A result oriented professional with more than 13 years of experience in Project Operations and Maintenance activities, Process Enhancements and Technical Support from concept to erection and commissioning. Presently associated with M/S Konstelec Engineers Pvt. Ltd. As Resident Construction Manager (RCM) keen executor with exposure in managing entire productions operations with key focus on top line & bottom line profitability by ensuring optimal utilization of resources. Proven abilities in coordinating with vendors, negotiating on costs and dealing with subordinate engineers to ensure seamless operations cost reduction initiatives and implementing quality systems for enhancing plant efficiency. Effective communicator & negotiator with strong analytical, problem solving & organizational abilities.
PROFESSIONAL QUALIFICATION
B.TECH. From Sanmugha Arts Science Technology & Research Academy (Deemed University) in Electronics & Instrumentation Engg. With 1st class in 2006.
CURRENT
Completed the engineering design COURSE in Electrical & Instrumentation from ENGINEERING DESIGN & POWER TRAINING INSTITUTE(EDPTI) Approved by Tata Enterprise (An ISO 9001:2008 Certified Institute)( Approved by HARYANA GOVT.)
.
WORKING EXPERIENCE
PRESENT ASSIGNMENT:
1. Currently working with Konstelec Engineers Pvt. Ltd at HPCL VIZAG- INSTRUMENTATION WORK FOR NAPHTHA ISOMERIZATION UNIT (EPCC-04) FOR VRMP.
2. Previous project completed As Resident Construction Manager (RCM) Konstelec Engineers Pvt. Ltd - at BPCL Kochi Refinery- INSTRUMENTATION WORKS FOR MS BLOCK PROJECT (BS VI MSBP).
Responsibilities:
Work Planning
• Scheduling/ Planning the Site Activities for Sub-contractor & Engineers
• Team Building
• Achieving Billing Targets by in time clearances & Monthly Running Account Bills from customer
• Submission of Progress Report Fortnightly
• Ensure proper Material storage & utilization of Material & Resources at site
• Approval of Measurement Sheets of Site Contractor on Monthly basis
• Ensure compliances to Safety at Work sites & statutory requirements as per Labor Law.
• Verifying ESIC & PF payments by Sub-contractor & Timely Gate Pass renewals
• Track Work Quality
• Ensure safe work & material storage conditions
• Attending MRMs – Monthly Review Meetings with customer & PMC
• Ensure timely collection of payment
• Ensure compliances to safety norms & retention of related documentation/ records until Site Handover.
Asset Management
• Inventory Management
• Managing Accounts, Receivables, Overdue & Liquidated Damages
• Maintain the site drawings & design documentation records, Letter Correspondences (Inward & Outward) for all important, key & formal communications
Knowledge & Skills
• Excellent Verbal & Written communication skills in English, Hindi & Local Languages (optional)
• Strong Leadership Skills
• Action Oriented with strong customer focus
• Basic Skill & Knowledge in Engineering & Management
• Understand Site Management
• Ability to negotiate & manage customer expectations
• Ability to manage the site execution cycle up to Handover & receipt of OCR Be able to interact with customer, convince & manage expectations
Supervision:
• Leading team of approx. 8 Employees & 15 Sub-contractor's Employees
• Reporting to – Project Manager
• Fixed Term Contract with client
• Managing Executions at Minimum Two Different Site Locations in parallel
Relationships:
• Building & Enhancing relationships internally & with customers, vendors, Factory/ Back office support functions
ACHIEVEMENTS :
1.Received Safety Certificate achieving 15 million safe hours for J3 C2 COMPLEX MEG UNIT.
2.Received Safety Certificate achieving 25 million safe hours for J3 DTA PET COKE GASSIFICATION SRU UNIT.
3.Received Completion (APPRECIATATION) Certificate for successful completion of J3 DTA PET COKE GASSIFICATION UNIT.
4.Received Completion (APPRECIATATION) Certificate for successful completion of J3 C2 Complex MEG UNIT from RIL MEG UNIT.
5.Got the certificate for successfully completed the online course Piping & Instrument Diagram.
6.Got the certificate for successfully completed the online course in Introduction to Project
Management using Project 2010.
7.Got the certificate for successfully completed the online course in Piping and Instrument Fields Interface.
PREVIOUS ASSIGNMENT:
1. From Dec 2014 To MAY2019 date working as a Manager (Instrumentation) in M/S RELIANCE INDUSTRIES LIMITED AT RELIANCE CORPORATE IT PARK JAMNAGAR GUJRAT.
i.Currently involve in Shutdown Project in DTA HNUU/ Aromatic shutdown for
ii.Instrumentation Activities.
iii.Successfully completed construction phase project HIIR (HALO BUTYL RUBBER) PLANT, ISBL, OSBL, 2 no’s PIB (PLANT INTERFACE BUILDING) & SUBSTATION.
iv.Successfully completed SEZ PET COKE GASIFICATION CLUSTER-04(H2SO4, CPU, SWS1&2, PIB (PLANT INTERFACE BUILDING) & SUB STATION) SRU UNIT.
v.Successfully completed DTA PET COKE GASSIFICATION SRU UNIT
vi.Successfully completed MEG - Ethylene Glycol unit (Mono) project till product output. .
vii.Project execution for instruments, Invensys IA series DCS, triconex ESD PLC, Honeywell F&G Safety Manager (SIL3) and PLC make CCTV System
1.Material/ Job Planning and Job Execution of all Major Shutdowns.
2.Emerged as member subcommittee like MOC, PSSR, Training, MIQA, and Incident Investigation Team.
3.Managing all verifying and checking of different plant drawings such as PFD, P & IDs,
4.Review of Cause & Effects, Instrument Index, Location Drawings of Instruments, ISOs of instruments and reported the discrepancies in them and rectified
5.Ensuring availability/allocation of both Manpower & Resources for all the contractors effectively for timely execution for all instrumentation jobs for MOC Projects.
6.Preparation of instrument index by reviewing P&ID.
7.Preparation of Instrument I/O list, Schedules and interconnection diagrams.
8.Preparation of cable schedules, junction box details and cable tray layout design.
9.Preparation of Instrument specification sheet, datasheet & instrument installation schedule.
10.Reviewing of vendor packages for Instrument Air Compressor, Plant air Compressor and Instrument Air Dryer.
11.Preparation of Process Hook-ups & Pneumatic Hook-ups, Material Take-Off list(MTO)
12.Coordination with Other Disciplines .
13.Preparation of Interconnection of JB/Marshalling/DCS.
14.Created as built documentation for the changes made in different design documents during commissioning of plants
15.Created instrument database for all instruments included in instrument index for better and fast troubleshooting and easy maintenance
16. Responsible to prepare and present reports on vendors & contractors performance.
17.Coordinate with material coordinator/Projects for material allocation as per monthly plan.
18.Ensure follow up with Instrument and Electrical. Contractor for fabrication of panel base frames, inst. stands and other fabrication of stands supports as per the priority.
19.Ensure that HSE considerations are consistently treated as high priority throughout engineering, construction, and turnover. Completed HSE leadership training in RELIANCE.
20.Act as a leader and role model to promote a robust health, safety, and environmental culture in the project community.
21.Responsibilities with J3 & C2COMPLEX –MEG project.
a) Cable tray installation under access floor
b) Laying of internal earthing, power, signal and field cables as per schedule
c)Jb’s,PDB,LDB AND HT & LT PANELS installation as per given and typical drawing.
d) Project execution for Instrumentation & Electrical of vendor packages compressors (Cycle gas, vent gas & nitrogen gas) and Analyzer House testing and commissioning.
Review and monitor Supplier Quality systems and quality performance.
Review and approval of Supplier Quality Control plan (QCP / ITP) and other testing procedure.
Review of vendor technical offer & Participate in pre /post order supplier meetings.
Carry out inspection of critical stages of Instrumentation items at vendor's/sub vendor’s works as per
ITP/QCP and other contract documents.
2. Previously work (From Oct 2014 to NOV 2014) as a Project Manager (Electrical & Instrumentation) in M/S NORTH EAST ENGINEERING & CONSTRUCTION at GAIL LPG RECOVERY UNIT LAKWA SIVASAGAR ASSAM INDIA.
1.Material/ Job Planning and Job Execution of all Instrumentation Project activities & Major Shutdowns.
2.Loop check and functional check of Instruments.
3.Reviewing of Engineering Deliveries.
4.Coordination of Vendors and Sub Contractors.
5.Interact with Project, Procurement & Construction Team.
PROJECT NAME: - BCPL CRACKER COMPLEX ASSAM (GAS SPILLTER UNIT, C2 RECOVERY, DM PLANT AND C2 BULLET UNIT.
From Aug 2012 to SEP 2014 Previously working as a Sr.Site Engineer- Electrical &Instrumentation in SNC-Lavalin Engineering India Pvt. Ltd. (EPCM Consultant) at Numaligarh Refinery Ltd, ASSAM, and INDIA.
Responsibility:
1.Study of Tender Document, GAD, Lay-out Drawing, P&ID etc.
2. Study of S.O.R.
3.Cost/Man-Hour Estimates and Feasibility studies.
4.Planning of shutdown job activities.
5.Testing, Commisioning&Interlocking.
6.Cold loop & Hot Loop checking.
7.Preparation of AS-BUILT drawings & documents as per SITE requirements.
8.Advising the chief instrument/automation Engg in the planning and coordination of project activities in the department for smooth and efficient operation in the refinery.
9.Impulse tubing as per requirement with field instruments.
10. Execution Experience with major DCS systems (like Honeywell, Yokogawa).
11.Co-ordinate with Client & Contractor.
12.Loop Checking & Commissioning whole system along with contractor & client.
13.Checking of measurement bill for client.
14.Calibration & Testing of PSV.
15.Testing & Commissioning of RIM SEAL PROTECTION SYSTEM of FLOATING ROOF
a.TANK.
16.Erection, Testing & commissioning of MANUAL CALL POINT (FIRE ALARM SYSTEM).
17.Erection, Testing and Commissioning and Handling Over Of Electrical Equipment,
a.Earthing, Cabling, Illumination and other Miscellaneous Electrical Item.
Since JUNE 2008: with Indian Oil Tanking Engineering Projects. Ltd., as Junior Manager (E&I) The company is a subsidiary of Indian Oil tanking Ltd., a 50:50 joint venture company of Indian Oil Corporation Ltd. & Oil tanking GmbH, Germany. The core areas of function include Industrial Electro-Mechanical Projects for Refineries, Petrochemicals, Oil & Gas, Power, Fertilizers, Chemicals, Cement and other sectors.
1. From JAN.2011 to August 2012 working as a Jr. Manager (INSTRUMENTATION), Project LSTK (COKE DRUM SYSTEM PACAKAGE UNIT IOCL GUWAHATI).
2. From SEP2010 To DEC.2010 worked under organization “INDIAN OILTANKING ENGINEERING PROJECTS LIMITED” as JR. MANAGER (ELECTRONICS & INSTRUMENTATION) project under going “RELIANCE INFRASTRUCTURE ENGINEERS PVT. LTD. ROSA THERMAL POWER PROJECT, STAGE2 2X300 MW UNITS. ROSA, DIST.-SHAHJAHANPUR, UTTAR PARDESH.
3. From MARCH 2010- SEP2010 Worked “INDIAN OILTANKING ENGINEERING PROJECTS LIMITED” as PLANNING MANAGER.
Project undergoing “JAYPRAKASH ASSOCIATES LIMITED, JAYPEE BALAJI CEMENT PROJECTS” BUDWADA(VILLAGE) JAGGAYYAPET MANDAL,KRISHNA DISTRICT
ANDHRA PRADESH.
4. From NOV2009- FEB 2010 Worked as a Sr. Engineer “INDIAN OILTANKING ENGINEERING PROJECTS LIMITED”. Project undergoing “ACC LIMITED” WADI SITE GULBARGA KARNATAKA. Expansion work (from 6500 TPD to 13700 TPD-Largest Single Kiln in the World). It include complete E&I erection & commissioning work of LS Crusher, Stacker & Reclaimer (Coal & Lime stone), Raw Mill, Coal mill, PH & Cooler, .
5.From JUNE 2008 NOV.2009 Working under organization “INDIAN
OILTANKING ENGINEERING PROJECTS LIMITED”. Project completed“ACC LIMITED” KOLAR SITE THONDEBHAVI CHIKBALLAPUR KARNATAKA.
6. From SEP 2006- MAY2008 Worked as an INSTRUMENTATION ENGINEER an organization GLOBAL TOYO (TOYO ENGINEERING CORPORATION {A.N. Instruments Pvt. Ltd.}). Working area is EPCC-1 PROJECT NAME:- NAPTHA CRACKER UNIT, MAIN CONTROL ROOM AND FIRE AUXILAARRY UNIT
ACHIEVEMENTS
1.Certified Course in ‘INDUSTRIAL MEASUREMENTS”
2.Participated in ‘HARDWARE DESIGN CONTEST’ conducted by E.I.E. Deptt.
3.Participated in ‘QUIZ CONTEST’ conducted by E.I.E. Deptt.
4.1st position in Volleyball in Inter College Sports Meet.
5.Participate in 28th All India Sports Meet at BITS Pilani in 2003
6.Active Member of ELEC-TECH (Technical Group) at SASTRA.
7.Participate in State Level Rock Climbing Course at Jamshedpur, Jharkhand.
TECHNICAL EXPERTISE
OPERATING SYSTEM
: Win NT, WIN XPSP3/WIN7/WIN8, LINUX FEDORA5,MS WORD,EXCEL,POWER,POINT, AUTOCAD ELECTRICAL 2010,INTOOLS(SMART PLANTINSTRUMENTATION)
STRENGHTS
· Strong Interpersonal and Communication skills
· Ability to work in a team with diverse backgrounds
· Strong commitment to quality
· Determination, dedication, and discipline
· Willing to learn and adapt to new opportunities and challenges
DATE: (NIKHILKUMAR)