*.Proposed position:
*.Family name:
*.First names:
4.Date of birth:
5.Nationality:
6.Civil status:
7.Contacts:
8.Mail:
9.Skype
10.Address:
11.Education:
College of Civil Engineering and Surveying
Bachelor of Civil/Civil Engineer.
Language Reading Speaking Writing
Serbian Native speaker
English 1 1 1
Russian 1 2 3
13. Other skills: (e.g. Computer literacy, etc.):
14. Present position:
15. Key qualifications:
16. Specific experience in the region and abroad:
17. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned / Professional Experience Record: Location
Company
Position
Description
Brief project description:
Microsoft Office, AutoCAD and several scientific programmes. Fully familiar and very experienced with British, American FIDIC Red,Yellow and Silver book contract procedures and practices.
STUCKY.ltd a Gruner company,Employer Representative/Supervision of roads and bridges Nenskra Hydro Power Plant,280MW,135m high asphalt concrete face rockfill dam. Mr. Aleksandar Dimitrijevic has over 15 years of working experience in civil engineering, design, construction and supervision of roads, highways and buildings. He is familiar with FIDIC regulations and has experience in its implementation in Europe and Overseas as Site Engineer and Construction Manager positions. Last three years he has worked at position of– Site Engineer/Construction Manager on new construction of highways in Serbia and Nigeria financed by EIB and EBRD/State government of Nigeria, acc to FIDIC Rules. Serbia, Russia, Nigeria,Georgia
12.Language skills (1-excellent, 5 - basic):
CURRICULUM VITAE
Degree(s) or Diploma(s) obtained
Civil Engineer
Dimitrijevic
Aleksandar
27.08.1980
Serbian
Married
*****************@*****.***
acadim1980
Narodnih heroja 57/6,11000 Belgrade,Serbia
Institutions:
Nenskra Hydro Power Plant Project
Client: : JSC Nenskra Hydro/Key Water (South Korea) Project Value :720 mil. EUR
EBRD/Korea Development Bank financed for Nenskra Hydro Project – Fidic Silver Book(EPC Contract)
Asphalt Concrete Face Rockfill Dam(AFRD) with 135m height and 820 m crest length(reservoir storage capacity 176 mil m3.
Access Roads(8 roads with the ovearall distance 35km) Composit Bridges(10 pcs) Headrace Tunnel including Intake and Surge Shaft with lenght 15.1km and 4.5m diam Surface powerhouse of 280MW(3x93MW)capacity with pelton turbines. Intake weir of the River Nakra with 9m height,44m crest lenght. Transfer Tunnel Nakra with lenght of 12.5km and 3.5m diameter Responsibilities: Responsible engineer from Employer representitive side for the supervision of construction works- Roads and Bridges(earth works,concrete works)@Supervision Engineer for the execution of access roads-excavation,embankments,subbase and base course-2 layers of well graded crashed stone with reinforced shoulder.
main acces road RE-1 with overall distance of 14.5 km,leading up to the Dam. Road Rn2-bis leeads up to the Dam crest right side,distance 2.8km. Roads LN3/4/5 Bis -three serpentine roads leading up to the Surge shaft/Valve Chamber and Addit Tunnel,overall distance 5.2km.
Road LE-8 (2 sections)connection to acces road RE-1,total distance of 2.3km Road LN-6Bis,access road leading to the Dam crest left side,distance 2.8km Road LE9 leading up to the Nakra Transfer Tunnel with distance of 7.4km
@Supervision for execution of 10 composit bridges performed by main contractor(Salini Impregilo)
@Review of preliminary(basic design)as well as,reviewing of detailed design prepared by Contractor,suggested neccessary improvments,in order to ensure cost efficency and reduce any risk for Employer.Recomendation of Det Design for final employers approval.
@Control and supervision of ongoing and finished works acc to specifications,dwgs and calculation.
@Preparation of monthly site progress reports
Date: from (month/year): 09/2017 – present
Republic of Georgia, Svaneti
Stucky a Gruner company
Employer Representative/Supervision/Civil works-Roads and Bridges Location
Company
Position
Description
Brief project description:
Wearing course
Binder course
Cement stabilization
CSA 0/31,5
CSA 0/63
Concrete structures
Reinforcement
Location
Company
Position
Description
Brief project description:
Wearing course –
Binder course –
Stone base course–
Subgrade -
Concrete structures-
Reinforcement-
Location
Company
Position
Description
Brief project description:
Construction of phase III Abak Nsheke Ikot-
Nkuk Ikot Ikara Highway-14km
Client: Ministry of works, Akwa Ibom-Nigeria,
Project Value :50 mil. USD
Date: from (month/year):
Date: to (month/year)
01/2014 – 01/2015
Project Value 1.5billon. USD
Completely new architectural and construction structures(4 reservoirs-20000m3 each, steel and concretepiles,foundation and embankments,retaining walls,access roads,new construction of Pipeline
23.250,00 m3
191.250,00 m2
20.000m3
2000t
World Bank project financed for motorway Dimitrovgrad bypass – Fidic Red Book Contract. Remaining works of highway profile, flexible asphalt payment. Remaining construction of 7 Responsibilities:
Date: from (month/year): 07/2016 – 09/2017
Republic of Serbia, Dimitrovgrad
Aktor SA
Construction Manager
Responsibilities:
Republic of Nigeria,Uyo,Akwa Ibom state
Hammakop consortium limited-Nestoil group
Site Engineer-Construction Manager
Date: from (month/year):
Date: to (month/year)
02/2015 – 05/2016
26.400,00 m3
39.600,00 m3
39.600,00 m3
10.000,00 m3
5.000,00 t
132.000,00 m2
132.000,00 m2
Construction of highway E80, Dimitrovgrad bypass-border crossing (remaining works) Client: : Corridor X d.o.o. – Koridori (Corridors of Serbia) Project Value :20 mil. EUR
World Bank project financed for motorway Dimitrovgrad bypass – Fidic Red Book Contract. Remaining works of highway profile, flexible asphalt payment. Remaining construction of 7 bridges (spain between 30and 170 m lenght ),concrete structures like retaining walls,under passes,pipe and box culverts,median channels,rigol,stone curbes Responsibile person for execution of the overall works-as a Construction manager(main contractor),
Supervision of construction works – earth works, concrete works and asphalt works Organisation of excavation,embankments,blasting and all remaining layers of road(crushed stone aggregate0/63,0/31,5,cement stabilization,binder course,wearing course) Preparation of monthly site progress reports
Responsible of quality assurance, health and safety control, environmental protection on site Direct contact with Client and Engineer at site
Responsibilities: Responsible person for execution of the overall works – as a Site engineer(main contractor), Site management,coordination of workers for the architectural and construction work(construction of concrete and steel piles,embankment and foundation for and foundation for huge reservoirs 20000m3,access roads, appurtenant structures),
107.500,00 m2
Responsible person for execution of the overall works – Construction Manager Tasks Supervision of construction works – earth works, concrete works, asphalt Contract and Claim management
Preparation of monthly site progress reports,Project cost control,working budget, Responsibile of quality assurance,health and safety control,enviromental protection at site, Direct contact with Client and Engineer at site,
Inspection and check of materials and works to ensure compliance with specifications,and/or removal and substitution of improper materials and/or work as required, Ensure thatthe construction work is accomplished in accordance with the technical specifications, Borrow pit organisation.
154.500,00 m2
Main oil pumping station 1,Russia Siberia, construction of the Kujumba-Taiset pipeline Client: Transneft-oil and gas company, Russia
Republic of Russia, Siberia- Kujumba
Velesstroj Doo
Site engineer
Asphalt pavement
Concrete structures
Reinforcement
Earth works
Location
Company
Position
Description
Brief project description:
River regulation
Earth works
Concrete structures
Reinforcement
Location
Company
Position
Description
Brief project description:
Concrete structures 18.000m3
Reinforcement 6000t
Location
Company
Position
Description
Brief project description:
1.8 mil m3
75.000 m3
16.000 t
5000m new double track tramway tracks
Reconstruction of double Tramway track, Careva cuprija UMP I phase Client: Belgrade land development-public agency
Project Value 3 Mil. Euro
Reconstruction of double tramway track,
Project consist of complete replacement of tramway tracks, existing pavement, includingexcavation and building subbase, subgrade, as well as laying a completely new tram road, lot of retaining walls, and structures for sliding protection irrigation channel displacement in side urban area
Responsibilities: Site management(coordination of subcontractors), Supervision of construction works – earth works, concrete works, Responsible for quality, safety environmental protection, Contract and claim management,
Monthly side progress reports, cost control,
Contact with engineer and client.
Preparation of monthly site progress reports, Project cost control, working budget, Responsible of quality assurance, health and safety control, environmental protection on site, Direct contact with Client and Engineer at site.
2 km
Date: from (month/year):
Date: to (month/year)
08/2009 – 11/2011
50.000,00 m2
150.000,00 m3
30.000 t
1.2mil m3
Project: Highway E – 80 Pirot – Dimitrovgrad, Lot 1 and Lot 2, total length 15 km Client: Corridor X d.o.o. – Koridori (Corridors of Serbia) Republic of Serbia,Belgrade
Alpine Bau Gmbh
Site Engineer
Pirot Republic of Serbia
Alpine Bau Gmbh
Date: from (month/year):
Date: to (month/year)
11/2011-07/2013
Site Engineer
EBRD Loan financed
EBRD project financed for motorway Pirot – Dimitrovgrad, Lot 1 Pirot – Sukovo, Lot 2 Sukovo – Dimitrovgrad – Fidic Red Book Contract.
Completely new carriage way of highway profile, flexible asphalt payment. New construction of 8 bridges ( span between 30 and 170m length), concrete structures like retaining walls, under passes, culverts, stone pitching for River Nisava new alignment. Project Value 60 mil. Euro
Alpine Bau Gmbh
Site Engineer
Residential and Commercial complex,19a park Apartments 65000m2, FIDIC Red Book Contract.
Construction of Residential and Commercial buildings-65000m2,construction of concrete, piles,foundation,slabs,concrete and glass façade, complete electrical installations, parking places and road infrastructures,Enviroment regulation,Fidic red book contract. Date: from (month/year): 07/2007 – 08/2009
Date: to (month/year)
Republic of Serbia,Belgrade
Project Value 31 Mil. Euro
Client: Globe Trade Centre SA GTC
Responsibilities: Responsible person for execution of the overall works – Site Engineer Tasks Supervision of construction works – earth works, concrete works, Coordination of subcontractors to build bridges (prestressed girders,underpasses, overpasses, pipe and box culverts)
Coordination of subcontractors for the construction of transmission lines 110kv and 35kv(construction work)
Coordination of subcontractors for the installation of telecommunication cables
(excavation, laying fiber optic cables and compaction of backfilled material) Contract and Claim management
Preparation of monthly site progress reports, Project cost control, working budget Responsible of quality assurance, health and safety control, environmental protection on site
Direct contact with Client and Engineer at site
Concrete structures
Concrete structures
Reinforcement
Location
Company
Position
Description
Maxi
Maxi
JUB 2
Concrete structures
Energoplast
Vrujci
Hotel Putnik
New Cement Popovac
Associate Engineer
Presevo border crossing
Responsibilities: Site management(coordination of subcontractors and site documentation works),Coordination of subcontractors for all architectural and construction work, Responsible for execution of concrete works (foundations, slabs,beams,walls, façade), Monthly progress report, Cost Control, Health and Safety control, environmental protection, Contract and Claim Management,
Contact with Client and Engineer at site,
Warranty maintenance.
Date: from (month/year):
Date: to (month/year)
Imlek Zemun
Imlek Padinska skela
KBC Zemun
Associate Engineer
• Working out of the project and processing details
• Quality control, monthly progress report, Cost control 90.000m3
30.000t
Residential Complex Block 29 Belgrade
Maxi
Energoprojekt
Republic of Serbia,Belgrade
02/2003 – 07/2007
Reinforcement
Brief project description:
• Control of As build design
Responsibilities:
Block
Krusevac
Delta Maxi Zvezdara
factory paint
factory plugs
water plant
reconstruction
JUB factory paint