CURRICULUM VITAE
BRIAN V. VIDALLO
*** ****** **** *********, **, S7T 0A7
adgo7j@r.postjobfree.com
STATUS : AIT CERTIFICATE
POSITION APPLIED : PIPEFITTER - STEAMFITTER
I. WORK EXPERIENCE:
Company : KBR under Suncor
Address : 1302 10th St Nisku, AB Canada
Position : PIPEFITTER-STEAMFITTER
Duration : February 17, 2020 - March 24, 2020
project : Suncor Base Plant FortMcmurray
Duties and Responsibilities:
• Read isometric drawing and interpret blueprints specification
• Assist in forean’s work, layouting and fit-up of pipe supports
• Checking dimension of ISO drawing
• Install supports, valves, piping and control system Company : Technical Workforce Inc.
Address : 99 Station T Calgary AB, T2H 2G7
Position : PIPEFITTER-STEAMFITTER
Duration : October 31, 2019 - November 21, 2019
project : Trans Canada Amber Valley Project Alberta Duties and Responsibilities:
• Select type and size pipe required
• Assist in foreman’s work, layouting and fit-up of pipe supports
• Cutting and beveling of pipes
• Test system for leaks using testing equipments
Company : Technical Workforce Inc.
Address : 99 Station T Calgary AB, T2H 2G7
Position : PIPEFITTER-STEAMFITTER
Duration : September 16, 2019 - October 24, 2019
project : Rocanville Potash Project Saskatchewan
Duties and Responsibilities:
• Inspect and test pipe systems
• Measure, cut and bend pipe to required shape using hand and power tools
• install supports, valves and fittings
• Kept job site clean and organized
Company : PCL ENERGY INC.
Address : 9744-45 Avenue Edmonton Alberta T6E5C5
Position : PIPEFITTER-STEAMFITTER
Duration : October 5, 2016 - November 10, 2017
project : Fort Hills Project under Suncor Fort Mcmurray Duties and Responsibilities:
• Assigned at fabrication shop performs fit-up of AG/ UG pipes spool for orbital welding
• Checking dimension of ISO drawing
• Fit-up of all kinds of pipe such as stainless, carbon steel, alloy to fit for AG/ UG crude oil pile and pipe rack
• Erect and install pipe stool for flare line and motor dump, area 16 central processing facility Company : PCL ENERGY Inc.
Address : 9744-45 Avenue Edmonton Alberta T6E5C5
Position : PIPE FITTER
Duration : August 29, 2013 – February 24, 2015
Project : JV Vault Potash Project Saskatoon
Duties and Responsibilities:
• Read and interpret drawings blueprint and specifications to determine layout requirements
• Select type and size pipe required
• Weld braze, cement, solder and thread joints to join pipes and fabricate section of piping system
• Install supports, valves, piping and control system
• Clean and maintain pipe units and fittings and flush system Company : URS Flint
Address : 100, 2899 Broadmoor boulevard Sherwood Park, Alberta T8H1B5
Position : PIPE FITTER
Duration : May 8, 2013 - July 24, 2013
Project : Cristina Lake Project MEG Energy Phase IIB Duties and Responsibilities:
• Read isometric drawing and interpret blueprints specification
• Layout and fit up air blowing and tank closure
• Fit up on installation of different kinds of fitting like flange tee elbow
• Reduces small and large pipe spool and hydro testing of high pressure of pipes fabricator of fittings like elbow, saddles installation of piping's spools and large use of heavy equipment like cranes and necessary tool.
Company : TEAMCO CONSTRUCTION SERVICES LTD
Address : Box 42042 Millbourne RPO Edmonton Canada Position : PIPE FITTER
Duration : June 26, 2012 - March 10, 2013
Project : At the Blackfalds Modular Yard
Duties and Responsibilities:
• Installation of pipelines during overhauling of boilers, reactors and its auxiliaries.
• Assigned in all piping works and structural works such as fit-up and grinding preparation of all piping materials like flanges, elbows(45 & 90) concentric and eccentric reducers, bolts, nuts, etc. Company : HIAPSENG ENGINEERING LTD.
Address : #41 Benoi Place, Singapore / 629425
Position : PIPE FITTER
Duration : December 20, 1998 - November 24, 2000
Project : Under Chiyoda Kelloge JVT Exxon Chemical Project Pulau Sakra
Duties and Responsibilities:
• Assigned at punch list piping group install gasket bolt valve and complete at piping line by installing pipe and fittings line.
• Checking all line of punch item comment install the isolation valve of instrument such as block bleed valve monoblock valve and alignment all rectify pipe in the motor pump.