion with Usha Martin and MECON to prepare suitable scheme for heavy metal precipitation like Fe, Mn and Zn etc. Preparation of process design, prepare the proposal for tender submission, attending the technical discussions, preparation of techno-commercial clarifications, presentation of seminars and attending negotiation meeting to finalise the contract. Helped in project co-ordination. Part of the team while commissioning the plant.

1.7 Bhutan Ferro Alloys Limited, Bhutan - 100 m3/h Pretreatment Plant for the Process at Phuentsholing, Bhutan.

Studying the various problems related to putting up water treatment plant in hilly terrain. Site selection for the plant and suggested pre-fabricated Inclined Plate settler which can be erected at a very short span of time. Preparation of process design, discussion with BFAL to finalise the plant layout with respect to site conditions, prepare the proposal, attending the technical discussions, presentation of seminars, arranging site visits of similar plant and attending negotiation meeting to finalise the contract.

Helped the project co-ordination team. Part of the team while commissioning the plant.

CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 13 of 14

13

1.8 INDAL, Muri - 130 m3/h Drinking Water treatment Plant for the INDAL Township (Aluminum Plant)

Studying of site condition and understanding the requirement of INDAL. Selection of proper scheme which will be ideally suitable for the river water treatment. Preparation of process design, discussion with INDAL to finalise the scheme, prepare the proposal, attending the technical discussions, arranging site visits of similar plant and attending negotiation meeting to finalise the contract.

Helped the project co-ordination team. Part of the team while commissioning the plant.

1.9 Kwality Dairy Limited, Haryana - 40 m3/h capacity Total Water Management Plant for Ballavgarh factory.

Studying the problem related to Wastewater disposal where there was no drainage system. Designed ETP with recycle scheme for Dairy effluent. Discussion with Kwality Dairy to prepare suitable scheme. Preparation of process design, prepare the proposal for submission, attending the technical discussions, preparation of techno-commercial clarifications, presentation of seminars and attending negotiation meeting to finalise the contract. Helped the project co-ordination team. Part of the team while commissioning the plant.

1.10 NTPC LTD, Talcher, Super Thermal Power Plant - 500 m3/h capacity Fly ash Water Recycle Plant.

Preparation of process design, prepare the proposal for tender submission, attending the technical discussions, preparation of techno-commercial clarifications, and attending negotiation meeting to finalise the contract. Helped the project co-ordination team. Part of the team while commissioning the plant.

1.11 Samtel Colour Ltd, Ghaziabad – 100 m3/h ETP and 75 m3/h Recycle plant (Picture Tube Manufacturing Plant)

Studying the problem related to Wastewater disposal which is having various heavy metals like Fe, Mn, Zn, Cr etc. and highly complex in nature. Discussion with Samtel and their Japanese consultant to prepare suitable scheme for heavy metal precipitation. Preparation of process design, prepare the proposal for submission, attending the technical discussions, preparation of techno- commercial clarifications, and attending negotiation meeting to finalise the contract.

CV – PARTHA DEBNATH – SENIOR PROJECT MANAGER

Page 14 of 14

14

Languages Known:

Speak Read Write

English Excellent Excellent Excellent

Hindi Excellent Excellent Excellent

Bengali Excellent Excellent Excellent

References:

1. Mr. Manhal Al Kindi – Ex-Senior Area Manager – Haya Water (Mob : 004*-********)

2. Mr. Rajesh Kumar Verma – Senior Electrical Engineer, M/s Haya Water, Oman (Mob : 00968 – 79039133)