Post Job Free

Resume

Sign in

Manager Office

Location:
Winston-Salem, NC
Posted:
October 09, 2020

Contact this candidate

Resume:

Jeffrey Alan Long *** Clubb Rd., Kernersville, NC 27284 MAILING ADDRESS: PO BOX 1501, Kernersville, NC 27285 336-***-**** adgtjr@r.postjobfree.com

Objective: General Superintendent Position, Estimating, Safety Director, Commercial, Industrial, Residential Construction Field Manager Position

Owner’s Representative- Commercial Construction Oversite and Quality Assurance

Experience: * 30+ Years, Construction Related Field Work (Concrete Construction, Property Development, Telephone Lineman, Telecom Systems, Security Systems, Drafting, Heavy Excavation, Heavy Equipment Operator, Footings and Foundations, Structural Steel, Light Gauge Steel, Water and Weather Proofing, Underground Utility (Sewer, Storm, UG Communications and Electrical Systems), Human Ergonomics, Customer Service, CAM Improvement, Commercial Property Remodeling Consult & Feasibility Assessment, Estimating and Design Build Project Development * 20 Years, Commercial Construction, Project Management & Superintendent (99’ to Present) * 15 Years, Licensed NC General Building Contractor (05’ to Present)

Previous Employers:

(From1987 To1999) Winn Dixie Grocery Stores, Sears Mail Order Warehouse, Pizza Inn, New Garden Landscaping and Nursery, Duke Power Meter Reader, Four Seasons Concrete, NTT/COMSYS/SHINTSUSHIN, ATT/MCI, DOD-DECA&USN-MWR-Pool Manager, Food Services, Tour Guide-Mt. Fuji Japan, Food Lion Stores, NC Security, American Carpentry Services (SE)

Ryback Construction Co., Greensboro, NC (8/99 to 8/03), Commercial Superintendent Commerical Construction Management- Commercial Upfits and New Construction, <100K – 4.5MIL (UNC-G STUDENT HOUSING, WALKER AVE. AND ELAM AVE (GSO,NC), JEFFERSON SQUARE (HORSE PEN CREEK RD., GSO, NC), MULTIPLE DENTAL AND MEDICAL UPFITS (GSO, NC), MULTIPLE OFFICE STRUCTURES AND SITE DEVELOPMENT PROJECTS (GSO, NC)

American Builder Construction, Inc., Kernersville, NC (In Business since 1996) (8/03 to 11/05, Incorporated 11/05 to Present), President Limited NC General Commercial Contractor- Dental&Restaurant Upfits&Remodeling, Home and Commercial Additions&Remodeling <100K - 300K

Weaver Cooke Construction Co., Greensboro, NC (1/20 to 6/20), General Superintendent, Multifamily-Affordable Housing Construction Manager. Oversaw the Ground Up Construction of a Large Apartment Complex in the North Charlotte Area, off Brookshire Boulevard/Hwy 16.

DH Griffin Construction Co., Greensboro, NC (4/08 to 1/20), PM-General Superintendent Commercial Construction Manager- Retail Demolition, Large Commercial and Industrial Projects, Manufacturing, Medical&Hospitals(, Malls, GUILFORD COUNTY DETENTION CENTER(90MIL), Higher Education(WFU,UNC-G,A&T), Hospitality, Retail Upfitting, Elevators, Banks, Heavy Underground Utility, Restaurants, Project Pre-Bidding, Bidding, Estimating, <1MILLION - 90MILLION (GCDC A JOINT VENTURE, DHGC&BALFOUR BEATTY CONSTRUCTION)

Education:

NW Guilford High School, Guilford County, NC, 1989

University of Maryland, College Park, MD (Asian Division) BA, Business Management, 1994 (Completed with a 3.4 GPA)

Troy State University, AL (Asian Division), MS Management (Partial, 4.0 GPA, NO DEGREE)

Special Skills:

Timberline, Sagebrush, Milestone Scheduling, Excel Spreadsheets, Power Point, Proline, Procore Level 4 Japanese Language Proficiency Certification, Personal Skills and Health Development, I am a Hardworking Professional, an Outdoorsman and a Dedicated Father with (2) Children One Daughter In College and My Son is a 9th Grader, in his first year of High School

Projects: DOUBLETREE HOTEL, ELEVATOR SHAFT ADDITION

SPRING - WINTER 2008 CAPITAL IMPROVEMENT PROJECT

Owner

Milestone Development Group, LLC

Location

Greensboro, NC

The Doubletree Hotel, Elevator / Shaft Addition project at I-40 and High Point Road in Greensboro NC was a Capital Improvement Project to the 175 Guestroom Hotel with 4,350sf of Banquet Space. Two existing elevators at the 12 Story Hotel were not sized to accommodate an Emergency Rescue Stretcher. Per Hilton-Doubletree Standard the Deluxe Gen-2 Otis Elevator & Shaft was constructed under my supervision. Jeff Long, Superintendent, DH Griffin Construction Co., LLC.

WFU BENSON STUDENT CENTER

FOOD COURT RENOVATION AND SHORTY’S KITCHEN ADDITION

WINTER 2008 – SUMMER 2009 HIGHER EDUCATION PROJECT

Owner

Wake Forest University

Location

Winston-Salem, NC

The Benson Food Court project at Wake Forest University was a multi-phased interior renovation and addition project. The facility has a full-service restaurant, four quick-service restaurants, and a convenience store. Disturbances to students, faculty, and staff occupying the building were kept to a minimum, and quiet-periods for exams were observed.

“During the Wake Forest University Benson Food Court renovation project, it was clear that the D.H. Griffin Construction Co. team understood the challenges of working on a tight university site with an aggressive schedule. They minimized disruptions, accomplished the job in a professional fashion AND kept our food service in continuous operation throughout the phased project.”

Jim Alty

Associate VP – Facilities, Campus Services

SHORTYS PIC, ZOCA’S PIC, FRESHEN’S PIC, BENSON CENTER PIC, CHICK FIL A PIC

GUILFORD COUNTY DETENTION CENTER

SUMMER 2009 TO FALL 2010 BALFOUR BEATTY / DH GRIFFIN CONSTRUCTION A JOINT VENTURE PROJECT (90 MILLION)

Owner

Guilford County, NC

Location

Greensboro, NC

This project is a 1,200-cell expansion detention center located adjacent to the existing Guilford County Detention Center Facility in downtown Greensboro, NC, to which it is linked via an underground tunnel. The building is an eight-story, 380,000-sq.-ft. facility. After transitioning to the new facility, the existing detention center was renovated with a fire sprinkler system.

NC A&T ACADEMIC CLASSROOM BUILDING

FALL 2010 TO SPRING 2011 HIGHER EDUCATION (21 MILLION)

Owner

N.C. A&T State University

Location

Greensboro, NC

The 88,674-sq.-ft. new construction building at NC A&T State University provides the university with state-of-the-art classrooms and a learning environment designed to enhance collaboration. The new building is a three-story multi-use building that serves the entire spectrum of the University’s student body, offering classrooms, offices, and a spacious central lobby. Also included are supplementary support/flex spaces such as shared conference rooms, a faculty lounge, and informal student-faculty meeting spaces.

SEARS OPERATIONS CENTER, CALL CENTER, OAK HOLLOW MALL, HIGH POINT, NC (2011)

OFFICE/COMMERCIAL

D.H. Griffin Construction transformed a vacant retail space into a 35,000-sq.-ft. operations/call center for Sears. This new facility includes a call center floor, offices, break rooms, bathrooms, and support areas. The project included new ceilings, lighting, flooring, paint throughout. The call center floor was wired with 125 call stations. Our team integrated two new air conditioning units into the existing system to provide separate controls for the new break room and server room.

TOYS & CO. (2011)

RETAIL UPFITS

Owner

CBL & Associates Properties, Inc.

Location

The Shops at Friendly Center, Greensboro, NC

The Toys & Co. project combined multiple small shops to form one 7,000-sq.-ft. space on a fast-track schedule.

ULTA (2011&2012)

RETAIL DEVELOPMENT

Owner

Accent Construction Management

Locations

Asheville Mall, Asheville, NC and Valley View Mall, Roanoke, VA

The ULTA projects: 11,000+ sq.-ft. tenant space reconfigurations and renovation projects located inside busy shopping malls. The projects combined several small shop spaces into one contiguous space, respectively, and added new exterior facades, storefronts, and utility services.

GANDER MOUNTAIN (2013)

RETAIL UPFITS

Owner

Gander Mountain

Location

Greensboro, NC

DHGC worked directly for Gander Mountain to renovate an existing store with new interior finish upgrades, including millwork, paint, carpet, and murals. The project also refreshed the building exterior.

COMMUNITY ONE BANK RELOCATION (2013)

OFFICE/COMMERCIAL

Owner: CBL & Associates Properties

Location: Greensboro, NC

This was a multi-faceted project with the ultimate goal of accommodating a CommunityOne Bank branch in an existing Class B office building. The existing building exterior consisted of exposed aggregate precast panels and red brick typical of 1970s-era architecture. In order to modernize and re-brand the building facade, our team applied EFIS cladding to the upper parapet and painted the brick a dark grey. A dual-lane drive through utilizing vacuum tubes and video displays was added in the center of the parking lot, which we also repaved and reconfigured. After relocating the previous tenants, four existing suites were combined and the space for the new CommunityOne Bank branch was built out with Class B+ finishes.

(2012-2013) CONVATEC

INDUSTRIAL

Owner

ConvaTec

Location

Greensboro, NC

Since 2012, D.H. Griffin Construction has been involved in numerous design-build projects for ConvaTec, a global medical products and technologies company, at one of its manufacturing sites in Greensboro, NC. The first project completed was a renovation to the facility’s front entrance, visitor center, reception lobby, and training room. After stellar performance on this project, DHGC was once again retained to complete a pilot laboratory. Work on this project, and several subsequent projects, was completed on an accelerated schedule in ConvaTec’s 24/7 operating environment, often requiring multiple shifts to be completed.

One of the more complex projects D.H. Griffin has completed for ConvaTec was the lowering of nearly 18,000 SF of ceiling above an active manufacturing area. Our team salvaged the existing ceiling grid and most ceiling tiles for later reinstallation, while installing recessed lighting and completely reconfiguring life safety and HVAC systems. Manufacturing operations were uninhibited throughout construction.

Our team has also completed two projects for this owner where all construction work occurred during a small three-week shutdown window coinciding with the holiday season. The first was the renovation of an 11,000 SF Class 100,000 clean room. As a result of the renovation, new FRP walls and finishes were provided and ceilings repaired. The resultant project passed its clean room test on the first inspection. Also completed in only three weeks, our team upgraded the facility’s 3,200 SF cafeteria; including new flooring, lighting, ceiling tile, millwork, serving line, and cooking and refrigeration equipment.

(2012) NUSSBAUM CENTER FOR ENTREPRENEURSHIP

OFFICE/COMMERCIAL

Owner

Nussbaum Center for Entrepreneurship

Location

Greensboro, NC The Nussbaum Center for Entrepreneurship is an entrepreneurial community that provides below market-rate office spaces for fledgling businesses and is the largest small business incubator in North Carolina. This project renovated 56,000-sf of aging office into Class B+ office space to provide a new home to over 40 different budding companies. Work included a new: roof, windows, ceilings, carpet, paint, entry with canopy, elevator, parking, and ADA accommodations. A portion of the building serves as a campus for GTCC. This project was very much time and budget critical, requiring our team to meet an aggressive schedule in order for our client to take advantage of grant monies with expiration dates. The project stayed within the budget, which was determined by private fundraising and public grants, and finished on-time.

(2012-2013) DHL CANOPY AT PIEDMONT TRIAD INTERNATIONAL AIRPORT

INDUSTRIAL

Owner

Location

Greensboro, NC

15,000 SF of existing, vacant warehouse space received a 2,500 SF office renovation that included a new 30 exterior truck ramp, as well as new HVAC and life safety systems, break room, IT room, parts room, overhead door, and a fenced storage area behind the offices.

(2014-2020) RECENT PROJECTS LIST

(2014)CBL MAIN OFFICE MOVE TO RENOVATED SPACE AT FRIENDLY CENTER

(2014) HAND AND STONE DAY SPA, THE SHOPPES AT FRIENDLY CENTER, GSO, NC

(2015)HIGH POINT UNIVERSITY (HPU), MONTLIEU ENTRANCE WEST (UNDERGROUND UTILITIES PORTION OF PROJECT- FOOTINGS AND FOUNDATIONS)

(2015)RENAISSANCE CENTER, BLDG#6, 3 TENANT-STAND ALONE BRICK SHELL, NEW CONSTRUCTION, DURHAM,NC

(2015)HANDCOCK FABRICS STORE (DEMO+RENO15,000SF), RANDOLPH MALL, ASHEBORO, NC

(2015)BENT TREE PLAZA FAÇADE RENOVATION, FALLS OF NEUSE RD, RALEIGH, NC

(2016)BATTLEGROUND VILLAGE, FAÇADE RENOVATION, BATTLEGROUND AVE., GREENSBORO, NC

(2017)MOES RESTAURANT UPFIT AT FRIENDLY CENTER, GREENSBORO, NC

(2017)DEMOLITION PROJECTS, TEX&SHIRLEY’S PRIOR TO CONST. OF ONE FITNESS AT FRIENDLY CENTER / DEMO OF BUILDINGS AND ENVIRONMENTAL ABATEMENT- CLOSURE OF MARTINSVILLE RD. AND BATTLEGROUND AVE PRIOR TO RICE TOYOTA PL EXPANSION

(2017)RICE TOYOTA VEHICLE SALES PARKING LOT EXPANSION, BATTLEGROUND AVE., GSO, NC (2 LOCATIONS ON BATTLEGROUND AVE, 1)10,000SF 2)100,000SF

(2018-2019) WEST RIDGE SQUARE, FAÇADE RENOVATION, BATTLEGROUND AVE., GSO, NC

(2018-2019) HANES MALL PROJECTS, (LENSCRAFTERS, CHAMPS, EGRESS RENOVATIONS FOR VICTORIA SECRET & MALL ELEVATOR AND ESCALATORS) WINSTON SALEM, NC

(2019) WEST RIDGE SQUARE, FAÇADE RENOVATION, BATTLEGROUND AVE., GSO, NC

(2019) NAPA AUTO PARTS STORE UPFIT, WEST RIDGE SQUARE, BATTLEGROUND AVE., GSO, NC

(2019) QUAKER VILLAGE SHOPPING CENTER, CANOPY DEMOLITIONS AND RENOVATION

(2019) HPU, MAIN CONFERENCE CENTER, ROBERTS HALL RENOVATIONS, HIGH POINT, NC

(2019 TO JANUARY 2020 ) OTHER MISCELLANEOUS PROJECTS, SERVING AS SUPERINTENDENT AT DHGC

JANUARY 2020 TO JUNE 2020, SUPERINTENDENT, WEAVER COOKE CONSTRUCTION CO.

WORKED ON PHASE 1 OF A 2 PHASE APARTMENT BUILDING PROJECT, AN ‘AFFORDABLE HOUSING/NC TAX CREDIT’ PROJECT, OFF OF ‘BROOKSHIRE BOULEVARD’ IN THE NORTH CHARLOTTE AREA.

JUNE 2020- PRESENT (OCTOBER 6, 2020)

MISCELLANEOUS REMODELING AND CARPENTRY PROJECTS INCLUDING EXTERIOR REPAIRS TO CEMENTIOUS SIDING, BATHROOM AND KITCHEN REMODELING, CUSTOM TILE INSTALLATIONS, EXTERIOR DOOR REPLACEMENTS, AND WORKING WITH REAL ESTATE AGENTS TO PRICE WORK NEEDED TO COMPLETE THE SALE OF THE HOUSE BETWEEN THE CURRENT HOMEOWNER AND THE NEW HOME OWNER

THANK YOU FOR YOUR TIME AND CONSIDERATION FOR EMPLOYING ME WITH YOUR COMPANY.

SINCERELY,

JEFFREY ALAN LONG 336-***-****

adgtjr@r.postjobfree.com



Contact this candidate