Post Job Free

Resume

Sign in

Civil Engineer Engineering

Location:
Egypt
Posted:
October 06, 2020

Contact this candidate

Resume:

*

PERSONAL INFORMATION

Khaled Mohamed Azab

Ismailia-Fayed-Serapeum st7

(002) 010-***-***-**

(002) 012-***-***-**

adgpx0@r.postjobfree.com

https://eg.linkedin.com/in/khaled-azab-9a7759b0

Marital status Married Date of birth 15 Dec 1989 Nationality Egyptian Military Status Exempted

Career Objective

My main objective for this stage of my life is to work in an organization which manages me to gain new technical skills and to participate in achieving the organization’s target. Education

15 Sep 2011–24 August 2016 Faculty of Engineering

Civil Engineering

Future University in Egypt (FUE) in cooperation

with University Of Cincinnati In USA (UC)

Graduation project: Project Management

Grade of Project: A

15 Sep 2006–30 Jun 2011 Faculty of commerce

Accounting

Suez Canal University

Courses& Certificates

- Project management at AUC PRMG course:

- PRMG 010 planning and control techniques

- PRMG 020 Management of project resources

- PRMG 025 Project Management International Standards

- PMP preparation Course

- Safety & Health For Construction Industry In Accordance with OSHA – CFR 1926 (10 H) 2

Computer and language skills

- Primavera: General user Arabic: Mother language

- AutoCAD: General user English: Good speaker

- Microsoft Office: Good user (ICDL Certificate)

- SAP 2000: General user

Work Experience

Jun 2020 – Until now QA/QC Engineer / Crec-Avic Consortium Project Description LRT project is a Mega project, it covers 75 kilometers and consist of 12 stations and 6 bridges &2 tunnels. connect the region’s upcoming Administrative Capital with other districts around Greater Cairo. In addition to the Depot (The maintenance workshop of the railway train LRT) and it consists of 26 buildings. Responsibilities I am responsible for:

- Mainly I am responsible for the Depot area.

- Perform inspection for all the Civil works inside the Depot.

- Following up the concreting works and attend testing for concrete, materials and earth works to make sure it meets the project standards through following up the third-party personnel.

- Coordinate between the different disciplines (Arch.,Str.,Elec., Mech,.) through the weekly coordination meetings.

- Raising the NCRs if needed and recording them inside the Log.

- Receiving the IRs from the subcontractor and recording them inside log and following the inspections for them by coordination and reviewing the drawings to see if there’s a conflict between different disciplines.

- Performing inspection for all the materials delivered to site and making sure they all are approved according to project specs and recording this cycle through the MIRs and MRRs document. 1 Jan 2019 – Jun 2020 QA/QC Engineer / Vinci & Orascom JV for construction Project Description Construction of the third phase of the third line for Cairo Metro. This project is an Egyptian French joint venture between Orascom, Vinci Construction Grands Projects (France), Arab Contractors and Bouygues Travaux Publics (France) with BAUER as a subcontractor for diaphragm walls execution. This phase is 17.7 Km and consists of 15 stations (8 underground & 2 at ground & 5 elevated). 3

Responsibilities I am responsible for:

- Performing inspection for all of civil works starting from the guiding walls through the station excavation and construction of all the structural elements of the station like roof slabs, capping beams, ticket slabs, raft and barrettes.

- Performing inspection for the steel cages of diaphragm walls before and during installation inside the excavated trench.

- Performing inspection for the diaphragm wall excavation activity which is executed by BAUER.

- Performing inspection for the drilling and grouting activities until reaching the plug pumping test.

- Performing inspection for all the materials delivered to site and making sure they all are approved according to project specs and recording this cycle through the MIRs document.

- Following up the concrete testing works inside the site through the laboratory technicians.

- Performing inspection for the water tightness activity. 1 Feb 2017 – 31 Dec 2018 QA/QC Engineer / Orascom for construction Project Description Construction of the Post Said Tunnels which were extended under The Suez Canal from the west to the east of the Canal. The Project executed by two main contractors Orascom and Arab Contractors with Systra as a consultant.

Responsibilities I was responsible for:

- Responsible for concrete materials, batch plants, concrete fresh and hard, and mix design trials in the project.

- Performing inspection in precast concrete factory for Segment repairing and pre-pouring inspection.

- Performing inspection in the steel yard for the steel cages reinforcement before getting installed in the diaphragm wall excavation and following up the documentation cycle in the west side.

- Performing inspection for all of civil works of construction inside the tunnel and cut and cover.

- Performing inspection for the water proofing activity for cut and cover.

- Performing inspection for all the materials delivered to site and making sure they all are approved according to project specs and recording this cycle through the MIRs document.

- Creating the ICLs and IRs for all the activities and preparing NCRs if needed in addition to documenting them.

- Participating in preparing the ITPs for several activities. 1 Jan 2017–31 Jan 2017 QA/QC Engineer / Concord for construction and contracting 4

Project Description Construction of the Ismailia Tunnels which were extended under The Suez Canal from the west to the east of the Canal. The construction was executed by two main contractors Concord and Petrojet with the CDM SMITH as a consultant.

Responsibilities I was responsible for:

- Inspection of tunnelling segment quality in the segment yard and during the loading and after loading according to the prescription of the project.

1 Oct 2016 –31 Dec2016 Site Civil Engineer / Suez Chem Project Description This Project was construction of the roads of the Suez University the summation of lengths of roads were 7 KM. Construction of these roads was including excavation, Replacement soil, Sub-base, Base soil, Pavement and extending the tubes which will carry the electricity and data lines and construction of checking rooms for these lines.

Responsibilities I was responsible for:

- Supervising the Excavation, Putting the sub-base and base layers according to the specified Levels

-Supervising the test for the base and sub-base soil (Compaction Test)

- Managing the site including managing Labourers and machines. 16 Aug2010–1 Oct2011 Material lab technician assistant / Vinci for construction Project Description Constructing the Cairo Metro Line three phase 2 from Abbasia to Cairo fair using TBM machine. And this project was executed by Egyptian French J.V.

(Vinci – Bouygues – Arab contractors – Orascom)

Responsibilities I was responsible for performing all of the tests related to

- Aggregate -Asphalt

-Concrete - Soil

Trainings

01 Sep 2015-16 Sep 2015 Civil Engineer Trainee/Vinci Construction Project description Constructing The Cairo Metro Line three phase three from Cairo Fair to Alf Maskan using TBM machine by the French company (Vinci) which I was training for with a joint venture with Orascom.

01 Sep 2014-16 Sep 2014 Civil Engineer Trainee/Vinci Construction Project description Construction of new barrage at Asuit in Upper Egypt this project was constructed by several companies like Vinci and it was the company that i 5

had the training with it and Moharram Bakhoom as a consultant under the authority of German consultant.

Oct 2009-Aug 2010 Chartered accountant Trainee

Job description Chartered accounting office has two major roles: 1- First one is to follow up and revising the variable companies accounts and at the end of the year creating the financial statement 2- Second one is establishing new companies by following the procedure of establishing it by dealing with the variable governmental authorities like income Taxes authority, ministry of Investment and ministry of industry and foreign trade.



Contact this candidate